AB-PO-PH 2005 Pulsed and High voltage converters Responsibilities: PS complex exploitation, active maintenance (documentation, improvement, spare), follow-up.

Slides:



Advertisements
Similar presentations
Towards a Portuguese participation in the ESS project, 29 th Jan. 2010, Lisbon Carlos Martins – IST / CIEEE1 Carlos A. Martins Instituto Superior Técnico.
Advertisements

Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
STAND TEST 3MeV AB-PO-PH mars 2007Jean-Pierre ROYER POWER CONVERTERS AB-PO-PH ( Pulsed and High voltage converters) WHERE ARE WE ?
Summary of the Design Report and Next Steps Edda Gschwendtner for the CERN AWAKE Project Team Edda Gschwendtner, CERN1.
WG on possible controls restructuring 1 Controls activities of the AB equipment groups A. Butterworth E. Carlier, R. Losito, A. Masi, JJ. Gras, Q. King.
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Development of Solid State Long Pulse Klystron Modulators
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
CERN 29 Jan 2008 Power Converters for Linac 4 - Carlos A. Martins1 Power Converters for Linac 4 2 Hz) Carlos A. MARTINS Accelerators and Beams (AB)
Status of the Transfer of CRYRING to FAIR MSL, 2 February 2009 Håkan Danared.
Power converters implications for Booster Energy Upgrade Jean-Paul Burnet, Serge Pittet LIU day, TEEPC.
Impact on Project Planning and Cost. Agenda CERN Project Budget Planning Summary E. Gschwendtner, 9 April
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)
LIU-IONS Linac3 meeting LIU Project – Planning and Installation Julie Coupard EN/MEF-OSS.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Training, Prior Reviews, Configuration Management Action Item Tracking.
Christophe Mugnier, on behalf AB/PO Group ATC-ABOC days, 23 January 2008 AB/PO equipment review and Stand-by service description for the power converter.
Major power converter issues for the restart of PS & SPS machines and their experimental areas in 2006 Jean-Paul BURNET for AB/PO PS&SPS days January.
Electrical Discharge Circuit for CNGS Horn & Reflector PH/DT1 Group Meeting, 23 October 2007 Gilles MAIRE PH/DT1-IC Section Leader.
Davide Tommasini Status and prospects of the PS magnet consolidation program ATOP Days March 4 th – 6 th 2009 Status and prospects of PS magnets programs.
 Overview of the run 2009 for CV  Major improvements in Water treatment - Demineralised water production - Cooling control  Major concerns for.
TE-EPC Activities during LS2 V. Montabonnet on behalf of TE-EPC group.
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
Jean-Paul BURNET, AB/PO ATC-ABOC days, 22 January 2007 PS Main Power System: What has been done from June 2006? What will be the situation in 2007? PS.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
1 1.Summary of H- source review 2.Options for connection to the PS Booster 1.Summary of H- source review 2.Options for connection to the PS Booster.
ATC-ABOPC Days 2008: Session 1 Summary ATC-ABOC days Summary Session; February Session coordinated by B. Mikulec AB-OP and O. Br ü ning AB-ABP Operation.
Ans Pardons (with input from Jean-Marc Cravero) CERN CNGS Horn Experience (issues since NBI2010) Ans Pardons, CERN 1 NBI2012.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
R. A. Barlow, LIU-PSB review, 20 Nov BI.DIS Pulse generators controls R.A.Barlow, LIU-PSB review, 20 Nov
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Technology Department CERN-GREECE INDUSTRY DAY Monday, 31 March 2014 TECHNOLOGY DEPARTENT 2 In the frame of the Accelerators & Technology Sector at CERN,
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
– Machine Controls Coordinators (MCC): team and role – Overview of renovations during LS1 – Proposal for after-LS1 Commissioning organization ACCOR PROJECT.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
© 2001 By Default! A Free sample background from Slide 1 Controls for LEIR AB/CO Technical Committee - 18 th March 2004.
13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 1 How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD.
Radio Frequency Andy Butterworth AB/RF Accelerator Controls Renovation WS 3 Dec 2008.
Two half-day seminars on the remaining work packages to complete the MEDICIS Facility POWER CONVERTERS FOR MEDICIS Davide Aguglia & Julien Parra-Lopez.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
Pulsed Magnet Power Supply Feasibility Study
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
What’s Falling Apart in the Injector Chain ? PS/SPS Days January 2005.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
ABT-EC EYETS Activities 2nd reports
ICE SECTION The coolest place to be! Elias Métral
EYETS David Hay EN-OSS.
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
BE-ICS activities for LIU Project
Start and maintenance of the B-train measurements for the PS complex and the SPS (Didier Cornuet) 19th January , 2006 PS and SPS days.
Installations, modifications, consolidation in 2005:
TE/EPC activities for YETS & LS2 LINAC 2-3, PSB, PS & TT2
TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
Target and Horn status report
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
EN-CV interventions during EYETS for PS and PSB
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
INTEGRATION DES ALIMENTATIONS REX-ISOLDE OBJECTIFS AB/PO
SLHC-PP kick-off meeting, CERN 9 April 2008
Experimental Areas – LS2 planning
ABP/RTL Main RTL Activities for 2007/8:-
LHC Machine Advisory Committee, CERN 12th June 2008
Presentation transcript:

AB-PO-PH 2005 Pulsed and High voltage converters Responsibilities: PS complex exploitation, active maintenance (documentation, improvement, spare), follow-up operation, physicist requirements. I-LHC project : Pulsed, high voltage and commercial converters (~ 150). Follow-up contract, installation, commissioning. ISOLDE: Follow-up the requirements (RFQc, Test front-end etc.) REX-ISOLDE: Power converters integration AB, interface PO/CO. CNGS : Power converters (horn and reflector), PH collaboration. CONSOLIDATION power converters: PS (gamma-transition), AD ( capacitors), Linac (dipoles, quadripoles) Stand test 3MeV (  Linac 4): Follow-up requirement 0.9 sec PS complex ; Multiturn ejection ; CTF3 (power converter source laser); Group Meeting J.P. Royer AB-PO-PH

AB-PO-PH 2005 Pulsed and High voltage converters PS complex exploitation, active maintenance (documentation, improvement, spare), follow-up operation, physicians requirements : Linac2 ( protons), PSB (Booster) and ISOLDE. 2005: Linac3 and commissioning de LEIR Pulsed power converters: current 10A to 40000A with voltage until 4kVolts High voltage power converters: voltage 1000V to 50000V current until 5A Piquet follow-up transition, 4 persons PO-PH in the piquet team ( second line) Collaboration for transfer information through FIRST LINE team and also through others sections PO. Group Meeting J.P. Royer AB-PO-PH

AB-PO-PH 2005 Pulsed and High voltage converters I-LHC project Group Meeting J.P. Royer AB-PO-PH

AB-PO-PH 2005 Pulsed and High voltage converters I-LHC ( linac3, LEIR,PS): Pulsed, high voltage and commercial power converters. Follow-up contract, commissioning. Planning very tight Pulsed dipoles5 HZ (14), commissioning now (linac 3) Pulsed quadripoles 5HZ (11), commissioning now (linac 3) HV electron cooling and RF (19) -IT 3225 AB-LHC- (FUG) HV RF power converters LEIR (2)- IT 3257 AB-LHC- (OCEM) Commercial power converters 1Q (30) -PE 21785/AB- (Delta) Commercial power converters 4Q (90)-IT 3262 AB- (Danfysik) Pulsed septum ejection power converter ~ 40 kA Pulsed septum injection PS, septum 26 (start PS 2006) Power converter bump 26 PS (start PS 2006) Group Meeting J.P. Royer AB-PO-PH

AB-PO-PH 2005 Pulsed and High voltage converters Group Meeting J.P. Royer AB-PO-PH

AB-PO-PH 2005 Pulsed and High voltage converters Group Meeting J.P. Royer AB-PO-PH Test power converters on the two types of magnets with flat top 500 microsec., 5Hz. Type VII  L= 1,3 mH, R= 0,2 Ohms Imax = 200A Uc=900V

AB-PO-PH 2005 Pulsed and High voltage converters Group Meeting J.P. Royer AB-PO-PH High voltage power converters 7,5 kV 190 kW for LEIR RF

ISOLDE Experimental physic (alone at CERN in 2005) Extension Group Meeting J.P. Royer AB-PO-PH

AB-PO-PH 2005 Pulsed and High voltage converters New transformers insulation 60 kV 50 kVA Group Meeting J.P. Royer AB-PO-PH 2 different transformers (with oil) New dry identical transformers

AB-PO-PH 2005 Pulsed and High voltage converters ISOLDE targets GPS HRS Power converters at 60 kVolts Group Meeting J.P. Royer AB-PO-PH

AB-PO-PH 2005 Pulsed and High voltage converters REX-ISOLDE integration AB ~ 146 power converters, 34 different types. Rationalisation power converters Rationalisation control-interface CO-PO, (first part in June 2005) To foresee for exploitation: documentation, security aspect etc… New collaborator in the team PH, since march Group Meeting J.P. Royer AB-PO-PH

AB-PO-PH 2005 Pulsed and High voltage converters REX-ISOLDE: 146 power converters 34 types Group Meeting J.P. Royer AB-PO-PH

AB-PO-PH 2005 Pulsed and High voltage converters CNGS: power converters (horn and reflector); collaboration department PH Electronic PO for the pulsed power converters horn and reflector. Control interface 1553 and timing TG8 (CO). Adaptation timing, internal software. Adaptation hardware Test BA7 foreseen 2005, then installation 2 power converters BA4. Group Meeting J.P. Royer AB-PO-PH

AB-PO-PH 2005 Pulsed and High voltage converters Consolidation: Pulsed power converter for PS gamma-transition (2 or more ? ) functional specification (mi 2005), proposition of design, technical specification (end 2005) Technical specification for capacitors pulse power converters (13) 4 kVolts, 4000A de AD Pulsed power converters for dipoles (25) Linac2 et (10) PSB, for quad (80) Linac 2 (budget and planning) Stand test 3 MeV: follow-up  Linac4 (approval end 2006?) Beam test 3 MeV beginning 2007 Quad power converters (11), dipole power converters (2) High power converters HT RF (2) collaboration ??; (12 power converters for Linac 4.) Group Meeting J.P. Royer AB-PO-PH

AB-PO-PH 2005 Pulsed and High voltage converters CTF3: power converter for laser system photo-injector. Multiturn Ejection: analyse for reorganisation of the pulsed power converters for ejection 16.(Bump 16, etc..) 0.9sec complex PS: follow-up power converters Linac 2, PSB ( pulsed power converters septa PSB-PS) Group Meeting J.P. Royer AB-PO-PH

AB-PO-PH ( ) Team 2005 AB-PO-PH ( Pulsed and High voltage converters ) Team 2005 CRAVERO Jean-Marc DAVID Nicolas JOFFE Stéphane LAHAYE Joël PARRA-LOPEZ Julien SEGUIN Maurice (~ 60% ) SIMONET Gilles ROYER Jean-Pierre Group Meeting J.P. Royer AB-PO-PH Poste AB-PO-PH LD-LSC Site web AB-PO-PH