Planning for and Collecting Valid and Meaningful Drinking Water Samples 1 James Latimer Environmental Program Specialist Drinking Water Program AK Dept.

Slides:



Advertisements
Similar presentations
Laboratory Sample Result Electronic Submission Lab to State 2.0 and Electronic Submission.
Advertisements

Western RCAP Rural Community Assistance Corporation (916) Midwest RCAP Midwest Assistance Program (952)
Regulatory Review Presented by: Joe Munson. Outline  New Employee/Office  Lead and Copper Reminder  Stage 2 Disinfection Byproduct Rule.
Michelle Wind, Drinking Water Program Supervisor,
Potential Pathways for Coliform Contamination. Fixing Positive Coliform Results.
Nathan Saunders, P.E. Maine Drinking Water Program Public Water System Owner & Operator Responsibility.
School Name Here 2010 NECAP Science Test Administrator Workshop.
Bacteriological Sampling Ken Morin, P.E. (based on slides prepared by: Bob Clement, EPA Region 8)
Sustained Compliance Workshop - Anchorage, AK September 23-24, 2010 Eric Burg Kenai Peninsula & Southeast Alaska – Compliance & Monitoring Section DEC.
Leah A. Guzman Environmental Program Specialist Drinking Water Program Alaska Department of Environmental Conservation Sustained Compliance for Public.
TTHM – HAA5 Sampling Procedures
Requirement to Report Changes in Contact Information; Emergency Preparedness Requirements Leslie Shurtleff PWS Security Specialist Drinking Water Program.
Inorganic Chemicals (IOC) Non-Metals Sampling Procedures.
Cindy Christian Compliance & Monitoring Manager DEC Drinking Water Program Sustained Compliance Workshop September 23-24, 2010.
Division of Occupational Safety and Health (Cal/OSHA) March HEAT ILLNESS PREVENTION TRAINING.
Revised July 2015 Safe Drinking Water Program.
Alaska Department of Environmental Conservation Presents Drinking Water Program Heather Newman South-central Area Program Coordinator.
World Health Organization
Operational Evaluation Level Stage 2 D/DBP Rule Compliance Michael W. Deal Compliance Assurance Section Central Office Division of Drinking And Ground.
Leah A. Guzman Environmental Program Specialist Drinking Water Program Alaska Department of Environmental Conservation Sustained Compliance—What It Means.
Monitoring Plan Template
The Stage 2 Disinfection By-Products Rule DoD/EPA State Conference Compliance Track DoD/EPA State Conference Compliance Track Atlanta, GA Atlanta, GA June.
Safe Drinking Water Act Phase II & V Sampling Procedures: Volatile Organic Compounds (VOCs)
After the Sanitary Survey
Mississippi State Department of Health
Support Programs version 2 March 2010 Cleaning and Sanitation
STAGE 2 DISINFECTION BY- PRODUCTS (DBP’S) A GUIDE TO COMPLIANCE 1.
Radionuclides Sampling Procedures. The purpose of these slides is to demonstrate recommended sampling techniques. This presentation includes: supplies.
Lead and Copper Sampling Procedures
Total Coliform Rule (TCR) Sampling Procedures. The purpose of these slides is to demonstrate recommended sampling techniques. This presentation includes:
Drinking Water Compliance “Top 10” KY Water and Wastewater Operator Association Conference Louisville, Kentucky.
MRWS GROUND WATER RULE (GWR) PREPARED BY JOHN CAMDEN MRWS GROUND WATER TECH
Developing Plans and Procedures
Erin James Virginia Master Well Owner Network Training October 29-30, 2008 Harrisonburg Virginia Conducting a Drinking Water Clinic.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
COLIFORM SITE SAMPLING PLAN Gary Carlson Drinking Water Program U.S. EPA Region 8.
All About Sanitary Surveys David Edmunds Environmental Program Specialist ADEC Drinking Water Program Sustained Compliance: What It Means to Public Water.
TOTAL COLIFORM MONITORING 40 CFR TRANSIENT NON-COMMUNITY PUBLIC WATER SYSTEMS.
Drinking Water Tiffany Floyd Assistant Regional Administrator/ Regional Drinking Water Manager.
Safe Drinking Water Act Phase II & V Sampling Procedures: Diquat - Method
EPA Groundwater Rule 40 CFR Parts and 142. Reasons for the Groundwater Rule  To protect public health due to viruses and other bacterial exposure.
Safe Drinking Water Act Phase II & V Sampling Procedures: Volatile Fumigants – Method 551.
Industrial Stormwater Sampling May 25, 2011 Blaine, Minnesota.
1 City of Shelby Wastewater Treatment Division Becomes State’s Second Public Agency to Implement a Certified Environmental Management System CERTIFICATION.
Inorganic Chemicals (IOC) Metals Sampling Procedures.
Total Coliform Rule (Old)vs. Revised Total Coliform Rule (New)
Level 2 Assessment. Abbreviations to Know RTCR – Revised Total Coliform Rule TCR – Total Coliform Rule TC – Total Coliform EC – E. Coli PN – Public Notice.
Drinking water 2010 July 2011 Private Water Supplies – What it all means to me? Phil Smart Laura Moss Drinking Water Inspectorate.
Presentation Outline Cook Inletkeeper Mission & Programs Water Quality Basics Water Testing Options Sampling Schedule and Instructions Questions? Wrap.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
Source: Penn State University Date and TimeLocation Kickoff Meeting Receive sample kits, an introduction to the program, and instructions Fill in Sample.
Revised Total Coliform Rule Rural Water Workshops
CTC 450 Review Open Channel Flow (Manning’s Equation)
Lead and Copper Rule (LCR)
Lecture (9): Monitoring & sampling methods, maintenance ,
How to conduct a Drinking Water Clinic: Logistics
Your Public Water System’s Cross-Connection Control Program
Sample Siting Plans under the Revised Total Coliform Rule
YOUR County Drinking Water Clinics Kickoff Meeting DATE
Sample Site Plans.
Treatment – Chlorine Disinfection
YOUR County Drinking Water Clinics Kickoff Meeting DATE
OHWARN Workshop Disruption of Service Rule Update
Source: Penn State University
How to Use the Texas Drinking Water Watch Website
Alexander Hinz & Kasy Stinson Water Supply Division
Trade Fair 2017 Mia Gonzales and Jason Williams
Disinfection Byproducts (DBPs) Operational Evaluation Level (OEL)
Public Water System Supervision Program Quality Assurance Project Plan Requirements for Laboratories and Impacts on Public Water Systems (Part 1) Jessica.
Kasy Stinson Water Supply Division
Presentation transcript:

Planning for and Collecting Valid and Meaningful Drinking Water Samples 1 James Latimer Environmental Program Specialist Drinking Water Program AK Dept. of Environmental Conservation Sustained Compliance Workshop Anchorage, AK Sept 23-24, 2010

Presentation Summary Sample Planning – generalized and detailed Collecting Samples – preparations and procedures Sample Demonstration – total coliform & chemical Sample Results – understanding results and following through as needed Questions 2

Sample Planning 3 Planning Tools Total Coliform Sample Siting Plan Lead & Copper Sample Plan

Planning ahead can be critical to maintaining an adequate supply of safe and healthy water To succeed, we need to know (and do): 1. what needs to be done 2. when & where to sample 4 Importance of Planning

A Monitoring Summary includes: 5 What to sample for & where to sample How often to sample Date of last sample Date next sample is due Definitions and explanations DEC contact information

Other Examples of Monitoring Summaries 6

Other Planning Tools Printed media e.g., wall or desk calendar Electronic media e.g., alerts 7 Quarter

Specific Sample Plans The following sampling plans will not be covered today: A source water monitoring plan for Long Term 2 Enhanced Surface Water Treatment Rule (LT2); or A Stage 2 Disinfectant and Disinfection Byproducts Rule (Stage 2 DBPR) Initial Distribution System Evaluation (IDSE) sampling plan 8

Creating, Using, & Modifying a Total Coliform Rule (TCR) Sample Siting Plan 9

Total Coliform Sample Siting Plan ( 18 AAC ) Who is required to have one? Applies to Community, Non Transient Non-community, & Transient Non-community public drinking water systems What it is? Where and when to sample Routine sampling; and In the event of total coliform positive result: Within 24 hours, and the following month Sample site selection is important Keep a copy readily available onsite, & revise as needed 10

DEC TCR Sample Siting Plan* “Template” * for smaller systems, serving 1000 or less people 11 /publications/forms.html

System Information 12

Quarterly-Monthly Sampling Chart 13

What to do if a result is positive/present for total coliform bacteria or E. coli 14

Distribution System Schematic Any format E.g., engineer schematic, hand-drawn, notes on satellite image, and others DEC Drinking Water Program staff review & approve all Total Coliform Sample Siting Plans 15

Lead and Copper Sampling Plan (CWS and NTNCWS) Site selection Based on materials evaluation (pipes and fixtures containing lead and/or copper), & use (i.e. residential vs. commercial) Do not include sites with point-of-use or point-of- entry treatment devices for inorganics (1 exception) What to do if not enough sites. Names or IDs of sites should be clear and consistent Consistent locations provide results that can be compared over time Accessibility - changes Activity/Inactivity ( i.e., schools ) First Draw, after 6 hours with no-flow Newly replaced pipes or fixtures may influence results 16

Lead and Copper Sampling Plan Essentials Provide an explanation for selection of sites Provide clear and complete descriptions and names for each site, and include alternative sites Note sample procedures Flushing procedures Describe how 6-hour idle flow time will be met Note if residents will collect samples Emphasize collection from cold water tap Emphasize use of consumptive taps 17

Collecting Samples Preparations Supplies, Instructions, Forms Collecting samples Tap or site issues Potential contamination Container specifics Demonstrations Total Coliform Volatile Organics (VOCs) Recording & reporting data 18

Pre-collection Preparations Supplies Sample bottles Valid free chlorine residual powder packets Tools & paper towels Cooler (s) Ice & packing materials Disinfectant Forms Other items as needed Arrangements Lab hours Flights Coordinate with any relevant contractors Courtesy reminders to home or business owners –ensure access Payments Other items as situation warrants 19

Quiz & Clues – Distribution System Free Chlorine Residual Same Time & Location as each Total Coliform Sample Collect prior to Total Coliform sample Free - and check powder packet type & expiration date There is at least one approved free chlorine residual test strip When and where do we sample distribution chlorine residual? Do we sample before or after total coliform sampling, and does it matter? Is this a free or total chlorine measurement? How about test strips? 20

Distribution Chlorine Residual 21

Common Methods of Determining Free Chlorine Residual 22 Follow instructions provided by the manufacturer

Total Coliform Bacteria Sampling Reminders Arrange transportation Keep enough extra sample bottles on site Confirm sample location on the sample siting plan Personal and area sanitation is important Prepare faucet (avoid sampling at drinking water fountains): Disinfect then flush Fill to 100+ ml - not too little < 100ml gets rejected Not too much Sample bottles are brittle Pad for shipping, and do not submit if damaged Cool, yet not frozen Double check forms Limited hold time 23

Total Coliform Bacteria Sampling 24

A Completed Form/Analysis 25

Non-TCR Samples Today’s Special - VOCs Volatile Organic Compounds (VOCs) Total Trihalomethanes (TTHM) & Haloacetic Acids (HAA5) Lead & Copper Inorganics Arsenic Fluoride and more... Special bottle/lid Open septa lid prevents contamination while allowing for sample extraction at lab Do not rinse bottle Low tap flow Close to tap Bottle angled Fill completely - no air space Minimize overflow 26

VOC Sampling 27

Lab Forms 28

Partially Completed Forms 29 the lab

Sampling Demonstrations West aisle Kelly Cobbs (DEC) East aisle Leticia Tadina (DEC) 30

Reporting Ensure that time and money are not wasted: Recheck forms & labels for accuracy & completeness Label on bottle Labs are required to report results directly to DEC PWSs are responsible to ensure that DEC receives results 31

Points To Ponder & To Act On Plan & sample as far ahead as possible Develop, revise, and keep handy TCR and Pb/Cu sample plans Understand and use the Monitoring Summary, and use in combination with a calendar or other sample scheduling or tracking media. Sampling begins and ends with accurately and completely filling out forms Understand & address sample issues specific to each type of sample collected Accurate results are very important Water is very important Your job is very important 32

Thee End! ??? Questions, comments ??? 33