3 Oct 2006 1 Cost and Schedule Update Craig Ogilvie, Iowa State University Analysis of system risks Update schedule  Critical path.

Slides:



Advertisements
Similar presentations
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
Advertisements

The Intermediate Silicon Layers detector OUTLINE ISL inside CDFII Why the ISL? Conceptual Design Ladders and Spaceframe Rasnik Online Alignment System.
PHENIX Vertex Tracker Atsushi Taketani for PHENIX collaboration RIKEN Nishina Center RIKEN Brookhaven Research Center 1.Over view of Vertex detector 2.Physics.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
David L. Winter for the PHENIX Collaboration PHENIX Silicon Detector Upgrades RHIC & AGS Annual Users' Meeting Workshop 3 RHIC Future: New Physics Through.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
H. MatisTracking Upgrade Review – Dec. 7, SSD Update Howard Matis.
1 SSD status report – 16 July 2004 Jerome Baudot, Strasbourg STAR Collaboration Meeting BNL, 16 July 2004 Silicon Strip Detector status report  Report.
1 Jim Thomas - LBL 4.2 Meters ~ 1 Meter The SSD: March Face to Face Meeting Jim Thomas Lawrence Berkeley Laboratory March 14 th, 2012 The SSD.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
6/6/ PHENIX WEEKLY PLANNING 6/6/2013 Don Lynch Note: No PHENIX planning meeting this week due to end of run party. Feel free to discuss safety and.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
Robert Pak 1 DOE VTX Review June 2, 2009 Mechanical Integration & Safety Personnel: Walt Sondheim: Mechanical Project Engineer Don Lynch: PHENIX Chief.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
TOF Project Construction Project Plan
1 US Pixel Mechanics Role Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56)
SSD Status Report July SSD Status Report accessible from STAR group documents Pictures Updated documentation.
Muon trigger upgrades, missing since not aimed towards DOE funding PHENIX upgrades: view presented to DOE R&D $3.5M Construction $16.6M Au-Au p-p 200 Si-Si.
Silicon Stripixel Detector Status Rachid Nouicer Brookhaven National Laboratory (BNL) DOE Review of the PHENIX VTX Detector, June 2 nd, Executive.
12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
David Lee, FVTX Review Nov Cost and Schedule WBS 1.0 David M. Lee Los Alamos National Lab Deputy Project Leader.
1 US Cost & Schedule Summary W. R. Edwards US Project Manager CD-2/3a Review January 8, 2008 BNL.
Robert Pak DOE Review Jan. 19, Robert Pak 1 DOE Review Jan. 19, 2005 VTX HBD PHENIX Central Region From VTX Proposal (dims in mm) Integrate Detector.
Aug 2003 Craig Ogilvie 1 Landscape/Goals for R&D  Goal: Barrel+structure ready Summer/Fall 06 (run07)  Goal: Endcaps ready Summer/Fall 07 (run08)  RIKEN.
C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , The DEPFET-Project: European Collaboration for a Pixel SuperBelle.
Robert Pak, FVTX Annual Review Nov Mechanical Integration WBS Robert Pak Brookhaven National Laboratory.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 16-Nov-2009.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
Brenna Flaugher Sept. 24 th Lehman Review1 Run IIB Silicon Upgrade: Cost and Schedule Lehman Review Sept. 24, 2002 Brenna Flaugher Run IIB Silicon Project.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Cost and Schedule.
M. Gilchriese Items from Talks U.S. Pixel Meeting Santa Cruz July 2003.
Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs Cost Schedule.
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
Craig Ogilvie Strip FEE electronics that are common between stripixel or conventional sensor choice Stripixel tests/plans to establish manufacturability.
Jun 2003 Craig Ogilvie 1 Landscape/Goals for R&D  Goal: Barrel+structure ready Summer/Fall 06 (run07)  Goal: Endcaps ready Summer/Fall 07 (run08)  RIKEN.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
PHENIX Vertex Detector with Conventional Strip Sensors Abhay Deshpande Stony Brook University.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
Robert Pak VTX Meeting Sept. 7, 2004 VTX. Robert Pak VTX Meeting Sept. 7, 2004 PHENIX Central Region From VTX Proposal (dims in mm) HBD is standalone.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
Pixel Atsushi Taketani RIKEN RIKEN Brookhaven Research Center 1.Overview of Pixel subsystem 2.Test beam 3.Each Components 4.Schedule 5.Summary.
Columbia University IN THE CITY OF NEW YORK FVTX Electronics Oversight and Integration Eric J. Mannel Columbia University.
Robert Pak VTX Meeting June 3, Robert Pak 1 VTX Meeting June 3, 2005 General Progress Started general integration meetings for detector upgrades.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
Robert Pak, FVTX Annual Review, Nov WBS Mechanical Integration Personnel: Walt Sondheim: Mechanical Project Engineer Don Lynch: PHENIX Chief.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
5/30/20131 PHENIX WEEKLY PLANNING 5/30/2013 Don Lynch.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
Columbia University IN THE CITY OF NEW YORK VTX Electronics Integration E.J. Mannel Columbia University DOE Review June 2-3, 2009.
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
1 FVTX Quarterly/Monthly Report July 2008 Melynda Brooks, Dave Lee.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
Si Sensors for Additional Tracker
HFT Overview Flemming Videbæk BNL 3/14/12 F2F LBNL.
WBS 1.03 Readout Systems Scope, Cost and Schedule
7th Belle II VXD Workshop, Prague
Face to Face Meeting – March 2012 Sarah Morgan
Radiation Laboratory Meeting
Maki KUROSAWA VTX Group 2014 Feb 20
Presentation transcript:

3 Oct Cost and Schedule Update Craig Ogilvie, Iowa State University Analysis of system risks Update schedule  Critical path Quantitative milestones  Project completion requirements Manpower summary  MoUs Budget summary

3 Oct System Risks Action item: “Complete a more comprehensive risk analysis and update the cost and schedule contingency analysis as appropriate, prior to project initiation.” “The overall understanding of the risks may be actually missing. It is also interesting to think about the project as a whole, and try to identify the risks [..snip..] and the consequences of these risks happening. Contingency plans can then be envisioned to control and mitigate the impact of these risks. System managers were asked:  “what keeps you awake at night” (about the VTX:) 10 areas identified  Mitigation Explicit planning, resources, milestones when passed

3 Oct Identified system risks (I to V) Pixel/Strip performance in close proximity  Two rounds combined pixel+strip ladders tests, winter 06, summer 07 Thermal stress of pixel and strip ladder assemblies  Perform thermal cycle tests winter06/7 Mechanical design firm (HYTEC)  Weekly with VTX mech. Engineer + monthly meetings with VTX office VTX/PHENIX integration: slow control, monitoring, calibration, integration into DAQ  Develop/review operating plan with PHENIX managers, winter 06/07, winter 07/08 Ground loops  Develop/review grounding plan with all stakeholders, winter 06/07, winter 07/08

3 Oct Identified system risks (VI to X ) Pixel bump-bonding  Increase contingency in schedule by approx 50% Pixel bus performance  Test using prototype ladder pixel bus + SPIRO + FEM + stave April 07 RCC and ROC development  Apply more R&D $ in FY06 to design/prototype of RCC ASIC  Design/fabrication pre-production RCC, July 06 to winter 06/07 Decision to start item’s production  Formal review process before any item’s production VTX/FVTX integration  Cross-meeting attendance esp. by engineers, updates at quarterly

3 Oct Critical Path Explicit float 44 weeks (re-analysis => increase from 20 weeks at time of review)

3 Oct Quantitative+Risk Milestones (FY07) Milestone: pre-production ROC/RCC perform to specFY07 3Q Milestone: 123 strip sensor modules Q/A'd, sufficient for half-vtxFY07 3Q Milestone: spare strip sensor modules Q/A'dFY07 4Q Milestone: 60 pixel sensor modules performs to spec, sufficient for half vtxFY07 1Q Milestone: 1st prototype pixel ladder performs to electrical, thermal specFY07 3Q Milestone: spare pixel sensor modules performs to specFY07 3Q Milestone: 60 pixel buses + spares fabricatedFY07 4Q Milestone: 60 pixel spiro modules + spare performs to specFY07 4Q Milestone: Design completed for DCMsFY07 4Q Milestone : Completion of Mechanical SpecificationsFY07 1Q Milestone: sign mechanical contractFY07 1Q Milestone: prototype pixel staves deliveredFY07 2Q Milestone: prototype strip staves deliveredFY07 4Q

3 Oct Quantitative+Risk Milestones (FY08) Milestone - Pre-production strip ladder performs to specFY08 1Q Milestone: RCCs delivered and perform to specFY08 3Q Milestone: 123 ROCs performs to spec, sufficient ROCs for half-VTXFY08 3Q Milestone: spare ROC performs to specFY08 4Q Milestone: 30 pixel FEMs + spare performs to specFY08 1Q Milestone: Pixel trigger modules performs to specFY08 2Q Milestone: 60 pixel bus extenders + spares fabricatedFY08 3Q Milestone: 77 DCMs + spare completedFY08 3Q Milestone: grounding plan finalizedFY08 2Q Milestone: pixel/strip test ladders perform to spec when in realistic proximityFY08 2Q Milestone: VTX operations plan finalizedFY08 2Q Milestone: Environment Safety & compliance grantedFY08 3Q Milestone: electrical services completedFY08 4Q Milestone: 30 + spare pixel staves deliveredFY08 3Q

3 Oct Quantitative+Risk Milestones (FY09) Milestone: 30 pixel ladders assembled + spareFY09 1Q Milestone: 44 + spare FEMs + PM performs to specFY09 1Q Milestone: infrastructure ready for installationFY09 2Q Milestone: 22 strip ladders performs to spec, sufficient for half-VTXFY09 4Q Milestone: 44 strip ladders + spare performs to specFY09 4Q Milestone: 12 barrel mounts deliveredFY09 1Q Milestone: 44 + spare strip staves deliveredFY09 1Q Milestone: assembly fixtures deliveredFY09 2Q Milestone: cooling system deliveredFY09 3Q Milestone: dry gas system deliveredFY10 1Q Milestone: space frame deliveredFY10 1Q Milestone: mechanical isolation system mounts deliveredFY10 1Q Milestone - all ladders on VTXFY10 1Q Milestone: project completeFY10 2Q

3 Oct Project Completion Requirement VTX barrel assembled, ready to install in PHENIX IR. Infrastructure in the PHENIX IR is installed and ready to accept the VTX barrel.  cooling system, LV/HV power supplies, slow control systems, safety systems, cables, and data fibers. FEMs and DCMs for the VTX system are ready VTX satisfies the following functional requirements:  Average live area of the ladders within the PHENIX central arm acceptance is more than 90%  The fully assembled detector can be cooled down to 0 degree C.  Noise hit rate <0.1% of the pixels in the pixel detector after hot channels are masked.  Clear separation of measured MIP peak from pedestal for strip detector.  DCA resolution better than 100  m in r.m.s.

3 Oct Manpower Summary (need to check) WBSTask FY07 Total FY08 Total FY09 Total 1.1.1Strip FEE to 1.1.4Strip sensors, test, assembly Pixel DAQ + Electronic Systems Mechanical Structure Infrastructure+Assembly ladders onto barrel Management0.55 software Total DOE Total Project

3 Oct MoUs MoU’s being drafted between BNL and institutions  In place Fall 06

3 Oct Overall Cost (DOE) WBSNameTPC k$ FY07 1VTX project4, Strip1, DAQ Electronics System Integration Auxiliary Systems & Integration1, Management79 1.7Installation & preops67

3 Oct Breakdown of costs (FY07 k$) WBSName Material k$ Personnel k$ BNL transfer k$ Conting. % Conting. k$ TEC k$ Preops k$ TPC k$ 1VTX project 1,3901, ,406574, Strip , DAQ Electronics System Integration Auxiliary Systems & Integration , Management Installation

3 Oct At Year Dollars 2% material, 4% personnel WBSName TPC FY07 k$ FY07 AY k$ FY08 AY k$ FY09 AY k$ TPC AY k$ 1VTX project 4,4631,4642,0521,0854, Strip 1, , DAQ Electronics System Integration Auxiliary Systems & Integration 1, Management Installation

3 Oct Summary Re-analysis and mitigation of system risks Re-analysis of risk on+near critical path items  increase of schedule contingency Project complete  Ready for installation early 2010 TPC $4.6M AY