31 January 2002JLOTS Symposium1 Advanced Lighter Simulator Update 31 Jan 2002 Mike Christie NSWC Carderock Division, Code 282 (301) 227-5977.

Slides:



Advertisements
Similar presentations
CPS Graduation Tracking Automation Phase II Project Overview Academic Planner New Course Catalog Autograd Transcripts December 8, 2011.
Advertisements

NIMS Communications and Information Management IS-700.A – January 2009 Visual 4.1 NIMS Resource Management Unit 4.
Process and Procedure Documentation. Agenda Why document processes and procedures? What is process and procedure documentation? Who creates and uses this.
NIMS Resource Management IS-700.A – January 2009 Visual 5.1 NIMS Resource Management Unit 5.
Unit 14: CERT Basic Training Unit 9 Review CERT Basic Train-the-Trainer.
WECC Operating Committee Operations Training Subcommittee Report Bill Simmons, OTS Chair March 25, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Peter Carafano, M.Ed. Associate Professor, Science Department Florida State University Schools.
Budgetary Funding Fall Overview What is budgetary funding? How is budgetary funding different from actual funding? Budgetary Funding eligibility.
Session 21-2 Session 23 Direct Loan Tools Session 21-3 Direct Loan Tools Version 1.0 n Introductions n Questions n Evaluations.
Quality Assurance CS 615. Mission Statement The Quality Assurance team will provide assurance to stakeholders in CS-615/616 projects that their projects.
Hardware Specialised Devices
Templates ITS Update – Jan 2013 WGM. Templates ITS  Working with MDHT team to examine options  Received full extract from Lantana’s Trifolia to evaluate.
1 Earth System Modeling Framework ESMF Usability and Training
1 CADE Finance and HR Reports Administrative Staff Leadership Conference Presenter: Mary Jo Kuffner, Assistant Director Administration.
JLOTS Web Based Training Update
VistA Imaging: An Update on IHS Activity and Directions Mark Carroll, MD; Janis Sollenbarger.
CLAS12 CalCom Activity CLAS Collaboration Meeting, March 6 th 2014.
Damage Control Training and Testing
Archives and Records Centers information Systems (ARCIS) User Administration for Agency Customers 5/25/11.
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
ICAO Flight Plan 2012 Workshop ARE YOU READY? Durban 24 August 2012.
Independent Study. Visual LookVisual Look IntroductionIntroduction SRSSRS SDDSDD ImplementationImplementation TestsTests Conclusion and Future PlansConclusion.
Issue Manager Presented By: Shaun McAnulty. Goals for Understanding Issue Manager is the ticketing & tracking system for issues between PI Employees and.
Created by Bonnie Smith SimNet Registration and Overview Created for Fresno City College CIT 12 – Computer Literacy Students.
Student Records Degree Processing. About the Instructor Genice Milliner Student Enrollment Services (SES) Trainer 15 Years in Documentation and Training.
IHRIS: Open Source Health Workforce Information Systems Pilot Project Name Event Location - Date.
Logistics Workflow 1.Our tracking system 1.General status 2.Development status 2.Workflow Leonardo Grant – Logistics coordination.
HYPACK MAX Training Seminar Advanced Survey Topics Multivessel & Specialty Drivers Demonstrations of operating with more than one vessel & specialty.
Flex Day April 30, 2013 SLOAC Coordinator Training.
ELL Data Collection and Reporting Update
Open Source Learning Management Systems (OSLMS) Partnership Grant Meeting: October 19, 2010.
Ground Control Station Flight conTrol
Alert Message Formats for SAR Points of Contact (SPOCs) - Overview and Interpretation - Tom Griffin, USMCC Senior Systems Analyst U.N./USA Training Course.
RO/RO RAMP TO PLATFORM INTERFACE JLOTS & LOGISTICS FROM THE SEA R&D SYMPOSIUM January 2002 Jason Chang NAVSEA Carderock (301)
Web Advisory Committee Overview CMS Project Status Update CMS implementation team Organizational structure Pilot sites within scope Major.
Next Generation ISEA Roadmap
Rev Advanced User Training We’ll Start at 9:00AM Mike Horan Pictometry Trainer.
CANADIAN COAST GUARD AUXILIARY - PACIFIC ARTE CANADIAN COAST GUARD AUXILIARY - PACIFIC Nov 2010.
Inventory Flowcharts Page 6 By: Bereket Gebreselassie Vance Cable.
Chubb Hong Kong Ltd. – Fire Safety Division
Dallas Fire-Rescue Communications Division Dispatch Operations September 14, 2015.
STATUS UPDATE FOR CPRA January 26,  Study combines Cong. Boustany Recon with LCA Chenier Plain Effort  Cost Share Agreement signed in Jan
Michigan DOT’s - URTS Internal web based application
World War II Flight Simulators Jordan Bradfield TE 2520.
Re-thinking Resource Sharing Dare to Share Gail Wanner (SirsiDynix) & Clare MacKeigan (Relais International) October 12, 2006.
CSE Senior Design I Superior Designs, Inc. Fall 2010 Approved Projects (for delivery May 2011) Instructor: Mike O’Dell.
Personal Training Assistant – Sprint#1 Group Gamma.
Thales Training & Simulation Rekka-simulaattori koulutukseen – Tuotteen esittely.
Environmental Management Division 1 NASA EMS Building Blocks to Success Michael DeWit, QEP EMS Lead ICF Consulting Inc. Fairfax, VA Michael J. Green, PE.
NPI-NILU tasks •Further development of fast simulation tool for UV radiation (Fastrt) •Applications of fast simulation tool for quality assurance of UV.
Student Financial Assistance. Session 17-2 Session 17 Direct Loan Tools More Uses Than Duct Tape.
Copyright © 2004 VMware, Inc. All rights reserved. Utility Portal Overview.
T EST T OOLS U NIT VI This unit contains the overview of the test tools. Also prerequisites for applying these tools, tools selection and implementation.
MSFC Payload Training bs/kh/ExpPldsTST#1/ 3/18/2016 Page 1 Astroculture-8 (ADVASC) TST #1 April 27, 1998 DTM/Beth Skidmore NASA/MSFC Training Branch Voice.
Lightning Updates Several tasks underway o Continue to develop training o Coordinate data transition to 2010 Spring Program o Transition data to newest.
IT Curriculum Update IPT Weekly Meeting 8 January 2015.
Multi-Purpose Reconfigurable Training System (MRTS) Overview
Microsoft Project 2007 What you have said.
ريكاوري (بازگشت به حالت اوليه)
Pennant International Group plc
MS Access: Creating & Using Forms
Subclipse CSCI 3130 Summer 2016.
Risk Adjustment User Group
Signal Conditioning.
WG Assessment Liat-Noa-Ronen
Updating Databases With Open SQL
Modified at -
Agenda Primo Payday / NAV Payroll Value Proposition Feature Overview
Process and Procedure Documentation
Updating Databases With Open SQL
Presentation transcript:

31 January 2002JLOTS Symposium1 Advanced Lighter Simulator Update 31 Jan 2002 Mike Christie NSWC Carderock Division, Code 282 (301)

31 January 2002JLOTS Symposium2 Advanced Lighter Simulator Project objectives System overview Status

31 January 2002JLOTS Symposium3 Advanced Lighter Simulator Objectives 1.Provide a realistic simulation of causeway-based lighterage in a sea state 3 environment 2.Evaluate the effectiveness of new or modified lighterage technology 3.Evaluate simulation technology day/year training for Coxswains and Pilots

31 January 2002JLOTS Symposium4 Advanced Lighter Simulator System Overview Instructor’s Operating Station ( I O S ) Coxswains Station Pilots Station

31 January 2002JLOTS Symposium5

31 January 2002JLOTS Symposium6

31 January 2002JLOTS Symposium7 Coxswain View via head-mounted display

31 January 2002JLOTS Symposium8 Pilot Station PILOT MOVEMENT CONTROL JOYSTICK

31 January 2002JLOTS Symposium9

31 January 2002JLOTS Symposium10 Advanced Lighter Simulator Status 1.Installed at LittleCreek, VA 2.Pilot signal tracking issues resolved 3.System checkout underway 4.PHIBCBTWO training program under development with assistance of EWTGPAC 5.Training the trainers 6.Updating documentation 7.Technology study underway