U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline and Hazardous Material Safety Administration (PHMSA)

Slides:



Advertisements
Similar presentations
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Damage Prevention PHMSA Update Annmarie Robertson PHMSA/Office.
Advertisements

Joe Killins & Associates, LLC Pipelines & Risk Based Management How Safe is Safe?
2010 PODS User Conference Houston, Texas October 28, 2010 PHMSA Update John A. Jacobi, P.E. CATS Manager, SW Region.
The Pipeline and Hazardous Materials Safety Administration (PHMSA) Spill Control Association of America 2014 Annual Meeting and Conference March 20, 2014.
CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES.
Integrity Management Program Special Permits (IMP-SP) Draft Administrative Plan 12/5/2007.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration NW Area Committee Meeting Focus on Pipelines PREVENTION & PREPAREDNESS.
Ohio’s One-Stop Utility Resource Gas Pipeline Safety Pipelines - State and Local Issues Pete Chace GPS Program Manager (614)
Interstate Natural Gas Association of America INGAA Action Plan to Build Confidence in Pipeline Safety INGAA Integrity Management Continuous Improvement.
AGA Perspectives on Current Pipeline Safety Regulations August 2014.
Congressional Reauthorization and PHMSA Rulemakings – Enough to avoid future tragedies? Carl Weimer, Executive Director Pipeline Safety Trust.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
Overview of Key Rule Features
Pipeline Safety Program Regulatory (DOT) Pipeline Risk Management Pipeline Safety Trust New Orleans, Louisiana November 16, 2007 John A. Jacobi, P.E. PHMSA.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration U. S. Department of Transportation Pipeline and Hazardous.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 2010 NARUC Annual Conference Atlanta, Georgia November 15, 2010.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline and Hazardous Materials Safety Administration Program.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Instilling A Culture of Safety Alan Mayberry Deputy Associate.
Regulation of Pipelines
ILLINOIS COMMERCE COMMISSION Darin Burk Pipeline Safety Program Manager.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration San Bruno – Lessons Learned Alan K. Mayberry, P.E. Deputy Associate.
Integrity Management Inspection Process Don Moore, OPS Central Region.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Harold Winnie, CATS Manager (Central Region) Leak detection for.
Western Regional Gas Conference August 25, 2009 Distribution Integrity Management Programs (DIMP) & SHRIMP.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
Lessons Learned….. Were PG&E practices an anomaly or the tip of a bigger problem? How would we know? 2011 Pipeline Safety Trust Conference – Getting to.
Western Regional Gas Conference August 24, 2010 Distribution Integrity Management Programs (DIMP) Rule.
U.S. DOT Pipeline and Hazardous Materials Safety Administration Pipeline Safety Reauthorization September 16,
Current Inspection Process for Operators of Hazardous Liquids Pipelines Rod Seeley OPS SW Region Director May 18, 2005.
RAILROAD COMMISSION OF TEXAS Stephanie Weidman Austin Regional Manager Oversight and Safety Division Pipeline Safety September 2015.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Regulatory and Compliance Landscape Western Region Gas Conference.
Pipeline Safety Trust Fort Worth Natural Gas Production Issues John W. Pepper Project Manager Office of Pipeline Safety Southwest Region, Houston, Texas.
Distribution Integrity Management – What To Expect John Erickson, PE American Public Gas Association Western Regional Gas Conference.
Office of Pipeline Safety Integrity Management Inspection Process Louisiana Pipeline Safety Seminar August 2003.
America’s Natural Gas Utilities’ Distribution Pipelines November 2, 2006 The Connection To the Customer.
ILLINOIS COMMERCE COMMISSION Darin Burk Manager – Pipeline Safety 1.
Pipeline Safety: How the Mayor’s Council On Pipeline Safety Can Help Presentation to: Mayor’s Council on Pipeline Safety Conference Name: Christopher A.
10/09/03 GR: U.S. Department of Transportation Research and Special Programs Administration 10/09/03 Number of Accidents Trendline 01.
Ensuring Success in Integrity Management Marty Matheson American Petroleum Institute July 24, 2002.
1 November 3, 2006 David Knoelke API Public Awareness Committee Chair (BP Pipelines N.A.) Greater Public Involvement – What does that mean?
A Framework for Your Pipeline Integrity Program. 2 A Few Thoughts Before Beginning l This rule is new to the pipeline industry although many of the concepts.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
What’s Wrong with Integrity Management? How Do We Improve Integrity Management? Terry Boss Senior Vice President Safety Environment and Operations PST.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Current Rulemakings.
Pipeline Performance Measures Alan Mayberry New Orleans, Louisiana Pipeline Safety Trust Annual Conference
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 1 Mike Israni Senior Technical Advisor Manager: Standards & Committees.
Pipeline Safety – 2015 Year in Review. Large PHMSA Budget Increase Pipeline Safety spending in 2015 was increased $26.9 million. Main areas of expansion.
How Old is too Old? Who Makes that Decision? Alan Mayberry New Orleans, Louisiana Pipeline Safety Trust Annual Conference
Lessons Learned from Integrity Management Inspections Byron Coy – OPS Eastern Region Derick Turner – OPS Southern Region May 17, 2005.
Rulemaking Process and Cost Benefit Analysis
Office of Pipeline Safety Hazardous Liquid Pipeline Integrity Management July , 2002 Houston, Texas Welcome.
U.S. DOT Pipeline and Hazardous Materials Safety Administration Integrity Management Systems November 18, 2015 Chris McLaren - 1 -
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Current Rulemakings.
High Consequence Areas & Pipeline Assessment Intervals Pipeline Safety Trust New Orleans, LA November 20, 2008 Elizabeth Komiskey, P.E. PHMSA/Office of.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration State Program Action Plan Linda Daugherty – OPS July 12, 2012.
Public Awareness Programs for Pipeline Operators WESTERN REGIONAL GAS CONFERENCE August 21, 2007 Presented by: Ross Reineke.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
Who is INGAA? INGAA represents the majority of the interstate natural gas transmission pipeline companies operating in the U.S., as well as comparable.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Regulatory Initiatives.
Distribution Integrity Management Program
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PREVENTION & PREPAREDNESS May 11, 2016 REGIONAL RESPONSE TEAM.
Gas Pipeline Safety Federal Regulatory Update Pete Chace Public Utilities Commission of Ohio Gas Pipeline Safety Program Manager.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Current Rulemakings.
Integrity Management Continuous Improvement Project Status and Implementation Process Presentation for: PHMSA Advisory Committees July 11, 2012.
Federal Regulatory Update
AGA Positions on Current PHMSA Rulemakings
National Conference of Regulatory Attorneys
Distribution Integrity
Presentation transcript:

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline and Hazardous Material Safety Administration (PHMSA) Office of Pipeline Safety Dave Mulligan Community Assistance & Technical Services (CATS) Western Region

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Western Region Facts Western Region encompasses 12 states 26 Inspectors and 3 Contractors Regional office Based in Lakewood, CO Major Satellite offices in Anchorage, AK and Ontario, CA One man field offices in Billings, MT, Cheyenne, WY, and Reno, NV

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration CATS Western Region Focus Public Complaints/Whistleblowers Technical Support Re: Pipeline Safety Regulations Emergency Response – Information dissemination including incident causes and PHMSA safety actions Permits – Foster relationships with other Federal/State/Local agencies and pipeline operators Pipeline Safety Education - public and gov’t officials Operators’ Public Awareness Program Effectiveness Evaluations (PAPEE)

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Western Region (WR) CATS Example 1 Products pipeline – Willard Bay, UT (March 2013) –Low frequency seam failure –Focus on communication (federal, state, local public officials) to cause and mandated remedial actions –Ongoing communication through startup and ongoing repairs and tests.

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration WR CATS Example 2 Products pipeline – Lodge Grass, MT (July 2013) –Failure due to land movement –Facilitated Interaction between Crow Nation leaders and pipeline operator due to cause and follow PHMSA actions –Communication with public officials due to remoteness

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration WR Safety Challenges Low stress and rural gathering lines applicability – Finding those operators who do not think they are regulated by PHMSA AC Interference/Lightning Landslide Areas Seasonal flash flooding events Encroachment of urban areas and parallel utility/pipeline construction Aging Infrastructure Being Overly Amortized - Bandaids Impact of Shale Oil/Gas: New, Reversed, Converted Pipelines Challenges to Recruit, Train and Retain Qualified Workforce The World is Watching – Bloggers and the Internet

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Integrity Management (IM) IM Program Working: –ILI tools advancement in technology (MFL, geometry, crack, seam, stress/strain) continue to identify integrity threats before they can fail –Systems being reassessed and compared to previous ILI results thereby finding changes in pipe condition –Fewer incidents caused by: Corrosion Outside Force Damage (dents/gouges)

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Who Regulates Pipelines Who Regulates Pipelines Individual state U.S. DOT, PHMSA In California: Hazardous Liquid Pipelines  CSFM Regulates Intrastate pipelines  PHMSA Regulates Interstate pipelines Natural Gas Pipelines:  CA PUC Regulates Public Utilities systems within CA  PHMSA Regulates all other systems (municipal distribution, master meter, non-public utility transmission)

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Jurisdictional Vs. Regulated? Jurisdictional: Transportation of hazardous liquid by pipeline under Part 195 Regulated: Pipeline facilities and the transportation of gas that are not exempted under Part 195.1(b) –In plant –Gravity –Other modes of transportation - 9 -

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration What We Regulate Pipeline Miles by System Types – as-of 3/14/2013 System TypeMiles%Total# Operators Hazardous Liquid 182,5637%379 Gas Transmission 304,87312%923 Gas Gathering 19,8721%320 Gas Distribution (Mains & Services ) 2,114,65980%1308 Total 2,621,966 Some Operators have multiple System Types Liquefied Natural Gas 97 Plants 138 Tanks57 Operators

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Regulatory Update Regulatory Update This PHMSA website link has the status of federal rulemaking Not much new in

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Rulemakings in Process Safety of On-Shore Hazardous Liquid Pipelines (NPRM stage) Excavation Damage Prevention (Final Rule stage) Miscellaneous Rulemaking (Final Rule stage) EFV Expansion beyond Single Family Residences (NPRM stage) Safety of Gas Transmission and Gathering Lines (NPRM stage) Operator Qualification, Cost Recovery and Other Pipeline Safety Proposed Changes (NPRM stage) Plastic Pipe (NPRM stage) Standards Update (Final Rule stage) Rupture Detection and Valve Rule (NPRM stage)

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Current Rulemakings in Process Safety of On-Shore Hazardous Liquid Pipelines (NPRM stage)  NPRM moved past PHMSA  ANPRM published 10/18/2010  Major topics under consideration: Assessments beyond High Consequence Areas (HCAs) Leak detection beyond HCAs Repair criteria in HCA and non-HCA areas Stress Corrosion Cracking (SCC) Piggability of lines Reporting requirements for Gathering lines Gravity Line exception

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration The Pipeline Inspector Regular People, believe it or not? (like Operations people) Hired to protect the public and environment from pipeline inherent risks (Enforce Pipeline Safety Regulations) 80+ days away from home Plenty of windshield time Typically no Hilton where Interstate Pipelines are Not out to “get-em” philosophy We do not get graded on finding something wrong Another information resource for operators

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Inspector’s Role #1 tool to enforce regulations is phone call and showing up Ask plenty of questions – and listen Be considerate and cooperate with the operator –Meeting time/place –Understand operators file keeping process Different set of outside eyes on safety Should learn something new each inspection Inform operator of deficiencies/concerns upon leaving Why I do it: –Great people and industry –Would rather be on the ROW than in office

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration It’s Inspection Time Don’t panic Should be prepared every day –Records in order –Business as usual Typically scheduled Your time to show off your pipeline safety program Ask questions and be cooperative Don’t be afraid to voice your opinion Seems tougher on the inspector than operator

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration New PHMSA Inspection Tool IA – Inspection Assistant A tool for Inspector’s to capture results from questions A software application installed on a laptop (client/server solution) Replaces standard MSWord inspection forms and questions Electronically records inspection results in database for historical trending Provides considerations/guidance to Inspector to determine compliance to regulations –Considerations are for inspector guidance only. They are memory joggers. They are not meant to replace the code

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Western Region CATS Contact Information Tom Finch: Phone: (720) Dave Mulligan: Phone: (720)

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline and Hazardous Materials Safety Administration Hazardous Liquid IM Program Huy Nguyen West Dakota Avenue, Suite 110 Lakewood, CO

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration General Topics Overview Observations Western Region Focus Areas

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Objectives for the HL IM Program Accelerate and improve the quality of integrity assessments conducted on pipelines in areas with the highest potential for adverse consequences, Promote a more rigorous, integrated, and systemic management of pipeline integrity and risk by operators, Strengthen government’s role in the oversight of pipeline operator integrity plans and programs, and Increase the public’s confidence in the safe operation of the nation’s pipeline network.

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Overview of HL IM Program Hazardous Liquid Pipelines - ~186,000 (1) miles. Over 79,000 (1) miles or 43% of all hazardous liquid pipelines designated as potentially affecting a high consequence area (1) immediate repair conditions have been remediated 32,000 (1) 60 and 180-day conditions have been remediated (1) – 2012

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Program Elements for the HL IM Program Segment Identification Risk Analysis Baseline Assessment Plan Assessment Results Review Remediation Preventive and Mitigative Measures Continual Assessment Performance Evaluation

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Overview Segment Identification: –Direct Intersect Method –Release Locations and Spill Volumes –Overland Spread of Liquid Pool –Water Transport Analysis –Air Dispersion Analysis –Identification of Segments that Could Indirectly Affect an HCA

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Overview Risk Analysis: – Comprehensiveness of Approach – Integration of Risk Information – Process for Input of Data and Information – Risk Analysis of Segments that Could Affect HCAs – Results – Facilities

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Overview Baseline Assessment Plan: –Assessment Methods –Prioritized Assessment Schedule Category 3 – Date of pipeline begins operation Low-stress pipeline: –Category 1 – July 3, 2015 –Category 2 – October 1, 2016

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Overview Assessment Results Review: –Qualifications of Individuals that Review and Evaluate Assessment Results –ILI Vendor Specifications –Validation of Assessment Results –Integration of Other Information with Assessment Results –Identifying and Categorizing Defects –Hydrostatic Pressure Testing –Results from the Application of Other Assessment Technologies

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Overview Remediation: –Discovery of Condition –Schedule of evaluation and remediation –Special requirements for scheduling remediation Immediate Repair Conditions 60-day Conditions 180-day Conditions –Pressure Reduction: Temporary Pressure Reduction Long-term Pressure Reduction

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Overview Preventive and Mitigative Measures: –Risk Analysis Criteria –Leak Detection Capability Evaluation –Emergency Flow Restricting Devices (EFRD) Evaluation

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Overview Continual Evaluation: –Periodic Evaluation –Reassessment Interval –Assessment Methods –Assessment Interval Variance –External Corrosion Direct Assessment (ECDA)

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Overview Performance Evaluation: –Process for Measuring IM Program Effectiveness –Records Demonstrate IM Program Effectiveness –Process for Defining Performance Metrics –Records Demonstrate Effective Use of Performance Metrics –Communication of Evaluation Results –Root Cause Analysis Process –Revision and Document Control

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Observations Operators generally understand the Rule and are implementing the assessment provisions of the Rule. Operator interactions have been generally cooperative with open communication. Operators of small systems may be more likely to contract out significant portions of IM program development. Operators now have an improved understanding of the condition of pipelines in the safety-sensitive areas.

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Observations Operators are generally making progress toward developing the mature, proactive IM Program. Progress is needed in development and implementation of several IMP elements  Preventive & Mitigative Measures  Continual Evaluation  Performance Evaluation  Remediation

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Western Region Focus Areas Assessment Results Results of ILI Tool Data Evaluation Repair Records Preventive and Mitigative Measures Performance Metrics (1) Verification of Records (2) Other IMP Activities (1)– ADB & Office of the Inspector General (OIG) (2) - ADB

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Questions ?