Handy Store Fixtures Gondola Dolly Assembly Instructions

Slides:



Advertisements
Similar presentations
Levolors New Size-In-Store Blind Cutting Machine.
Advertisements

Sectional Assembly and Installation
How to Build a Wagon by Michael White One day you are at the store, and you see a nice wagon on the shelf. You just had to have it. So you buy the.
1 Introduction to Engineering Lab 2 – 1 Assembling the Conveyor/Sorter Agenda Goal of todays lab. Storing your teams conveyor/sorter. Tool kits. Safety.
Michael Long– Eagle Project - Exhibit D-1 Plans/Drawings – Top View
Motor Propeller wrench Screw Nut (2) Cylinder top Tiny screw IGNORE:
Stable Rise – Fixed Bracket / Stationary Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Using three IR sensors, SensingBot can sense the front obstacles so it can avoid them. Sensing.
Expand Media Wall & Podium Case Training Video’s & Instructions.
Adjustable Head Strap Instructions Step 1: To adjust the head strap hold goggle as above.
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Click on this image to open the full PDF document.
Laser Enclosure to Elevated Rail Assembly Wyman Gordon Forging Locator Original Revision: 2/14/2013.
Rev. A Control Number XXXXXXXXXXX Effective Date 10/2/2008 Field Work Instructions for Placard replacement Functional Trainer Page 1/4 Revised Date 10/2/2008.
Trinity Highway Products Properly Installed SRT Post HBA System-Slotted Rail Terminal
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
1 ASSEMBLY NOTES 1.Specifications Build according to IPC 6012 class 2 Standards 2.THIS DEVICE IS SUSEPTABLE TO DAMAGE BY ESD – Use appropriate ESD precautions.
Digital StarLab Set-Up, Operation, Maintenance, and Teacher Manual for the Digital StarLab are in the links below or on the training tab in the BlackBoard.
Typical Walk-in Closet with elfa® décor
Cooling Business Group 1 INSTALLATION Directions.
Stable Rise –Pull and Swivel Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Jacto Incorporated, 9650 SW Herman Road, Tualatin, Oregon (800)
Removal of Radiance Neph Disable the humidifier power remove water reservoir at top of neph disconnect power, computer and sensor cables disconnect and.
The Jasmine Gothic Victorian Cottage Assembly Instruction
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
Hoop Tech Clamp Assembly and Attachment. Contents of package.
L.C. Technology ROBOT ASSEMBLY. Base Assembly BASE File off raised tabs on each side of Servo. Place Servo in vice between Fibre Clamps. Raised Tabs Repeat.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Polaris 6x6 UTV Instructions for Fuel Tank Vent Tube Modification 2005 – 2009 models For further information contact: Michelle Ryerson or Carl Dorsey,
The Ariel Assembly Instruction By Laser Dollhouse Designs.
Showing Demonstrations on the TV How to connect the camera to our TV set.
LAUNCHER BASE PARTS B A D E F C G. LAUNCHER BASE PARTS B A D E F C G.
Jacto Incorporated, 9650 SW Herman Road, Tualatin, Oregon (800)
Mission to Mars 4 Wheel Rover Build Instructions April 2008.
Plans for the 2015 Invention Challenge Target Paul MacNeal August 9,
Product features. Obsolescence What does quality mean?
2000 Chevy S-10 Left Suicide Door Install Instructions 1.Remove seat (4 anchor bolts.) 2.Remove tracks from seat. To access the nut shown in pic 1, pry.
Spare Parts List (not to scale)
Installing a single Dreamscreen Set unit in place and attach with 2 ½ “ screw. Do not tighten the screw yet, tighten just enough to keep from falling.
Ken Periman Problem solving, Sub frame bolt issue
How to Change Raptor Knife Blades. Step 1: Use a Phillips screwdriver to remove the 5 screws. It is not necessary to remove the lanyard/webbing to change.
How to move your horn.. 1.This one is a shot of the horn with the acorn nut removed. STEP 1.
Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox LEAD SPLICE SPECIFICATION  BY: ROY HANNAFORD.
Triangle Fixture Insert each pole into fixture-hole Poles for BG400S Poles for BG700S Air intake hose.
Mission to Mars 4 Wheel Rover Build Instructions April 2008.
AVIVA™ ELECTRIC BIKES VIPER ASSEMBLY INSTRUCTIONS Aviva™ - For A New Way Of Life.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
1 Equilibrium The Balancing Robot By: Kerry Scharfglass Whiz Kid.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
Completed Front and Rear Standard 10 ½” 1 ½” 3 ¼” 4 ½” 1” ¾” 1 ½” 6” ¾” Channel Length: 5 ¼”, ¾” from end.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
VIEW SERIES with Sliding Door
What is TETRIX? If you can dream up a robot design, you can build it with the TETRIX Robotics Design System.
STEP 1: ASSEMBLE ANGLE PLATES
Easycliner (Motorized Version) Assembly Instruction
STEP 1: ASSEMBLE ANGLE PLATES
Ken Periman Problem solving, Sub frame bolt issue
Activity 2.2.1a Action Reaction Construction Guide
Assembly instructions for M-K all bolt together hoppercone kit.
Mounting a BalanceBox®650 to a brick wall
Drawing of stud.
Activity 4.2.8d Satellite Flight Path Construction Guide
WASP Science CCD Assembly Fixture No Guiders
Valve stem “gag” mechanism
QUADCOPTER PRODUCTION PLAN
Replace Timing Belt 300 Hours.
QUADCOPTER PRODUCTION PLAN
Omega Selection Center
Lab07 Slowing neutrons down
Repair Guide SYM XT Series.
Presentation transcript:

Handy Store Fixtures Gondola Dolly Assembly Instructions

Materials Parts List: Gondola Dolly Frame Gondola Uprights End Shoe Center Shoe Back Panel Stop Cap Spacers Front Toe Back Panel Top Cap Base Shelf Levelers Castors with Nuts & Bolts

Assembly Instructions A) Remove Levelers (#11) that are inserted into End Shoe (#3) and Center Shoes (#4).

Assembly Instructions B) Screw 4 Castors (#12) into Gondola Dolly Frame (#1).

Assembly Instructions C) Attach Shoes to Gondola Dolly Frame (#1). Bolt down to the Frame, bolts go down thru End Shoe into Frame (#1). Use nut to tighten. (See Figure 1)

Assembly Instructions D) Insert Back Panel Stop Cap (#5).

Assembly Instructions E) Insert Spacers (#6).

Assembly Instructions F) From above, slide Front Toes (#7) into End & Center Shoe (#3) & (#4).

Assembly Instructions G) Slide Back Panel (#8) from top into one Upright (#2), then bend and slide into the other Upright (#2). *NOTE: If ¼” Back Panel is more than one piece, place Plastic Divider Bar (not shown) between Back Panels (#8).

Assembly Instructions H) Screw Top Cap (#9) into Uprights (#2). (Screws shipped in Uprights.)

Assembly Instructions I) Hook in Base Shelf (#10) properly.

Assembly Instructions J) Shelves will hook into Uprights (#2) as shown.