Government Labs 1.NRL 2.LLNL 3.SNL 4.LANL 5.ORNL 6.PPPL Universities 1.UCSD 2.Wisconsin 3.Georgia Tech 4.UCLA 5.U Rochester 6.PPPL 7.UC Santa Barbara 8.UNC.

Slides:



Advertisements
Similar presentations
Development Paths for IFE Mike Campbell General Atomics FPA 25 th Anniversary Meeting December 13,2004.
Advertisements

HAPL January 11-13, 2005/ARR 1 Overview of the HAPL IFE Dry Wall Chamber Studies in the US Presented by A. René Raffray UCSD With contributions from John.
M. S. Tillack, J. E. Pulsifer, K. L. Sequoia Grazing-Incidence Metal Mirrors for Laser-IFE Third IAEA Technical Meeting on “Physics and Technology of Inertial.
September 24-25, 2003 HAPL meeting, UW, Madison 1 Armor Configuration & Thermal Analysis 1.Parametric analysis in support of system studies 2.Preliminary.
Be/FS joining for ITER TBM Ryan Matthew Hunt FNST Meeting August 18, 2009 A collaboration between UCLA, SNL-Livermore, Brush-Wellman, Axsys Inc. and Bodycote.
Japan-US Workshop held at San Diego on April 6-7, 2002 How can we keep structural integrity of the first wall having micro cracks? R. Kurihara JAERI-Naka.
November 8-9, “Engineering Analysis” of He Retention & Release Experiments to Determine Desirable Engineered W Armor Microstructure A. René Raffray.
Assessment of Chamber Concepts for IFE Power Plants: The ARIES-IFE study Farrokh Najmabadi for the ARIES Team IFSA2001 September 9-14, 2001 Kyoto, Japan.
IFSA, Kyoto, Japan, September Dry Chamber Wall Thermo-Mechanical Behavior and Lifetime under IFE Cyclic Energy Deposition A. R. Raffray 1, D. Haynes.
May 31-June 1, 2001 A. R. Raffray, et al., Assessment of Dry Chamber Walls as Preliminary Step in Defining Key Processes for Chamber Clearing Code 1 Assessment.
Japan PFC/divertor concepts for power plants. T retention and permeation  Problems of T retention would not be serious…. Wall temperature will exceeds.
October 27-28, 2004 HAPL meeting, PPPL 1 Target Survival During Injection Presented by A.R. Raffray Other Contributors: K. Boehm, B. Christensen, M. S.
April 10, 2002 A. R. Raffray, et al., Dynamic Chamber Armor Behavior in IFE and MFE 1 Dynamic Chamber Armor Behavior in IFE and MFE A. R. Raffray 1, G.
A Target Fabrication and Injection Facility for Laser-IFE M. S. Tillack, A. R. Raffray, UC San Diego D. T. Goodin, N. B. Alexander, R. W. Petzoldt, General.
October 24, Remaining Action Items on Dry Chamber Wall 2. “Overlap” Design Regions 3. Scoping Analysis of Sacrificial Wall A. R. Raffray, J.
ARIES-IFE Assessment of Operational Windows for IFE Power Plants Farrokh Najmabadi and the ARIES Team UC San Diego 16 th ANS Topical Meeting on the Technology.
HAPL May 22-27, 2005 ISFNT-7, Tokyo, Japan 1 Progress Towards Realization of a Laser IFE Solid Wall Chamber A.R. Raffray 1, J. Blanchard 2, J. Latkowski.
Aug. 8-9, 2006 HAPL meeting, GA 1 Advanced Chamber Concept with Magnetic Intervention: - Ion Dump Issues - Status of Blanket Study A. René Raffray UCSD.
Highlights of ARIES-IFE Study Farrokh Najmabadi VLT Conference Call April 18, 2001 Electronic copy: ARIES Web Site:
Aug. 8-9, 2006 HAPL meeting, GA 1 Open Discussion on Advanced Armor Concepts Moderated by A. René Raffray UCSD HAPL Meeting GA, La Jolla, CA August 8-9,
August 30, 2001 A. R. Raffray, IFE Dry Chamber Wall Designs 1 IFE Dry Chamber Wall Designs A. R. Raffray and F. Najmabadi University of California, San.
1 MODELING DT VAPORIZATION AND MELTING IN A DIRECT DRIVE TARGET B. R. Christensen, A. R. Raffray, and M. S. Tillack Mechanical and Aerospace Engineering.
October 27-28, 2004 HAPL meeting, PPPL 1 Overview of the Components of an IFE Chamber and a Summary of our R&D to Develop Them Presented by: A. René Raffray.
The High Average Power Laser Program in DOE/DP Coordinated, focussed, multi-lab effort to develop the science and technology for Laser Fusion Energy Coordinated,
Computational Nano & Micro Mechanics Laboratory UCLA Measurement of Tungsten Armor - Ferritic Steel Interfacial Bond Strength Using a Nanosecond Laser.
HAPL WORKSHOP Chamber Gas Density Requirements for Ion Stopping Presented by D. A. Haynes, Jr. for the staff of the Fusion Technology Institute.
Plasma Arc Lamp Operation
Review of Results First Wall Helium Management & Refractory Armored Materials L L Snead, T. Hinoki, J. Hunn, C. Blue, N. Hashimoto (ORNL) R. Raffray (UCLA)
October 27-28, 2004 HAPL meeting, PPPL 1 Overview of the Components of an IFE Chamber and a Summary of our R&D to Develop Them Presented by: A. René Raffray.
Integrated Materials Plan Progress: Helium Blistering and Refractory Armored Materials Lance L Snead High Average Power Lasers Workshop December 6, 2002.
A Plan to Develop Dry Wall Chambers for Inertial Fusion Energy with Lasers Page 1 of 46 DRAFT.
1. Feb 2001:NRL 2. May 2001:NRL 3. Nov 2001:LLNL 4.Apr 2002:GA 5. Dec 2002:NRL 6. Apr 2003:Sandia 7. Sep 2003:Wisconsin 8. Feb 2004:Georgia Tech 9. Jun.
Long Term Exposure of Candidate First Wall Materials on XAPPER February – May 2004 Presented by: Jeff Latkowski XAPPER Team: Ryan Abbott, Robert Schmitt,
Si Nanocrystaline Diamond Foil Hibachi Window Testing and Development Background and Theory Pulsed Power System Electron Beam Electron Transmission Window.
Fracture of Tungsten in a HAPL Chamber Jake Blanchard HAPL MWG Fusion Technology Institute University of Wisconsin September 2003.
Plasma Processes, Inc. 1 Phase I SBIR: Engineered Surfaces for the Lithium Tokamak eXperiment (LTX) PFC Meeting May 9-11, 2005 Princeton, New Jersey Scott.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 1 Tungsten Armored Ferritic Steel Glenn Romanoski & Lance Snead June 2004.
Plan to Develop A First Wall Concept for Laser IFE.
Some Thoughts on Phase II for Target fabrication, injection, and tracking presented by Dan Goodin Georgia Institute of Technology February 5th & 6th, 2004.
1 1. Feb 2001:NRL 2. May 2001:NRL 3. Nov 2001:LLNL 4.Apr 2002:GA 5. Dec 2002:NRL 6. Apr 2003:Sandia 7. Sep 2003:Wisconsin 8. Feb 2004:Georgia Tech 9. Jun.
The Plan to Develop Laser Fusion Energy John Sethian Naval Research Laboratory July 19, 2002.
July 11, 2003 HAPL e-meeting. 1 Armor Design & Modeling Progress A. René Raffray UCSD HAPL e-meeting July 11, 2003 (1)Provide Parameters for Chamber “System”
The High Average Power Laser (HAPL) Program We are developing Fusion Energy with lasers, based primarily on direct drive targets and dry wall chambers.
Materials Discussion / Integrated Testing Plan Final Optics Transmissive - issues related to absorption Reflective - LIDT and effect of dust - neutron-induced.
Update on ORNL Diagnostic and Tungsten Armor Efforts Keith Leonard, Glenn Romanoski, Lance Snead Oak Ridge National Laboratory Nalin Parikh UNC, Chapel.
Materials Studies on Z (x-rays) and RHEPP (ions) C.L. Olson, T.J.Tanaka, T.J. Renk, G.A.Rochau, M.A. Ulrickson Sandia National Laboratories, Albuquerque,
1 Neutronics Assessment of Self-Cooled Li Blanket Concept Mohamed Sawan Fusion Technology Institute University of Wisconsin, Madison, WI With contributions.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 1 Update on Helium Retention Behavior in Tungsten D. Forsythe, 1 S. Gidcumb, 1 S. Gilliam,
Welcome to the eighth HAPL meeting Courtesy, Mark Tillack, UCSD.
Update on Roughening Work Jake Blanchard HAPL MWG Fusion Technology Institute University of Wisconsin e-meeting – July 2003.
1 Neutronics Parameters for the Reference HAPL Chamber Mohamed Sawan Fusion Technology Institute University of Wisconsin, Madison, WI With contributions.
WELCOME Fifth Laser IFE (HAPL) Program Workshop Naval Research Laboratory Dec 5 and 6, 2002.
The tungsten/F82H sample was impinged at 6 different locations with 6 different laser fluence energies to determine the critical energy that would result.
February 5-6, 2004 HAPL meeting, G.Tech. 1 Chamber Tasks Coordination Presented by A. René Raffray UCSD With contributions from J. Blanchard and the HAPL.
Overview of HAPL First Wall Materials Issues HAPL Materials and Design Team HAPL Average Power Laser Program Workshop Princeton Plasma Physics Laboratory.
1 1. Feb 2001:NRL 2. May 2001:NRL 3. Nov 2001:LLNL 4.Apr 2002:GA 5. Dec 2002:NRL 6. Apr 2003:Sandia 7. Sep 2003:Wisconsin 8. Feb 2004:Georgia Tech 9. Jun.
Temperature Response and Ion Deposition in the 1 mm Tungsten Armor Layer for the 10.5 m HAPL Target Chamber T.A. Heltemes, D.R. Boris and M. Fatenejad,
Plasma Processes, Inc. February 5-6, Engineered Tungsten for IFE Dry Chamber Walls HAPL Program Meeting Georgia Institute of Technology Scott O’Dell,
Surface Effects and Retention of Steady State 3 He + Implantation in Single and Polycrystalline Tungsten S.J. Zenobia, G.L. Kulcinski, E. Alderson, G.
1. Feb 2001:NRL 2. May 2001:NRL 3. Nov 2001:LLNL 4.Apr 2002:GA 5. Dec 2002:NRL 6. Apr 2003:Sandia 7. Sep 2003:Wisconsin 8. Feb 2004:Georgia Tech 9. Jun.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 1 Chamber Materials Progress Round Robin Materials Refractory Armored Ferritic Helium Management.
1. Feb 2001:NRL 2. May 2001:NRL 3. Nov 2001:LLNL 4.Apr 2002:GA 5. Dec 2002:NRL 6. Apr 2003:Sandia 7. Sep 2003:Wisconsin 8. Feb 2004:Georgia Tech 9. Jun.
February 5-6, 2004 HAPL meeting, G.Tech HAPL Chambers and Materials Effort Introduction 2. Chamber Tasks Coordination Presented by: A. René Raffray.
350 MJ Target Thermal Response and Ion Implantation in 1 mm thick silicon carbide armor for 10.5 m HAPL Chamber T.A. Heltemes and G.A. Moses Fusion Technology.
1 1. Feb 2001:NRL 2. May 2001:NRL 3. Nov 2001:LLNL 4.Apr 2002:GA 5. Dec 2002:NRL 6. Apr 2003:Sandia 7. Sep 2003:Wisconsin 8. Feb 2004:Georgia Tech 9. Jun.
S.I. Golubov, S.J. Zinkle and R.E. Stoller
Update on Helium Management and Tungsten Bonded Ferritic
Tungsten Armor Engineering:
Welcome to the sixth HAPL meeting
University of California, San Diego
Presentation transcript:

Government Labs 1.NRL 2.LLNL 3.SNL 4.LANL 5.ORNL 6.PPPL Universities 1.UCSD 2.Wisconsin 3.Georgia Tech 4.UCLA 5.U Rochester 6.PPPL 7.UC Santa Barbara 8.UNC 9.DELFT Industry 1.General Atomics 2.Titan/PSD 3.Schafer Corp 4.SAIC 5.Commonwealth Tech 6.Coherent 7.Onyx 8.DEI 9.Mission Research Corp 10.Northrup 11.Ultramet, Inc 12.Plasma Processes, Inc 13.Optiswitch Technology 14.Plasma Processing, Inc IFE First Wall Survival Development and Testing of an Armored Ferritic L L Snead, G. R. Romanoski, C. A. Blue, and J. Blanchard Presented at the 16th TOFE, Madison Wisconsin September 16, 2004

HAPL IFE First Wall Materials Carbon and refractory metals (tungsten) considered - Reasonably high thermal conductivity at high temperature (~ W/m-K) -Sublimation temperature of carbon ~ 3370°C -Melting point of tungsten ~3410°C In addition, possibility of an engineered surface to provide better accommodation of high energy deposition is considered - tungsten coated ferritic or SiC - carbon brush structures - tungsten foam

Unique Threats to IFE First Wall Intense cyclic heating - stresses and sublimation due to pulse heating (Renk talk this session) - cyclic stress induced debonding - long-tem thermal stability Surface removal due to high energy ions.

Temporal Distribution of Heat Flux Debris Ions 10ns 0.2  s 1s1s 2.5  s Fast Ions Photons Energy Deposition Instantaneous Heat Flux 10 MW/m 2 (MFE) = 10 4 MW/m 2 (IFE)

Effect of Heat Flux on W-Armor Coated SiC Time (microseconds) Raffray data

Fabrication Process : W/F82H Two processes for bonding low activation ferritic to tungsten are considered: Diffusion Bonding and Plasma Spray: I. Diffusion-bonded tungsten foil (.1 mm thickness) - Allows the best possible mechanical properties and surface integrity - Tungsten will remain in the un-recrystallized state - No porosity --> Plates of W/Fe (ORNL) have been produced and are being tested. II. Plasma-sprayed tungsten transition coatings - Allows for a graded transition structure by blending tungsten and steel powders in an intermediate layer to accommodate CTE mismatch. - Resulting microstructure is recrystallized but small grain size - May be spayed in vacuum or under a cover gas (wall repair) - Variable porosity --> Plates of W/Fe (Plasma Processed Inc.) have been produced and are being tested.

Testing of Armored Ferritic : W/F82H The primary concern for armored materials is the survival of the interface: --> CTE mismatch produced during processing --> Stressed induced during pulsed heating --> Stability of a “ductile” interfacial region on long-term annealing Temperature (°C) Specimen Expansion (ppm)

High Density Infrared (HDI) Plasma Arc Lamp Technology  Unique high density infrared plasma arc lamp  Most powerful radiant arc lamp in the world  Broad area processing with high radiant energies  Conservative heating rates  2,000  C/s to 20,000  C/s  Allows controlled diffusion on nanometer scale  Able to melt Rhenium  Melting point of 3180  C

Thermal Fatigue Testing Rep rate: 10Hz Max. flux: 20.9MW/m 2 (20ms) Min. flux: 0.5MW/m 2 (80ms) Duration: 1000 cycles Substrate temp. (bottom): 600 ºC Substrate material: F82H steel Coating material: tungsten (100µm-thick) Specimen size: 25 x 25 x 5 (mm) W coated specimen Cooling table

Thermal Fatigue Testing  IR testing closely matches stress state at interface.  Flexural tests will be performed on samples that incorporate the W armor and substrate to quantify the mechanical strength of the interface at different cycle durations and following thermal aging. Stress (MPa) Depth (mm) Blachard results

Thermal Fatigue Testing Rep rate: 10Hz Max. flux: 20.9MW/m 2 (20ms) Min. flux: 0.5MW/m 2 (80ms) Duration: 1000 cycles Substrate temp. (bottom): 600 ºC Substrate material: F82H steel Coating material: tungsten (100µm-thick) Specimen size: 25 x 25 x 5 (mm) W coated specimen Cooling table

No obvious degradation of adhesion of W to F82H following fatigue testing For these fatigue tests, carbide dissolution indicating interface >900°C As Deposited Diffusion Bonded Plasma Sprayed 1000 shot, 20 MW/m 2 W Coated F82H After Thermal Fatigue Testing

W Coated F82H After 10,000 Cycle Fatigue Testing  In interface over-temperature (>900°C) a W-Fe intermetallic forms.  Formation of W-Fe brittle phase will likely lead to interface fracture and coating failure.  Isothermal aging experiments will be performed on W / F82H samples to demonstrate the temperature and time limitations of the interface. W FeW F82H Steel

Thermal Fatigue Facility Upgrades for Prototype Testing (complete 2005) Continuous operation: 1 msec, 5 Hz at 100 MW/m2 300 cm2 surface area irradiation Front surface temperature monitoring Fabrication of cooled prototype plasma spray tungsten armored low-activation ferritic

Helium Management At room temp. growth of He bubbles beneath the surface causes blistering at ~3 x /m 2 and surface exfoliation at ~10 22 /m 2. For IFE power plant, MeV He dose >>> /m 2. MeV Helium First Wall Armor vacancy Time of microseconds

Effect of Iterative Implant/Anneal on Retained Helium 1.3 MeV He implantation Poly-X tungsten target Resistive Heating A series of implantation to He/m 2 for 1, 10, 100 and 1000 cycles has been completed

Effect of Iterative Implant/Anneal on Retained Helium 1.3 MeV He implantation Poly-X tungsten target Resistive Heating Implantation to He/m 2 for 1, 10, 100 and 1000 cycles

Total 3 He dose (10 19 He/m 2 ) Proton Yield (  10%) Determination of critical step size  For Single-X W critical step size ~3·10 16  Helium doses implanted at 850°C and flash-annealed at 2000°C in 1000 cycles

Update on Effect of Peak Annealing Temperature Single x annealed at 2500°C shows significantly less He retention than 2000°C anneal. Annealing temperature plays a significant role in retained He and critical dose. As part of the chambers study we need to make precise assessment of implantation and annealing temperatures to focus experiment. 2500°C 2000°C

Concluding Remarks The HAPL program has selected refractory armored low-activation ferritic steel as it’s prime candidate first wall. Currently, optimization of the plasma-sprayed W/F82H steel in near completion and mechanical testing underway. IFE-unique critical-issues are being pursued - X-ray and ion ablation and roughening (Renk and Latkowski) - thermal fatigue of tungsten ferritic interface - long-term thermal stability - helium management  Special issue of Journal of Nuclear Materials on subject of HAPL chamber currently being assembled.

SiC without coating SiC W coating IR processing 10µm Interface SiC was removed by sublimation of the surface of the SiC prior to ordering the W powder melt. Rough interface was formed. Fabrication Process : W/SiC Tungsten Powder

The Path to Develop Laser Fusion Energy Phase II Validate science & technology Phase III Engineering Test Facility operating  2020  Full size laser: 2.4 MJ, 60 laser lines  Optimize targets for high yield  Develop materials and components.   MW net electricity  Resolve basic issues by 2028 Phase I Basic fusion science & technology Ignition Physics Validation MJ target implosions Calibrated 3D simulations Target Design & Physics 2D/3D simulations 1-30 kJ laser-target expts Full Scale Components Power plant laser beamline Target fab/injection facility Power Plant design Scalable Technologies Krypton fluoride laser Diode pumped solid state laser Target fabrication & injection Final optics Chambers materials/design

Chamber Progress -1 Operating windows Establishing Chamber operating windows is a multidisciplinary, simulation intensive, process Here is an example for a 154 MJ target. UCSD Wisconsin LLNL GA Target Physics: gives target emissions (neutrons, x-rays, ions) Chamber Physics: What hits wall: "threat spectra" Materials: How wall responds to "threat spectra" Target Injection Survival: allowed chamber conditions (gas, wall temperature) Tungsten first wall temperature stays below melting point (tungsten melts at 3410  C) Temperature (  C) 154 MJ target No gas 6.5 m radius

Summary of Thermal Fatigue Experiment Thermal fatigue experiments were carried out successfully using IR processing facility. Preliminary results showed tungsten coating was stable following the heat load (10Hz, 23.5MW/m 2 (10ms), 1000cycles).

Porous W StructureMonolithic W Candidate First Wall Structure W/LAF (W/SiC Backup) LAF(~600°C max) or ODS(~800°C) structure, possibly both. Liquid Metal Helium,or Salt Coolant? Development of Armor fabrication process and repair He management mech. & thermal fatigue testing Surface Roughening/Ablation Underlying Structure bonding (especially ODS) high cycle fatigue creep rupture Armor/Structure Thermomechanics design and armor thickness finite element modeling thermal fatigue and FCG Structure/Coolant Interface corrosion/mass transfer coating at high temperature? Modeling Irradiation Effects swelling and embrittlement

Helium Management (ORNL, Delft, UNC) Parametric Study Variables Techniques Data Materials Temp. Dose Single-XIrrad. Temp Total DoseNuclear Reaction Analysis N He, % retention Poly-XAnneal Temp Dose IncrementThermal Desorption Diffusivity/Activation Energy CVDAnneal RateTEM/SEM Defect size and distribution Foam weak dependence on material type strong dependence on implantation temperature annealing from °C diffuses significant helium ----> there are knobs to turn that delay exfoliation in W