1 James N. Bellinger 4-Feb-2009 ME+1 status and Endcap Z James N. Bellinger University of Wisconsin at Madison 4-Feb-2009.

Slides:



Advertisements
Similar presentations
R. Lee CMS EMU Alignment: 28 Feb, COCOA Simulation and Study of the EMU Alignment System Robert Lee CMS Endcap Alignment Muon EDR 28 February 2002.
Advertisements

Skeleton: Hardware Alignment for EMU meeting James N Bellinger 15-Mar-2009.
A Charged, Thin Sheet of Insulating Material
Kaori Maeshima (FNAL), Muon Alignment EDR: FEB. 28, Endcap Alignment EMU Alignment DAQ Muon Alignment EDR Feb. 28, 2002 Outline: 1.Components to.
US CMS DOE/NSF Review: May 8-10, Endcap Alignment Dick Loveless DOE/NSF Review 9 May 2001.
Muon Endcap Alignment Software & Calibration February 2006 Muon Endcap Alignment Software & Calibration February 2006 Samir Guragain, Marcus Hohlmann Florida.
MUON_EDR-06 (Alignment) Enrique Calvo Alamillo February 28-March 1, 2002 Link Mechanics: Status.
GE alignment- status, proposal N. Béni, Z.Szillási (ATOMKI, Debrecen, HU) G. Bencze, G. Endrőczi (Wigner RCP, Budapest, HU) GMM meeting 1.
Analog Alignment Sensors Status report – April 2004 Marcus Hohlmann Florida Tech.
Muon Endcap Alignment Analog Sensor Calibrations & Software Update Samir Guragain, Marcus Hohlmann Florida Tech October 2005 USCMS EMU meeting – Fermilab,
Drilling a Double Cosine-Theta Coil Hunter Blanton, Spencer L. Kirn, Christopher Crawford University of Kentucky Abstract: A double cosine theta coil is.
Goal : Setup and monitor “chambers” with resolution of < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line 1 Transfer Line 1 Transfer Plate.
Goal : Setup and monitor “chambers” with resolution of  < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line (2 Laser Redundancy) 1 Transfer.
First Reconstruction Results on the Alignment of Muon Endcap Chambers in the CMS Experiment at CERN S. Guragain, G. Baksay, M. Hohlmann Florida Tech 74.
Partial Disassembly of the alignment devices on each ME11transfer plate, ME1/1 chamber and ME1/2 chamber. (6 on +Z and 6 on –Z side of the CMS)
Hand Crosscheck HSLM1. Position of REF DCOPS CENTER MAB Target DM distance DMdowel to DCOPS dowel DCOPS dowel to center.
Alignment Software from the ME perspective Marcus Hohlmann Florida Tech Muon Alignment meeting during CMS week - CERN, March 15, 2005.
1 James N. Bellinger University of Wisconsin-Madison 27-November-2009 Status of Transfer Line Reconstruction James N. Bellinger 27-November-2009.
Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, Endcap Alignment Status of Offline Software Alignment CERN 17, 18 May 2001.
November 11 SESAPS 2006 Samir Guragain 1 Calibration, Installation & Commissioning of Sensors for the Alignment of Muon Endcap Chambers in the CMS Experiment.
Chamber Alignment Pins Δy = y PG – y nom. vs. Δx = x PG – x nom. M. Hohlmann 1, G. Baksay 1, S. Guragain 1, J. Bellinger 2, D. Carlsmith 2, F. Feyzi 2,
Alignment Meeting, CERN, Sept 19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field.
1 James N. Bellinger University of Wisconsin-Madison 2-February-2011 Status and Plans for Endcap Hardware Alignment James N. Bellinger 2-February-2011.
CHEP’06 COCOA 1 Cms Object-Oriented Code for Optical Alignment Pedro Arce (CIEMAT), Michael Case (U. California Davis) CHEP 2006, Mumbai, 13-17th February.
Simulation of the CMS Endcap Alignment Scheme Using COCOA.
1 James N. Bellinger University of Wisconsin-Madison 13 February 2008 Cocoa Plans.
1 James N. Bellinger University of Wisconsin-Madison 13-August-2010 Endcap Processing Notes James N. Bellinger 13-Aug-2010.
EMU Meeting, CERN, Sept 18-19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field up.
1 James N. Bellinger University of Wisconsin-Madison 25-February-2011 Z-sensor News James N. Bellinger 25-February-2011 Good news this time!
1 MC B1 Inspection MTM data: FIDUCIALS.IGS DATA.IGS 9/26/06 Pro/E model: b1_mtm_data_check.asm.
1 James N. Bellinger University of Wisconsin-Madison 15-March-2009 Hardware Alignment.
1 James N. Bellinger Robert Handler University of Wisconsin-Madison 11-Monday-2009 Laser fan non-linearity James N. Bellinger 20-March-2009.
1 James N. Bellinger University of Wisconsin-Madison 19-Feb-2010 Status of Transfer Line Reconstruction James N. Bellinger 19-February-2010.
James Bellinger, December CMS Week Muon Alignment James N. Bellinger University of Wisconsin at Madison 5-December-2006 DCOPS Data from MTCC2.
University of Wisconsin at Madison
University of Wisconsin at Madison
YE2 – YE3 distance Manual measurements
Geometry Creating Line Equations Part 1
EMU Alignment DAQ Endcap Alignment Muon Alignment EDR Feb. 28, 2002
University of Wisconsin-Madison
Status of Transfer Line Reconstruction University of Wisconsin-Madison
Status and Plans for Endcap Hardware Alignment
Transfer Line and CSC Rφ Reconstruction
Plus Endcap Transfer Lines
Status of Transfer Line Reconstruction University of Wisconsin-Madison
DCOPS Readout before and during MTCC
DCOPS Monitoring of Iron Bending
James N. Bellinger 1-November-2007
University of Wisconsin-Madison
Validating Transfer Line Fit University of Wisconsin-Madison
Starting from the Basics
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
Comparing Laser Fit to Barrel Fit University of Wisconsin-Madison
University of Wisconsin-Madison
Status of Transfer Line Reconstruction University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
CMS Week Muon Alignment
Transfer Line Calculations
University of Wisconsin at Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
Magnetic measurements at ambient temperature on the MQXFBP1
Presentation transcript:

1 James N. Bellinger 4-Feb-2009 ME+1 status and Endcap Z James N. Bellinger University of Wisconsin at Madison 4-Feb-2009

2 James N. Bellinger 4-Feb-2009 Endcap Z Measurements Do we believe IR Z-sensor results? 1.MAB sensor position 2.Offsets to IR target 3.IR sensor data 4.Compare with expected

3 James N. Bellinger 4-Feb-2009 MAB Sensor Position Relying on Celso’s fits for the two sensor centers Extrapolate slightly to IR sensor radius— effect is small

4 James N. Bellinger 4-Feb-2009 Offsets to Target Calibrated numbers for distance from PG4 to base of sensor: taken from Link SDF file Thickness of skin: varies from 3.04 to 3.14mm: I use 3.14 Thickness of target: ignored

5 James N. Bellinger 4-Feb-2009 IR sensor Position Field Off to On changes look similar, if include dips.6.3

6 James N. Bellinger 4-Feb-2009 Comparing w/ Ideal Transfer Plate NameNomIdeal0T3.8TIdeal-Nom0T-Nom Y3.8T-Nom distancemeter_p distancemeter_p distancemeter_p distancemeter_p distancemeter_p distancemeter_p

7 James N. Bellinger 4-Feb-2009 Using PG-corrected Transfer Plate NameZPGHand 0TFit 0T Hand 3.8T Fit 3.8T Fit0- ZP G Fit3.8- ZPG Fit0- Han d0 Fit3.8- Hand3. 8 dm_p dm_p dm_p dm_p dm_p dm_p

8 James N. Bellinger 4-Feb-2009 Using PostCraft Tilt/Shift NameZPG Hand 0T Fit 0T Hand 3.8 T Fit 3.8TFit0-PG Fit3.8- PG Fit0-Hand0 Fit3.8- Hand3. 8 dm_p dm_p dm_p dm_p dm_p dm_p

9 James N. Bellinger 4-Feb-2009 Conclusions wrt Endcap Z None at the moment. Not sure if Distancemeter at Pt6 is reading correctly Not sure why the others shift so much when trying to take disk tilt into account

10 James N. Bellinger 4-Feb-2009 Z positions w/o Cocoa Illustrate w/o Cocoa Know MAB 2D sensor position Know distance to distancemeter Know ME1/2 2D sensor position Using chamber geometry, predict ME1/3 positions

11 James N. Bellinger 4-Feb-2009 ME+1 Z positions: HSLM1 Field on Position of Reference DCOPS Center MAB To target, calibrated+skin thickness Distancemeter distance DM dowel to DCOPS dowel, CAD DCOPS dowel to DCOPS center, CAD Expected CMS z

12 James N. Bellinger 4-Feb-2009 Z Position of ME12 DCOPS center Contributions Celso ASPD Z of chamber at PG4 3.92effect of chamber tilt 135.8offset PG4 to surface of chamber offset DCOPS dowel to surface offset DCOPS center to dowel Expected CMS Z

13 James N. Bellinger 4-Feb-2009 U/D data wrt Center Reference _3_03 outer _3_03 inner _2_02 reference (upside down)

14 James N. Bellinger 4-Feb-2009 Predicting Z at 1_3_03 Slope of laser line = Intercept = _03 outer _03 inner Offset to surface85.44 Surface Z at 3_03 outer Surface Z at 3_03 inner mm change??

15 James N. Bellinger 4-Feb-2009 Comparing w/ PG coded target at center of 3_ PostCraft Z center of YE PG est for average (center) My est for outer My est for inner Outer is close to reference Suggests that outer Z is good, inner Z needs work Est changes to for PG if I include tilts