CMS Phase 2 Upgrade: Scope and R&D goals CMS Phase 2 Upgrade: Scope and R&D goals October 21, 2014 Jeremiah Mans On behalf of the CMS Collaboration.

Slides:



Advertisements
Similar presentations
Track Trigger Designs for Phase II Ulrich Heintz (Brown University) for U.H., M. Narain (Brown U) M. Johnson, R. Lipton (Fermilab) E. Hazen, S.X. Wu, (Boston.
Advertisements

Use of G EANT 4 in CMS AIHENP’99 Crete, April 1999 Véronique Lefébure CERN EP/CMC.
Recent news about SiPM based applications R&D in DESY Nicola D’Ascenzo University of Hamburg - DESY.
The CMS Detector Paoti Chang National Taiwan University
Roger Rusack – The University of Minnesota
1 News and Miscellaneous UPO May Didier Contardo, Jeff Spalding -Phase 2 Scope and Cost exercise.
O. Buchmueller, Imperial College, W. Smith, U. Wisconsin, UPO Meeting, July 6, 2012 Trigger Performance and Strategy Working Group Trigger Performance.
The Silicon Track Trigger (STT) at DØ Beauty 2005 in Assisi, June 2005 Sascha Caron for the DØ collaboration Tag beauty fast …
Upgrading the CMS simulation and reconstruction David J Lange LLNL April CHEP 2015D. Lange.
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
The sPHENIX Barrel Upgrade: Jet Physics and Beyond John Haggerty Brookhaven National Laboratory on behalf of the PHENIX collaboration Quark Matter 2012.
US CMS Phase 2 R&D Discussion 30-July-2013 “Phase 2 muon R&D” J. Hauser, UCLA  Add redundancy (power) to trigger where most needed  First and innermost.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
The SLHC and the Challenges of the CMS Upgrade William Ferguson First year seminar March 2 nd
The forward detectors of CMS Experiment at LHC Bolek Wyslouch MIT
The CMS Upgrade Program ECFA High Luminosity LHC Experiments Workshop Aix-les-Bains, October 1, 2013 J. Spalding, on behalf of the CMS Collaboration 1.
Hadron Calorimeter Readout Electronics Calibration, Hadron Calorimeter Scintillator Upgrade, and Missing Transverse Momentum Resolution due to Pileup Zishuo.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Roger Rusack – The University of Minnesota 1.
SiD Concept – R&D Needs Andy White U. Texas at Arlington SiD Concept Meeting LCWS06 Bangalore, India March 11, 2006.
A Silicon vertex tracker prototype for CBM Material for the FP6 Design application.
C. F. Bedoya. C. F. Bedoya May 13th, * The goal was to establish a baseline plan for DT in Phase 2, (although some aspects of phase 1 also needed.
The CMS detector as compared to ATLAS CMS Detector Description –Inner detector and comparison with ATLAS –EM detector and comparison with ATLAS –Calorimetric.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
PHASE-1B ACTIVITIES L. Demaria – INFN Torino. Introduction  The inner layer of the Phase 1 Pixel detector is exposed to very high level of irradiation.
25-Oct-2013 Upgrades Week “Muon plans for the Phase 2 TP” J. Hauser, UCLA  Phase 2 muon plans (presented at ECFA),  What’s new since Upgrade Week  New.
CLICdp achievements in 2014 and goals for 2015 Lucie Linssen, CERN on behalf of the CLICdp collaboration CLIC workshop, January 30 th
Guido Haefeli CHIPP Workshop on Detector R&D Geneva, June 2008 R&D at LPHE/EPFL: SiPM and DAQ electronics.
Overview of the High-Level Trigger Electron and Photon Selection for the ATLAS Experiment at the LHC Ricardo Gonçalo, Royal Holloway University of London.
Peter Sharp CERN CMS Tracker Summary of the Tracking Trigger Working Group Peter Sharp 21 November 2008.
First CMS Results with LHC Beam
CERN-Korea Committee 1 CMS report. CMS publications 2 Pub rate steady, ~2.5/week 391 papers submitted: +23 CRAFT based +25 ready for CWR or later +6 PubDraft.
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.
Ideas for Super LHC tracking upgrades 3/11/04 Marc Weber We have been thinking and meeting to discuss SLHC tracking R&D for a while… Agenda  Introduction:
Calorimeters Design Issues and Simulation Needs C.Woody Physics Department Brookhaven National Lab EIC Simulation Workshop Oct 9, 2012.
+ GE2/1 Case Considerations Alexei Safonov. + CMS Muon Upgrades CMS Technical Proposal in its part related to muon systems lists following: MEX/1 electronics.
1 Towards Phase 2 TP releases 2013 Didier Contardo, Jeff Spalding Status of current simulations studies and ongoing issues Needs for TP preparation.
July 27, 2002CMS Heavy Ions Bolek Wyslouch1 Heavy Ion Physics with the CMS Experiment at the Large Hadron Collider Bolek Wyslouch MIT for the CMS Collaboration.
1 Plannar Active Absorber Calorimeter Adam Para, Niki Saoulidou, Hans Wenzel, Shin-Shan Yu Fermialb Tianchi Zhao University of Washington ACFA Meeting.
SARAH MARIE BRUNO HGCAL OVERVIEW Endcap More sensitive to radiation Crystals degrade quickly and must be replaced – expensive!
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
CMS PHASE-2 TRIGGER UPGRADE PLANS AND R&D Darin Acosta University of Florida 6 October 2015 CMS Phase-2 Trigger -- CPAD Workshop -- D. Acosta 1.
An Overview of the FPIX Detector Upgrade – CMS Experiment
Roger Rusack – The University of Minnesota Upgrades to the CMS detector.
High-Luminosity upgrade of the LHC Physics and Technology Challenges for the Accelerator and the Experiments Burkhard Schmidt, CERN.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
Technology and R&D Summary and next steps Burkhard Schmidt.
1 CMS Upgrades LHC France 06/04/2013 D. Contardo IPN Lyon CNRS/IN2P3 o Overall upgrade plans and schedules o CMS projects during LS1 o Upgrades for LIU.
A. Parenti 1 RT 2007, Batavia IL The CMS Muon System and its Performance in the Cosmic Challenge RT2007 conference, Batavia IL, USA May 03, 2007 Andrea.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Operation, performance and upgrade of the CMS Resistive Plate Chamber system at LHC Marcello Abbrescia Physics Department - University of Bari & INFN,
Scope R&D Participants/Infrastructure
The Electromagnetic Calorimetry of the PANDA Detector at FAIR
Technical Design for the Mu3e Detector
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
Felix Sefkow DESY LDC at Vienna November 17, 2005
CMS plans for Endcap Calorimetry at HL-LHC
SiD Calorimeter R&D Collaboration
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
The Upgrade of CMS for High Lumi LHC
for the transition region on behalf of the RPC upgrade group
The Compact Muon Solenoid Detector
Anna Colaleo - INFN-Bari On behalf of the CMS Muon group
The Silicon Track Trigger (STT) at DØ
ILC Detector Technology
Project Presentations August 5th, 2004
Motives and design of future CMS tracker
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
The LHCb Front-end Electronics System Status and Future Development
Presentation transcript:

CMS Phase 2 Upgrade: Scope and R&D goals CMS Phase 2 Upgrade: Scope and R&D goals October 21, 2014 Jeremiah Mans On behalf of the CMS Collaboration

October 21, 2014 CMS Upgrade Overview 2 The LHC has allowed us to glimpse the outlines of some remarkable physics, but we don’t see the detail clearly… The HL-LHC is a much brighter light to shine on the situation…

The HL-LHC is a very bright lamp to see physics details, which makes it a challenging environment for detectors and reconstruction Radiation – Ionizing dose – Neutron fluences up to 2 x n/cm 2 in pixels Pileup – 140 average simultaneous interactions (many events with > 180) October 21, 2014 CMS Upgrade Overview 3 Simulated Event Display at 140 PU (102 Vertices)

CMS has a comprehensive plan for adjusting detector, where necessary, to cope with these challenges. New Tracker Radiation tolerant - high granularity - less material Tracks in hardware trigger (L1) Coverage up to η ∼ 4 Muons Replace DT FE electronics Complete RPC coverage in forward region (new GEM/RPC technology) Investigate Muon-tagging up to η ∼ 3 New Endcap Calorimeters Radiation tolerant High granularity Barrel ECAL Replace FE electronics Cool detector/APDs Trigger/DAQ L1 (hardware) with tracks and rate up ∼ 750 kHz L1 Latency 12.5 µs HLT output rate 7.5 kHz October 21, 2014 CMS Upgrade Overview 4 Other R&D Fast-timing for in-time pileup suppression Pixel trigger

Tracker replacement is necessary due to efficiency loss and fake rate increase Blue tracker modules are inactive after 1000 fb -1 due to very high leakage currents induced by neutron fluence. October 21, 2014 CMS Upgrade Overview 5

Detailed conceptual design for all-silicon tracker with three section and trigger-stub capability Strip/Strip Modules 90 µm pitch/5 cm length Strip/Pixel Modules 100 µm pitch/2.5 cm length 100 µm x 1.5 mm “macropixels” Inner Pixel Covers up to η=4.0 October 21, 2014 CMS Upgrade Overview 6

Tracker design provides excellent efficiency and resolution up to |η|≈4 with low fake rate Outer Tracker substantially lighter! October 21, 2014 CMS Upgrade Overview 7 Pixel used in simulation results to date is identical to the Phase 1 Pixel detector with additional forward disks. Further optimization of pixel parameters for b-tagging and forward track parameter resolution is planned Pixel used in simulation results to date is identical to the Phase 1 Pixel detector with additional forward disks. Further optimization of pixel parameters for b-tagging and forward track parameter resolution is planned

Tracker Enabling Technologies: existing and needed Sensors – n-in-p sensors appear to have sufficient neutron tolerance for HL-LHC – 3d or other advanced technology possible for inner layer ASICs – Pixel chip is particularly challenging : RD53 Modules – Flex-hybrids for linking two sensors Readout and data links – Outer tracker has strong requirements for high-speed, low-mass, low-power data link for trigger stubs Power and cooling – CO 2 cooling planned for full system – Power level is a challenge in the PS modules: higher power DC/DC or serial powering? October 21, 2014 CMS Upgrade Overview 8

Excellent tracking performance is possible at L1 using the stub input, but implemention requires further R&D. Algorithms validated in digitized simulation Two hardware implementations under study – Associative memory (use case for 3d IC technology) – Tracklets in commercial FPGAs Requires a trigger latency of ≈10 μs compared with current limit of 3/6 μs in tracker/ECAL electronics 1 mm z 0 resolution October 21, 2014 CMS Upgrade Overview 9

Barrel electromagnetic calorimeter upgrades to electronics required for trigger latency will bring other benefits as well New on-detector electronics needed to meet requirements for track trigger latency Replacement allows trigger- level readout of each crystal and new shaping to reduce impact of out-of-time pileup and increasing APD noise October 21, 2014 CMS Upgrade Overview 10

Replacement of the endcap calorimeters is required due to radiation-induced signal loss Very significant signal degradation at high η – Particularly important region for VBF Higgs and VBS measurements Two concepts under study for endcap calorimetry in Phase 2 October 21, 2014 CMS Upgrade Overview 11

Concept 1: LYSO Shashlik + Scintillator HE EM Calorimeter – Compact Pb/LYSO Shashlik using WLS based on quartz capillaries and readout using GaInP “SiPMs” Hadron Calorimeter – Scintillator-based hadron calorimeter with 30% of volume replaced by “finger tiles” and 10% by a solution with higher radiation tolerance October 21, 2014 CMS Upgrade Overview 12

Concept 2: Silicon Calorimeter + Scintillator backing calorimeter Silicon-lead/copper EM (25 X 0, 1λ)and silicon/brass front hadron (3.5 λ) calorimeter – 8.7 M channels, pad sizes 0.9 cm 2 or 0.45 cm 2 depending on η Scintillator-brass backing calorimeter (5.5 λ, low radiation zone) October 21, 2014 CMS Upgrade Overview 13

Key Technologies for Calorimetry Radiation-tolerant, fast scintillators – LYSO, CeF 3 effective for EM calorimetry – Several solutions for hadron calorimetry under study: crystal fibers, liquid scintillator, green/orange scintillator systems, quartz*+WLS Radiation-tolerant photodetectors (Shashlik) High-radiation-tolerance, large-area, economical silicon sensors (HGCAL) Low-power high-channel-count radiation-tolerant readout (HGCAL) High-speed data links (all) – Desire for low power in HGCAL concept October 21, 2014 CMS Upgrade Overview 14

Muon upgrades extend coverage at high rapidity and meet the trigger rate and latency requirements of the track trigger. Improvements of existing detectors – Electronics: DT minicrates, CSC inner MEx/1 readout Both are needed for compliance with trigger upgrade Forward 1.6<|η|<2.4 upgrades – L1 trigger rate reduction, enhance redundancy – GEMs: GE1/1 and GE2/1 – iRPCs: RE3/1 and RE4/1 Operation in higher rate Technology to be selected Very forward extension – Extend muon tagging – ME0 with GEMs – 6 layer stub – Baseline 2.0<|η|<3.0 Depends on calorimetry October 21, 2014 CMS Upgrade Overview 15

The next two years are important ones for technology R&D leading up to the technical design reports for major subsystems CMS HL-LHC Technical Proposal is being completed now with full-simulation physics studies – Decision on endcap calorimeter technology planned for early 2015 CMS will complete Technical Design Reports on the key upgrades in 2016/17 – Next two years are very important for final R&D leading up to the TDRs October 21, 2014 CMS Upgrade Overview 16

Conclusion CMS upgrades for the HL-LHC era are driven by achieving the physics promise of the large HL-LHC data set while surviving the challenging HL-LHC environment – Very high radiation doses and pileup values CMS has a coherent plan for meeting these challenges with a set of upgrades to many of major detector elements of CMS CMS is actively interested in opportunities to collaborate on R&D to finalize these designs in preparation for TDRs and construction October 21, 2014 CMS Upgrade Overview 17

October 21, 2014 CMS Upgrade Overview 18