Electronics Recycling Overview Will Wyman Texas Commission on Environmental Quality.

Slides:



Advertisements
Similar presentations
SW101 The NPDES Industrial Storm Water Program. What Does the Industrial Program Cover? F Storm Water Discharges Associated with Industrial Activity l.
Advertisements

Presented by: Name, Title Date For Client Name Universal Waste Don Gansert Managing Consultant September 18, 2008.
Rules and Records for Generators Manifesting and Transporting Used and Scrap Tires Jaime Garza, Will Wyman, and Jonathan Diaz Texas Commission on Environmental.
Recycling The Basics. Will Wyman. Small Business & Local Government Assistance Section.
Oil and Gas Air Quality Authorizations in Texas
STORMWATER PERMITTING Requirements for the Solid Waste Industry in Colorado 5/04.
DEP’s Universal Waste Used Electronics Rule Ross Bunnell, Sanitary Engineer DEP/Bureau of Waste Management Engineering & Enforcement Division.
Hazardous Waste Issues Associated with Municipal Operations Dan Sowry Environmental Specialist Office of Compliance Assistance and Pollution Prevention.
Part 5 Rules Spillage of Oil and Polluting Materials Tracy Kecskemeti DEQ Water Bureau Southeast Michigan District Office
Standardized Authorizations (Permits by Rule & Standard Permits)
The Texas Commission on Environmental Quality and the Oil and Gas Industry An Overview.
Air Permitting Overview.
Virtual Environmental, Health & Safety Manager Compliance Management System T. Cozzie Consulting, Inc. telephone
What is RCRA? The Resource Conservation and Recovery Act (RCRA) was passed in 1976 as an amendment to the Solid Waste Disposal Act. Amendments were added.
Recycling The Basics. Will Wyman Small Business & Local Government Assistance Section.
RCRA Record Keeping and Reporting For Small Quantity Generators
Susan Palachek TCEQ Pollution Prevention & Education.
Universal Waste Rule 40 CFR Part 273 Promulgated May 11, 1995 (60 FR 25492) Batteries Hazardous Waste Lamps Thermostats Pesticides
Applying for the VT Multi-Sector General Permit Step 3. Claiming No Exposure No Exposure is one of two ways to comply with the MSGP. It is the quickest.
Understanding New Jersey’s Universal Waste Rules
The Cost of Clean Air FEES REVISED: 2011 NACAA Membership Meeting Cleveland, OH October 5, 2011.
1 Understanding New Jersey’s Universal Waste Rules New Jersey Department of Environmental Protection Solid and Hazardous Waste Management Program Ralph.
OMNI FACILITY SERVICES Copyright  Progressive Business Publications Handling Hazardous Wastes.
Community Collection Events Stephanie Cunningham, TCEQ.
PERMITTING ELECTRIC GENERATING UNITS Jim Linville & Erik Hendrickson Air Permits Division.
Medical Waste Management Rulemaking Open Participation Meeting Texas Commission on Environmental Quality Waste Permits Division August 18, 2015, Austin.
Waste Management Routine or Non-Routine Waste Generation Activities Remediation/Construction Projects Spills WM.
Joseph G. Maternowski Moss & Barnett, P.A. Minnesota Environmental Institute April 21, 2011 Minneapolis, Minnesota.
Revised Definition of Solid Waste Rule Jesse Boultinghouse Waste Permits Division May 6, 2015 TCEQ Environmental Trade Fair.
Daniela Ortiz de Montellano & Mario Perez 2015 TCEQ Environmental Trade Fair MEDICAL WASTE MANAGEMENT REGULATIONS FOR THE HANDLING, TREATMENT & PROPER.
LEGISLATION UPDATE Tessa Bowering Senior Environment Officer.
Presented to Georgia Airports Association Conference October 21, 2009 EPA Spill Prevention Control and Countermeasures – Update Also – What’s Coming with.
Waste Management Issues for Hospitals/Healthcare Facilities.
Notice of Intent to Operate Municipal Solid Waste (MSW) Facilities Tamara A. Young Environmental Permit Specialist Waste Permits Division 2015 TCEQ Environmental.
TCEQ Environmental Trade Fair
Web Resources Michael Gage New Jersey Department of Environmental Protection County Environmental and Waste Enforcement Special Investigations and Oversight.
MEDICAL WASTE MANAGEMENT REGULATIONS FOR THE HANDLING, TREATMENT & PROPER DISPOSAL OF MEDICAL WASTE, INCLUDING EBOLA WASTE Daniela Ortiz de Montellano.
Industrial & Hazardous Waste Permits Section Overview
MassDEP Underground Storage Tank Program Program Requirements for Owners and Operators Winter 2015 Workshops 1.
Understanding New Jersey’s Universal Waste Rules Bureau of Hazardous Waste & UST Compliance and Enforcement Martin E. Sánchez.
Texas Commission on Environmental Quality “Texas Shingle Recycling Programs: A Technical Webinar” January 13, 2011.
Environmental Regulation.  Complex set of laws  Constantly changing  Cover: Release, treatment, storage and disposal of Hazardous materials Into air,
Waste and Hazardous Materials
Page 1 Electronic Waste. Page 2 U.S. Landfill Ban and/or Legislation Landfill Ban and/or Legislation 2008 Landfill Ban and/or Legislation.
Susan Palachek TCEQ Pollution Prevention & Education.
Texas Pollutant Discharge Elimination System Stormwater Multi-Sector General Permit (MSGP) TXR Overview and Renewal May 19, 2016 Rebecca L. Villalba.
Goals: ◦ Minimize the environmental impacts of construction projects and tasks undertaken at the Lab; ◦ Remain in compliance with environmental rules;
30 Texas Administrative Code Chapter 210, Subchapter E Presented by Kara Denney September 23, 2015.
TCEQ Environmental Trade Fair New TCEQ Rules: E-manifest, Steel Slag, Cathode Ray Tube & Revised Definition of Solid Waste Cynthia Palomares, P.G., P.E.
Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2016.
Composting in Texas 2017 TCEQ Trade Fair Mamadou Balde, P.G.
Oil & Gas Waste Stream Management and Permitting Options
Electronic Recycling Investigations
Lecture (11): Waste Recycling
Iowa Waste Reduction Center Jennifer Wittenburg - Program Manager
Overview of Universal Waste (UW) Lamp Crushing in Virginia
2017 Environmental Trade Fair Shannon Gibson
Program Overview: Electronics Recycling
Industrial & Hazardous Waste Updates and Emerging Issues
Texas Pollutant Discharge Elimination System Stormwater Multi-Sector General Permit (MSGP) TXR Dan Siebeneicher Texas Commission on Environmental.
UNIVERSAL WASTE and ELECTRONIC EQUIPMENT
Jesse Boultinghouse Waste Permits Division TCEQ Trade Fair May 3, 2016
Exemptions From Industrial and Hazardous Waste Permitting Requirements
Program Overview: Household Hazardous Waste (HHW)
2018 Environmental Trade Fair Shannon Gibson
Annual Enforcement Report Overview
TOOLS FOR HIGH QUALITY APPLICATIONS (AKA “Streamlining”)
2019 Environmental Trade Fair & Conference Monica Vallin-Baez
What is driving this change????
Presentation transcript:

Electronics Recycling Overview Will Wyman Texas Commission on Environmental Quality

SBLGA Programs Offer:

TCEQ Waste Rules. Title 30 Texas Administrative Code (TAC). – Chapter 328 Subchapter A: Waste Minimizations and Recycling. – Chapter 330, Municipal Solid Waste. – Chapter 335, Industrial and Solid Waste. Subchapter H. Division 5. Universal Waste. Subchapter N: Household Hazardous Waste.

Source-Separated Recycling. If a facility receives, processes, and returns to use only nonputrecible, source-separated recyclable materials diverted from a municipal solid waste stream, the recycling facility will be exempt from permitting and registration requirements provided it complies with certain requirements.

Exemptions From Permitting and Registration (MSW). Recycling Facilities are generally exempt if they accept : – non-putrescible matter – source-separated from MSW waste – No more than 10% per incoming load

Industrial Notification? Are you getting material from an Industrial Facility that’s reporting it as a waste to TCEQ? Notification Requirements: – TCEQ-0524 if you receive non-haz industrial materials – TCEQ-0525 if you are a generator recycling hazardous or industrial waste.

MSW Notice of Intent? 30 TAC (storage) and (recordkeeping). Exempt from a MSW Notice of Intent (NOI)? – Are a local government or an agency of state or federal government; or Receive > 50% of your materials from: – Generators/haulers not affiliated with the facility or from the public; and receive no financial compensation;

NOI Exempt Continued? Material is potentially recyclable; or Are a smelter of recyclable metals or affiliated with a smelter; or Are owned/operated by a person who holds a permit to dispose of municipal solid waste. Exempt from and – Recordkeeping and reporting requirements but not Sound Environmental Management.

Not exempt from (Storage). Store only source-separated, non-putrescible recyclable materials.. Materials must be shipped to prevent accumulation (50% every 6 months). Limit non-recyclables (<10% per load & <5% per 6 months) and keep records.. Waste must be disposed of properly!

Reporting & Recordkeeping Notice of Intent (NOI) – TCEQ Core Data Form – TCEQ owner and operator*. Financial Assurance (if storing combustible materials outdoors)*. Fire Prevention Suppression Plan*.

NOI Summary Screen shot of Municipal Solid Waste Permits Web page “Am I Regulated?” for recycling.

Regulatory Status of Specific Electronics. When is it a waste? – When the recycler decides that the material can not be reused, further de-manufactured, or recycled.

Regulatory Status of Specific Electronics Continued State and Federal Exemption. – Processed scrap metal being recycled. – Shredded circuit boards being recycled 40 CFR (a)(13-14).

Regulatory Status of Specific Electronics Continued Universal Waste Option. – Hazardous Waste Batteries. – Mercury Containing Equipment. Used Equipment from Households (HHW). Cathode Ray Tubes (CRTs). – If being recycled it’s not a solid waste. CFR 261.4(a)(23), must meet conditions of

Regulatory Requirements for Electronics Disposal. Hazardous Waste – Conditionally Exempt Small Quantity Generator (CESQG). – Less than 220/lbs month of hazardous waste. – Guidance RG-022,Classification of Industrial and Hazardous Waste and RG-234, Industrial and Hazardous Waste Rules for SQGs.

Regulatory Requirements for Electronics Disposal. Discarded for Disposal or can’t be used for intended purpose; No longer recyclable, or not an exempt material.

Storm Water – TXR Multi-Sector General Permit for Storm Water. – Triggered by Standard Industrial Code. – Sector N, SIC Code – Pollution Prevention Plan. – Notice of Intent for Storm Water (Form – 10382). Storm Water Discharges from Industrial Facilities: Am I Regulated ? Assistance Tools for Storm Water Permitting.

Conditional No Exposure Exclusion. If SIC code Triggers Permit. Exclusion can be claimed if materials are isolated from snow, rain, snowmelt, runoff by storm resistant shelters, or stored indoors. Apply for TCEQ – Application fee $100. – Be able to say NO to all 11 questions on the form.

Air Regulations. De Minimis. Permits by Rule. Standard Permits. State Permits. NNSR and, PSD. Pyramid showing Increasing emissions

Air Continued PBRs. Must meet all conditions exactly. – Controls built into rule. 30 TAC 106 Permits By Rule. One Liners or Registration. Possible distance set-back requirements.

Air PBRs Continued. PBRs: – Fast processing time - 45 days max. – Fee required at time of registration ($100 or $450). – Types of activities: grinding, shredding, tools, soldering, handheld and manually operated. – If an activity is not listed then a general PBR can be claimed with certain calculations under 30 TAC

Resources. Regulations, Resources, and Guidance on Recycling Electronic Equipment. recycling/erecycling-regs.html. Small Business & Local Government Assistance E- Cycling page:

Small Business & Local Government Assistance. Confidential Hotline: Monday – Friday.