Dealing with Catastrophic Storm Issues January 2009 SE Missouri Ice Storm Missouri PSC Storm Workshop Presented by Dave Wakeman Manager, Distribution Operating.

Slides:



Advertisements
Similar presentations
Florida Public Service Commission 2007 Hurricane Preparedness Briefing May 23, 2007 Kissimmee Utility Authority Ken Davis Vice President Engineering &
Advertisements

FPUA Storm Readiness 2007 Florida Public Service Commission Internal Affairs May 23, 2007 Craig Brewer- Superintendent of Electric T&D.
Hurricane Season Preparedness Briefing Gulf Power Company June 5, 2006.
Progress Energy Florida 2007 Hurricane Preparedness Florida PSC Hurricane Preparedness Meeting May 23, 2007.
Florida Public Service Commission Internal Affairs Hurricane Season Preparation Paul Davis, Director Energy Control Center June 5, 2006.
Hurricane Sandy. Sandy was the second-largest Atlantic storm on record Storm surge reached over 13 feet in coastal areas of New York and New Jersey The.
After the Storm: Using GIS for Damage Assessment and Restoration October 2004 O ne GIS, Inc. One Platform, One Solution, One Company…
FPL Hurricane Assessment Operating Committee January 25, 2005.
Preparation and Response to Hurricane Irene Presentation to: UASI Conference May 24, 2012 Gusts 60 mph predicted 6-10 inches of rain predicted.
Westar Energy Emergency Preparedness and Restoration TFR Meeting June 26, 2012 Jim Tyler Director, Distribution Services.
How to use this presentation. How Power is Restored After a Severe Storm Presented by YOUR NAME YOUR TITLE.
2011 Windstorm “Be Prepared: Preventing Disaster/ Planning for Recovery” South Bay Cities Council of Governments 13 th Annual General Assembly February.
1 April 27, 2011 Southeast Tornado Event System Operator Conference September and September 25-27, 2012 Memphis, TN Rocky Williamson, SOS Chair Operations.
State Emergency Operations Center John H Campbell Operations Chief MO State Emergency Mgt Agency Disaster Operations.
Winter Storm Pax February 2014 John Kraft Georgia Power Media Relations & Social Media July 30, 2014.
1 Kenneth (Kenny) Mercado Vice President Distribution Electric Operations Preparing Your Home Utilities.
How Duke Energy Prepares for Emergencies and the Restoration Process North Carolina Emergency Management Association Conference Marty Wright, Director.
Customer Meeting April 28, 2010 Torrington, WY. Agenda Introductions Accomplishments Update on Torrington Area PVVC Overview PVVC Schedule and Cost Estimates.
The Impact of Ice Nebraska Public Power District
Organizational Tabletop Exercise 1 Hurricane Scenario (Community-Based Organizations) Date | Location.
1 Impact of the 2004 Hurricanes Hurricane Charley Landfall on August 13 th Customers affected Poles replaced Transformers replaced Miles of wire replaced.
Electric Infrastructure Workshop Gulf Power Company January 23, 2006.
1 Hurricane Sandy Response from Critical Infrastructure June 6, 2013.
Wildfires Morning Briefing May 19, Please move conversations into ESF rooms and busy out all phones. Thanks for your cooperation. Silence All Phones.
Florida Power & Light 2006 Hurricane Preparedness Plan June 5, 2006 Presented by: Geisha Williams.
After the Storm Recreated from Carolina Country, the monthly magazine of the N.C. Association of Electric Cooperatives The steps to restoring power Click.
January 2009 SEMO Ice Storm Extreme Measures IEEE-PES St Louis Chapter Meeting June 18, 2010 Presented by David Wakeman Vice President, Energy Delivery.
PINAL COUNTY TOWN HALL Tabletop Exercise - Panel Discussion on a Local Emergency.
Lee County Electric Cooperative 2007 Hurricane Preparedness Activities.
Infrastructure Development & Needs From a Commercial Viewpoint Chris Hendrix General Manager, Texas Retail Energy, LLC Manager of Energy Procurement, Wal-Mart.
FPSC Electric Utility Infrastructure Workshop Florida Municipal Electric Utilities Alan Shaffer Assistant General Manager - Delivery Lakeland Electric.
ACC Summer Preparedness Hearing Tucson Electric Power & UNS Electric March 22, 2007 Ed Beck Superintendent Transmission & Distribution Planning.
Florida Public Service Commission Restoration Workshop January 23, 2006 William H Mayer, P.E. Edison Electric Institute EEI’s Mutual Assistance Program.
EECE 887 Distribution System Engineering CHAPTER 1 Power Delivery Systems.
1 Verizon Florida, LLC Hurricane Season Preparation PSC Workshop – May 6, 2009.
Tampa Electric Company 2009 Hurricane Season Preparation Regan Haines Director, Energy Delivery May 6, 2009.
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
2009 Hurricane Season Preparations Florida Public Utilities Company May 6, 2009.
2015 HURRICANE SEASON PREPARATIONS March 18, 2015.
2014 Hurricane Season Preparation Informal Meeting for Electric Utilities with Florida Public Service Commission Staff March 26, 2014.
2009 Hurricane Preparedness Richard Shaheen Sr. Director, Engineering & Technical Services May 6, 2009.
2006 Hurricane Preparedness June 5, 2006 Sumter Electric Cooperative, Inc R. Ben Brickhouse: Director of Engineering & IT John J. LaSelva: Director of.
Tampaelectric.com Presented to the Florida Public Service Commission May 1, 2008 Tampa Electric Company 2008 Hurricane Season Preparation Regan Haines.
New Madrid EX branch Briefing October 30, Please move conversations into ESF rooms and busy out all phones. Thanks for your cooperation. Silence.
2009 Hurricane Season Preparedness Briefing Gulf Power Company Presented by Andy McQuagge Power Delivery Services Manager May 6, 2009.
2008 Hurricane Season Preparedness Briefing Gulf Power Company Presented by Andy McQuagge Power Delivery Services Manager May 1, 2008.
2015 Storm Readiness Report Kurt Miller, Director of Engineering Suwannee Valley Electric Cooperative, Inc.
2014 Storm Preparedness Jeff Brewer – Manager of Engineering Tri-County Electric Cooperative, Inc.
2015 Hurricane Season Preparedness Briefing Jorge Puentes Engineering Manager – Northeast and Northwest Divisions March 18, 2015.
Verizon Florida, LLC Hurricane Season Preparation PSC Workshop – May 1, 2008.
2014 Hurricane Season Preparedness Briefing Jorge Puentes Technical Projects Manager – Northeast and Northwest Divisions March 26, 2014.
Hurricane Lindahl 2016 System Operator Seminar. Hurricane Watch 2 The National Hurricane Center in Miami has issued a hurricane watch for the Southern.
Informal Meeting with FPSC Staff 2015 Hurricane Season Preparation March 18, 2015.
Impact of Hurricane Ike on CenterPoint Energy’s Transmission System Paul Rocha Director, Transmission Planning Presented at October 2, 2008 ERCOT TAC Meeting.
AMP Technical Conference Mutual Aid April 28-29,2009 Host Community Responsibilities.
Permanent Solutions to Temporary Loads: An Alternate Approach to Electrical System Design for Short Term and Mobile Industrial Loading Presented by: Eli.
Utility Needs and Smart Grid for Major Storm Events
Impact of Hurricane Ike on
Florida Public Service Commission’s 2007 Storm Preparedness Workshop
2008 Hurricane Season Preparations
Florida Public Service Commission
Hurricane Preparedness Plan 2008
Pacific Power Seismic Preparedness Update
Progress Energy Florida 2008 Hurricane Preparedness Florida PSC Hurricane Preparedness Meeting May 1, 2008.
2007 Hurricane Season Preparations
Florida PSC 2014 Hurricane Season Preparation
Florida PSC Hurricane Preparedness Meeting May 6, 2009
2007 Hurricane Season Preparedness Briefing
TxMAG presentation
Presentation transcript:

Dealing with Catastrophic Storm Issues January 2009 SE Missouri Ice Storm Missouri PSC Storm Workshop Presented by Dave Wakeman Manager, Distribution Operating AmerenUE

Monday, January 26 Preparation and Advanced Warning Quantum Weather predicts the possibility of ice storm in southern 1/3 of state Mobilized contractor resources and Missouri Valley resources to SEMO south Mobilized 3 storm trailers and 1 Mobile Command Center

And it starts Tuesday, January 27 At 4 a.m. only 800 customers out—just the beginning Major ice accumulation occurring throughout the day in SEMO south area Decision made to move all available AmerenUE resources to SEMO Outage numbers climb throughout the day Additional contractor resources procured 650 linemen and 350 tree trimmers engaged by end of day

Significant Ice Formation Wednesday, January 28 Ice continues to build— outage count over 36,000 in A.M. 6 counties in Bootheel are essentially without power Decision made to use Extensive Damage Recovery Method SEMO south divided into 8 “work islands” 1150 linemen and 450 tree trimmers engaged by end of day

Missouri Counties Served by AmerenUE That Were Affected Cape Girardeau Dunklin Mississippi New Madrid Pemiscot Scott Stoddard

Issues and responses Dense fog in morning caused black ice, generally dangerous driving conditions. Widespread damage - added storm trailers bringing the total to 8 Long repair times- Installed 3-2MVA generators to supply power for 2 towns

Issues and responses Storm damage continues until the ice melts Then came the mud - needed farmer’s equip.

Mutual Assistance from: Texas, Iowa, Illinois, Georgia, Tennessee, Kansas, Oklahoma Alabama, Missouri

Resource Summary Linemen 2400 Vegetation 555 Field Checking 160 Logistics 70 Stores 85 Other Support Personnel 730 Total Resources 4000

Major Restoration Obstacles Extensive widespread severe damage Sub-transmission System Distribution System Logistics No power in the entire region for nearly 4 days Rural Area—limited infrastructure Supply Chain

Widespread Damage Virtually 100% of AmerenUE customers in 6 counties without power 34 kV Sub-transmission System 25 circuits out of service and requiring major repair Portageville 71 (34kV) 30 miles long with 1 pole left standing 35 distribution substations without power 20 customer subs without power Distribution System 163 distribution circuits out of service

Distribution System Many towns required significant re-builds

Logistics

Logistics Issues On Wednesday night we had rooms but they all lost power as the lineman were bedding down Logistics issues were significant – enlisted help of a logistics company

Logistics 15,500 hotel room nights 2300 alternative sleeping arrangements—bunk trailers, dorms, etc. 76,000 meals loads of laundry 44 buses

Accomplishments Portageville 71 Re-build 30 miles of line supplying 2 towns Completely re-built entire circuit in 3 ½ days using 500 linemen Collaborated with SEMA and REC’s to transition resources to Co-ops Participated in twice daily SEMA conference calls Provide daily restoration status updates

Supply Chain Issues Comparison: SEMO Ice Storm vs. Sept 14, 2008 Storm (Hurricane Ike) SEMO Ice Storm 36,000 customers out Major Material Installed 3800 poles 7000 cross arms 700 transformers 1,440,000 ft of wire (273 miles) Sept 14, 2008 Wind Storm (Hurricane Ike) 161,000 customers out Major Material Installed 38 poles 295 cross arms 58 transformers 69,000 ft of wire

Conclusions Emergency Plan designed to manage this contingency Logistics Plan was stretched to it’s limits— many improvement opportunities identified Supply Chain process stretched to it’s limit— many improvement opportunities identified Preparation and advanced planning keys to success along with after-action review