Alpha Magnetic Spectrometer Alpha Magnetic Spectrometer-02 ISS Digital Data Recording System (DDRS) ISS DDRS Project / ESCG Team.

Slides:



Advertisements
Similar presentations
Complete CompTIA A+ Guide to PCs, 6e
Advertisements

OCAMS Orbital Communications Adapter (OCA) Management System NASA/JSC/DO/Tim Hall Aug 2011.
+ Straight-Through Cable Construction Lab 4. + Data Transmission In data transmission system, the transmission medium is the physical path between transmitter.
Alpha Magnetic Spectrometer Alpha Magnetic Spectrometer – 02 DELTA CDR Permanent Magnet Avionics Changes Summary May 4, 2010 Timothy J. Urban / ESCG /
ISIM Integration & Test Mike Drury JWST-PRES
AMS-02 Rebaselining Outbrief ISS PIA/ICD & SSP MIP/ICD ISS Payload Mission Integration & Planning/OZ2 Space Shuttle Mission & Cargo Integration Office/MO3.
Peter Carafano, M.Ed. Associate Professor, Science Department Florida State University Schools.
Amateur Radio on the International Space Station (ARISS)
Training Purposes Only JEM PLT OV JMU (Ver. 1.0) 1 Notice : This technical data is furnished on the condition that it will be used by and.
MISSION OPERATIONS DIRECTORATE CARGO INTEGRATION AND OPERATIONS BRANCH Brion J. Au Johnson Space Center/DO55.
Presents The Silver Family An Integrated Approach to Processors, Data Communication and Head End Integration.
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
COMPUTER SYSTEM.
Rack Mounted Network Equipment Patch Panels Network Switch Router Rack Servers HDD Arrays UPS System Provides circuit protection and an uninterruptable.
Getting Started Installing GreenHills and Net+OS Setting up the Development Board Building the Sample Application.
Tutorial 11 Installing, Updating, and Configuring Software
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
Belgian User Support & Operations Centre Ham Video On-orbit Functional Commissioning - B.USOC Contribution ARISS Workshop 3 – 5 April 2014 ESTEC.
ISS-HAM Slow Scan Television (SSTV) Project A joint AMSAT-NA And MAREX-NA Project.
Hands-On Microsoft Windows Server 2003 Administration Chapter 2 Managing Windows Server 2003 Hardware and Software.
5-1 Constellation Space Suit System Government Capabilities and Facilities Crew and Thermal Systems Division.
Medical Consumables Tracking (MCT). Gap We do not have the capability to track medical inventory in a manor that integrates securely with the medical.
Page No. 1 Kelvin Nichols Payload Operations and Integration Center EO50 Delay Tolerant Networking (DTN) Implementation on the International Space Station.
Alpha Magnetic Spectrometer Alpha Magnetic Spectrometer – 02 Phase III PSRP / SRP Electronics Summary January 12, 2010 Timothy J. Urban / ESCG / Barrios.
1 Alpha Magnetic Spectrometer – 02 Phase III Flight Safety UPS Overview Jan John A. Heilig ESCG/Jacobs.
Space Systems Laboratory University of Maryland test.col.pp4 HERA: Hubble End-of-life Robotic Augmentation – A Robotic Alternative for SM-4 David L. Akin.
Welcome to the Johnson Space Center Common Communications for Visiting Vehicles (C2V2) for the International Space Station (ISS) Virtual Industry Day 1.
Section Number - 1 NASA’s Goddard Space Flight Center Communication Systems Jason A. Soloff NASA/GSFC Code 567 August 16-17, 2005.
March 2004 At A Glance NASA’s GSFC GMSEC architecture provides a scalable, extensible ground and flight system approach for future missions. Benefits Simplifies.
Communication, Navigation, and Networking reConfigurable Testbed (CoNNeCT): An International Space Station National Lab Ann P. Over Project Manager NASA.
AMS-02 Integration Cables Status and Electrical Integrated Testing Status Tim Urban / ESCG January 10, 2007 Alpha Magnetic Spectrometer.
Art Nelson, Jr.AMS-02 Technical Interchange Meeting - JSC - January Ground Safety Status.
Alpha Magnetic Spectrometer NASA / DOE National Aeronautics and Space Administration AMS-02 ROAD TO COFR Mike Fohey July 15, 2004.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
Mission Integration OZ2/Susan Lufkin/(281) Page No. 1 International Space Station Cube Lab Cube Lab Ops TIM - Ops Assessment Status 11/19/2009.
Mission Integration OZ2/Winston J. Reid/(281) Page No. 1 International Space Station Alpha Magnetic Spectrometer-02 AMS-02 Ops TIM - Ops Assessment.
1 AMS-02 POCC & SOC MSFC, 9-Apr-2009 Mike Capell Avionics & Operations Lead Senior Research Scientist ISS: 108x80m 420T 86KW 400km AMS: 5x4x3m 7T 2.3+KW.
Microgravity Science Glovebox Video Overview. Course: MSG05 Version: May 2014 For Training Purposes Only Course Description  Detailed presentation of.
1 MINUS EIGHTY DEGREE LABORATORY FREEZER FOR ISS (MELFI) MSFC Briefing February 2005 John Cornwell
Johnson Space Center, Houston TX Assembly and Disassembly Training Urine Monitoring System (UMS) 1 Familiarization Material for Assembly Task Training.
MSFC Payload Training bs/kh/ExpPldsTST#1/ 3/18/2016 Page 1 Astroculture-8 (ADVASC) TST #1 April 27, 1998 DTM/Beth Skidmore NASA/MSFC Training Branch Voice.
Note: Glacier is launched unpowered and hardmounted in EXPRESS Rack 6 on Flight ULF2. For the following three weeks after activation or transfer, two 2-hour.
Brandon Halleran.  The power supply for your personal computer gives your machine all the different voltages it needs to operate properly. It is able.
Date: September 24, 2007 Allen Taylor/TBE/FD35 Page: 1 HPA Hand Posture Analyzer Hardware Setup KAYSER ITALIA SRL Piazza 185° R.A. Folgore, 2/ Livorno.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama TIR overview for UBNT.
Urine Monitoring System (UMS) ISS UMS is a redesigned version of the Shuttle UMS.
Note: The first status check should occur on the launch flight day prior to crew pre-sleep. This is the only feedback the Glacier team has that the Glacier.
1 Space Test Program - Houston 4 Payload Overview POIWG, 26 Jul 2012.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Obsolescence Driven Avionics Redesign (ODAR) Status POIWG #31, January.
Lyndon B. Johnson Space Center Human Research Facility (HRF) HRF WORKSTATION 2 Brian Barras 1 HRF WORKSTATION 2 OVERVIEW/NOMINAL OPERATIONS Trainer: Brian.
February 14, 2013 POIWG Technical Overview CR / HM-3430 Ku Forward Capability.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Payload Operations and Integration Function Overview Payload Operations.
Page No. 1 Pre-decisional, For Internal Use Only Payload Network Attached Storage (NAS) for International Space Station (ISS) Operations Concept Sponsoring.
Phil Dempsey ISS Vehicle Office July 15, 2014 Inspection Considerations from the ISS Program NASA In-Space Inspection Workshop 2014.
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
S-band Telemetry Description DMC 211 October 2015.
MSG Laptop Computer (MLC) Transition to A31p Thinkpad.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG #35 January 27-31, 2014 Ann Bathew EO03/Operations Directors.
National Aeronautics and Space Administration (NASA) Glenn Research Center SAMS KU Forward Lessons Learned 1 Kevin McPherson NASA GRC Payload Operation.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Obsolescence Driven Avionics Redesign (ODAR) Status POIWG #32, July.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Radiation Environment Monitor Kevin Hargrave EO
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Kelvin Nichols, EO50 March 2016 MSFC ISS DTN Project Status.
Payload Inventory Management & Stowage Operations Processes 10/19/99 Point of Contact Gordon Boswell MSFC/POIF/OI (256)
Higher Active Logic Build Three (HAL 3) PLMDM Bundle Update Express Rack 4 Update David K Deitsch Marshall Space Flight Center Payload Operations & Integration.
Space Flight Simulator Instructional System
I&T&C Organization Chart
ISS Institutional DTN Overview for CCSDS
The computer work station
Lockheed Martin Canada’s SMB Mentoring Program
AMS Summary 16:00 on Tue 9 Jul 2019 (GMT 190) To
Presentation transcript:

Alpha Magnetic Spectrometer Alpha Magnetic Spectrometer-02 ISS Digital Data Recording System (DDRS) ISS DDRS Project / ESCG Team

Alpha Magnetic Spectrometer Agenda Background Objectives Description Interface Diagram April 26, 2010 ESCG2

Alpha Magnetic Spectrometer April 26, 2010 ESCG3 BACKGROUND From: The Alpha Magnetic Spectrometer (AMS) flew for the first time on STS-91 and was powered up on Flight Day 1. Data originally planned to be sent to ground stations through Discovery's KU- band communications system was recorded onboard because of a problem with the KU-band system. Data that could not be recorded by ground stations was recorded onboard throughout the mission. Less than <5% of the AMS-1 data made it to the ground by S-Band. On the last STS mission, Shuttle Ku Band was out of commission.

Alpha Magnetic Spectrometer ESCG4 OBJECTIVES Nominally: Provide a recording of the science data as close to the source as possible. –Contingency: Provide a means for the ISS crew to observe operational data of AMS-02. –Contingency: Provide a means for the ISS crew to command the AMS-02 payload. ISS DDRS command path to AMS-02 is via High Rate Data Link. In the event ISS data systems or ground commanding are unavailable AMS-02 can be completely operated from this alternate interface. April 26, 2010

Alpha Magnetic Spectrometer ESCG5 ISS Digital Data Recording System description: –Based on a NASA provided T61p ISS laptop, dedicated for AMS use –Would provide primary on-board data recording (24/7) –Would provide play-back capability to downlink lost or corrupted data –Uses ISSLAN Joint Station Lan (JSL) connection –Crew hard-disk change-out minimized by over-writing data on the AMS disk once it is verified on the ground - only used to prolong H/D life. Ensures data integrality if the event of ISS data systems and/or payload outages. Allows for contingency crew monitor of payload status and contingency crew commanding of payload systems via “Fn” keystrokes, based upon procedures, flight notes or A-to-G voice-loop. AMS02 ISS DDRS is a CB / STS-134 crew request. AMS-02 ISS DDRS Description April 26, 2010

Alpha Magnetic Spectrometer AMS-02 ISS DDRS Interfaces ESCG6 April 26, 2010 AMS-02 ISS DDRS INTERFACES Part Names reflect OpNom AMS LAPTOP SEG Enhanced A31p 16V DC Power Cable SEG DC Power 28V DC Cable Assembly SEG J1 - 28VDC AMS USB Cable SEG Nominal configuration: AMS HRDL Cable SEG (Length: 8 ft) UIP AMS Hard Drive Adapter SEG VDC Power (P1) J7 - HRDL P7 P2P1 AMS Hard Drive SEG AMS USB Cable SEG P2P1 AMS Transmitter Adapter SEG TxUSB A31p 28V DC Power Supply SEG P2 P1 RJ45 - Network EXPRESS RACK 6 PS28 Junction Box SEG P1 P2 J2J1 P1 P2 P1 MDL 3 J2 – DATA (Network) MDL 3 USB P1 AMS Cable Kit SEG Alternate configurations; not part of AMS Cable Kit: AMS Short Extension Cable SEG (Length: 6 ft) AMS Long Extension Cable SEG (Length: 40 ft) AMS Receiver Adapter SEG RxUSB J4J4 Desk Top Plate Assembly SED Multi Use Bracket Assembly SEG Location Assumption: MDL 3, Locker 8, Drawer 2, Seat track RED = Assumptions or To Be Determined Blue = AMS-02 ISS DDRS Project deliverables J5J5 P2 PS28 Cable Assembly SEG VDC, 20 AMP Adaptor Cable Assy SEG P1 P2 PS28 Power Strip Assembly SEG AMS Network Jack Assembly SEG AMS Network Cable SEG (Length: 9 ft) Alternate length: 40 ft; SEG )

Alpha Magnetic Spectrometer BACKUP SLIDES ESCG7 April 26, 2010

Alpha Magnetic Spectrometer ESCG8 April 13, 2010 ISS DDRS Installation Concept

Alpha Magnetic Spectrometer ESCG9 April 13, 2010 ISS DDRS Installation Concept SEG ft SEG SEG SEG SEG SEG SEG SEG SEG ft SEG (2X) 3ft SEG / -302 SEG and SED

Alpha Magnetic Spectrometer Documentation Updates G5787B - T61p GCAR add new components: alternate HDDs, cables, adapters. –CRCP to provide checklist to T61 Interface JSC T61p PTRS – no changes JSC T61p IRD – no changes; Memo documenting how ISS DDRS HW meets Section 4. MATL USA_R1 - Materials Analysis – update to apply to new HDDs & Cables ESCG10 April 13, 2010

Alpha Magnetic Spectrometer AMS-02 ISS DDRS Requested Certification Hardware ESCG11 April 13, 2010 Certification Testing Class 1 COTSClass 3Provided By T61p Laptop 12ISS T61p 160 GB C: Hard Drive (Prime installed) 12ISS T61p Internal Battery (installed) 12ISS T61p Ultrabay Adapter Assy (installed) 12ISS T61p Firmware/BIOS 12ISS T61 Power Supply 12 T61p Ultrabay Adapter Assy 12ISS

Alpha Magnetic Spectrometer AMS-02 ISS DDRS GFE Provided Parts/Materials ESCG12 April 13, 2010 Certification Testing Part NumberQtyProvided By T61p Laptop SEG ISS T61p 160 GB C: Hard Drive (Prime installed) SEG ISS T61p Internal Battery (installed) SEG ISS T61p Ultrabay Adapter Assy (installed) SEG ISS T61p Firmware/BIOS SKG _C 1ISS T61p 160 GB D: Hard Drive (uninstalled data spare) SEG ISS T61p Ultrabay Adapter Assy SEG ISS PGSC DC PWR cable SEG ISS DC PWR SUPLY SEG ISS DC PWR SUPLY cable SEG ISS PS28 Power Strip Assembly SEG On-orbit PS-28 Junction Box SEG On-orbit PS28 Cable Assembly SEG On-orbit 28 VDC, 20 AMP Adaptor Cable Assy SEG On-orbit Desk Top Plate Assembly SED ISS Multi-Use Bracket Assembly SEG ISS

Alpha Magnetic Spectrometer Deliverables: Hard Drive Assumptions AMS Hard Drive (SEG ) (7 of -801; 3 of -802) –COTS; 500GB or more –Acceptable alternate to (160 GB) SEG –Conformal coating to protect exposed circuitry on AMS drives –Compatible with Windows XP, AMS software –Compatible with SKG Firmware/Bios Configuration –Certification by similarity: EMI; no vibe, no thermal –Ionizing Radiation testing – Engineering eval only (Preferred HD + 2 alternate HDs) –GCAR functional testing: with T61p at SCTF lab –TPS: Sharp edges, burrs, labeling, cleanliness –AMS data & S/W is stand-alone and not part of the HD cert effort ESCG13 April 13, 2010

Alpha Magnetic Spectrometer ESCG14 Certification Approach: Modify existing T61p laptop Government Certification Acceptance Request: –Existing T61p GCAR is Criticality (Crit) 1 –AMS-02 ISS DDRS added to T61p GCAR as Crit 3 H/W and Crit 3 function AMS-02 ISS DDRS delivered per AMS process: DD-250 and JR-1027 ADP Testing: –EMI testing: (ISS levels: emissions and susceptibility) USB Adapters HDD may be by similarity, memo –Ionizing radiation susceptibility – mission success - engineering eval testing only –Early engineering evaluation functional at SCTF SVF –Interface Verification KSC test-bed with AMS Payload Analysis –Materials analysis memo (flammability, out-gassing, toxicity) AMS-02 ISS DDRS - Certification April 13, 2010

Alpha Magnetic Spectrometer ESCG15 April 13, 2010 ST Fiber Connector USB Connector ISS DDRS Design Status usb/HRDL Adapters SEG / -302 Labels will differentiate Transmitter & Receiver Purpose: Converts HRDL fiber signal to USB (one each transmit and receive). Design: Aluminum extruded housing, conformal coated PCB. Materials: IVA compatibility assessment to be performed.

Alpha Magnetic Spectrometer ACRONYMS ESCG16 AcronymDescription/Meaning AMSAlpha Magnetic Spectrometer COTSCommercial Off-the-shelf DDRSDigital Data Recording System EMIElectro-magnetic Interference ESCGEngineering Science Contract Group ESDElectrostatic Discharge GFEGovernment furnished equipment HDDHard Disk Drive HRDLHigh Rate Data Link ISSInternational Space Station ISSLANISS Local Area Network MDLMid-deck Locker PWRPower PDAPre-Delivery Acceptance PIAPre-Installation Acceptance TIMTechnical Interchange Meeting UIPUtility Interface Panel USBUniversal Serial Bus April 13, 2010