VERIFICATION AGENCIES WORKSHOP 5-8 September 2006 CHRISTINAH LEBALLO SANAS BEE PROGRAMME MANAGER South African National Accreditation System.

Slides:



Advertisements
Similar presentations
Establishing a New Accreditation Program in the U.S.
Advertisements

Module N° 4 – ICAO SSP framework
The Managing Authority –Keystone of the Control System
[Organisation’s Title] Environmental Management System
Auditing, Assurance and Governance in Local Government
Ensuring Better Services and Fair Value “Introduction and roadmap to implementation of ISO in Zambia’s water utilities” Kasenga Hara March 2015.
Environmental Management System (EMS)
Core principles in the ASX CGC document. Which one do you think is the most important and least important? Presented by Casey Chan Ethics Governance &
The New TNI Laboratory Accreditation Standards Requirements for an Accreditation Body.
B-BBEE VERIFICATION FRAMEWORK.  The BEE Verification process evolved since the release of the B- BBEE strategy in 2003  The dti was requested to provide.
Professional Behaviour
Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
The ISO 9002 Quality Assurance Management System
Laboratory Personnel Dr/Ehsan Moahmen Rizk.
ISO General Awareness Training
IS Audit Function Knowledge
Quality evaluation and improvement for Internal Audit
Office of Inspector General (OIG) Internal Audit
First Practice - Information Security Management System Implementation and ISO Certification.
Quality Assurance/Quality Control Policy
Purpose of the Standards
OHSAS 18001: Occupational health and safety management systems - Specification Karen Lawrence.
FPSC Safety, LLC ISO AUDIT.
Changes in new ISO/IEC 17024:2012. ISO/IEC 17024:2012 was published in July 2012.
ISO 9000 Certification ISO 9001 and ISO
ISA 220 – Quality Control for Audits of Historical Financial Information
5.2 Personnel Use competent staff Supervise as necessary
4. Quality Management System (QMS)
Instructions and forms
Photocopies Occasionally need uncontrolled copies
4. Quality Management System (QMS)
Elements of Internal Controls Preventing Fraud, Waste, and Abuse in Urban and Rural Transit Systems.
Internal Auditing and Outsourcing
Ship Recycling Facility Management System IMO Guideline A.962
Occupational Health and Safety
Verification Analyst Qualifications Verification Agencies Workshop 5-8 September 2006 Facilitator: Theo Lombard.
ISO 14001:2004, Environmental Management System
Association for BEE Verification Agencies Public Workshop 17 February 2006 Facilitator: Lenhle Daka.
Best Practices: Financial Resource Management February 2011.
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
SANAS ACCREDITATION DEES DHANRAJ BEE Lead Assessor.
Avoid Disputes, Not Complaints Presented by: Stuart Ayres and Derek Pullen Stuart Ayres, Scheme Manager Derek Pullen, Scheme Adjudicator.
Practice Management Quality Control
Programme Objectives Analyze the main components of a competency-based qualification system (e.g., Singapore Workforce Skills) Analyze the process and.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
Company Confidential Registration Management Committee (RMC) AS9104/2A Presentation San Diego, CA January 17, 2013 Tim Lee The Boeing Company 1 Other Party.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
Company Confidential Registration Management Committee RMC Auditor Workshop Charleston, SC July Supplemental Oversight AS9104/2A & Special.
Safety Management System Implementation Michael Niels Thorsen Moscow 15 September 2005.
Drs. Krishna and Webb October 31,  6  6.1  6.2  6.3  6.4  7.1, 7.2, 7.3, 7.4  7  7.3  7.4  LUNCH ANSI Training 2013: Webb/Krishna.
1 Kingsley Karunaratne, Department of Accounting, University of Sri Jayewardenepura, Colombo - Sri Lanka Practice Management.
1 Privacy Plan of Action © HIPAA Pros 2002 All rights reserved.
Policy and Procedure for the Handling of Complaints against the AG Consultation with the Standing Committee on the Auditor-General 9 April 2008 Wandile.
Internal Auditing ISO 9001:2015
FDIC Perspective on Environmental Risk Presented by: Gordon Stoner Legal Division Federal Deposit Insurance Corporation May 6, 2008.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
Verification, Validation and Internal Audits - Jose Jimenez Federal Facilities Program Manager – EPA Region III.
Internal Audit Section. Authorized in Section , Florida Statutes Section , Florida Statutes (F.S.), authorizes the Inspector General to review.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
Responsibilities of Test Facility Management, Study Director, Principal Investigator and Study Personnel G. Jacobs Belgian GLP Monitorate Zagreb, 17 December.
The International Society for Quality in Health Care (ISQua) – Guidelines.
ISO/IEC
ACCREDITATION PROCESS
Sound Financial Management
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
UNIT V QUALITY SYSTEMS.
DNV experiences and viewpoints
WHAT TO EXPECT: A CROWN CORPORATION’S GUIDE TO A SPECIAL EXAMINATION
How to conduct Effective Stage-1 Audit
ACCREDITATION PROCESS
Presentation transcript:

VERIFICATION AGENCIES WORKSHOP 5-8 September 2006 CHRISTINAH LEBALLO SANAS BEE PROGRAMME MANAGER South African National Accreditation System

BACKGROUND ON HOW R47 WAS DEVELOPED BEE VERIFICATION AGENCY ACCREDITATION UPDATE -SANAS Specialist Technical Committee (STC) tasked with finalisation of Accreditation Criteria that Verification Agencies shall comply with. -STC composed of : -Industry Body ABVA -Business BUSA -the dti -SANAS -Meets requirements of : -Balance of Interest -Impartial -Competent

1)Have had 5 meetings. 2)Comments 3)Tested the R47 document 4)Outstanding issues for STC Qualification of analysts (auditors) used by Verification Agencies STC PROGRESS

 Verification Agencies  Chambers  DTI  STC Members COMMENTS

 Statement 020 changed to clearly separate out Requirements for Approval and Requirements for Accreditation  Minister approves against Statements 020  SANAS accredits against detailed document R 47 but Statement 020 gives General requirements for Accreditation and gives mandate to accredit.  The Minister uses Accreditation as input into decision to Approve  Criteria for approval are (defined in Statement 020) :  Member of Industry body  Be a superior contributor  Be accredited ACCREDITATION CRITERIA STATEMENT 020 & R47

ASSESSMENT AND APPROVAL PROCESS 1. SANAS RECEIVES AN APPLICATION AND DOCUMENTATION SANAS RECOMMENDS TEMPORARY APPROVAL TO THE MINISTER 2. SANAS PRE-ASSESS THE VERIFICATION AGENCY SANAS INFORMS THE MINISTER ABOUT THE OUTCOME 3. SANAS ACCREDIT THE VERIFICATION AGENCY SANAS INFORMS THE MINISTER SANAS ISSUE THE ACCREDITATION CERTIFICATE THE VERIFICATION AGENCY APPLY TO THE MINISTER FOR APPROVAL INCLUDING THE ACCREDITATION CERTIFICATE

Temporary approval does NOT imply accreditation. BEE TEMPORARY APPROVAL

THANK YOU

SANAS R ACCREDITATION OF BEE VERIFICATION AGENCIES WORKSHOP Sean MacCurtain

6.THE ROLE OF BEE VERIFICAYION AGENCIES 6.1 Assess, verify and validated BEE Information for decision making ◙ Verify both disclosed and undisclosed BEE-related information ◙ Verification should be based on principles contained in BBBEE Codes of Good Practice as well as relevant gazetted industry charters

6.THE ROLE OF BEE VERIFICAYION AGENCIES (Cont.) 6.2 Evaluate BEE transactions and scenarios ◙ Verification Agencies may include indicative BEE scores based on the Scenario presented

7. The Accreditation Role Of SANAS on behalf of the DTI ◙ Accredit BEE Verification Agencies in terms of accreditation criteria (R47) ◙ The DTI to evaluate the BEE status of the Verification Agencies

8. RESPONSIBILITIES OF BEE VERIFICATION AGENCIES ◙ Comply with R47 ◙ Be a Superior Contributor to BEE ◙ Be a member of the Industry Body ◙ Verify according to the Codes

9. TEMPORARY APPROVAL TO OPERATE AS A BEE VERIFICATION AGENCY FOR NEW OR EMERGING VERIFICATION AGENCIES ◙ Pre-assessment before approval ◙ SANAS shall make recommendation to the Minister ◙ Granted by the Minister of DTI and lasts for 180 days

10. PRINCIPLES General Aim: To give confidence to all parties that rely upon verification ◙ Impartiality ◙ Competence ◙ Responsibility ◙ Openness ◙ Confidentiality ◙ Resolution of Complaints

QUESTIONS ◙

11. REQUIREMENTS General requirements A Verification Agency shall: ◙ Internally display a Positive commitment to all seven elements ◙ be legal enterprise ◙ not have equity share or voting rights in the entity to be rated ◙ not be a party to a debt-creating agreement between itself and the entity ◙ have a legally enforceable agreement ◙ retain authority and shall be responsible for its decision relating to the BEE verification

11. REQUIREMENTS (Cont.) General requirements A Verification Agency within a month of being accredited shall: ◙ Evaluate and document the significant risk from its verification activities. ◙ evaluate its finances and sources of income.

12.MANAGEMENT SYSTEM REQUIREMENTS FOR VERIFICATION AGENCIES The Verification Agency Shall: ◙ establish, implement and maintain a management system ◙ document policies, systems, programmes, procedures and instructions ◙ communicate the system documentation ◙ ensure that system documents are understood, implemented and are available to personnel

13. Example of Document Structure. Policy Manual Procedures Forms Records

13. STRUCTURAL REQUIREMENTS 13.1 Structure and Top Management of BEE Verification Agency The Verification Agency Shall: ◙ identify top management ◙ document its organisational structure and the structure shall include reporting lines ◙ have formal rules for appointment, terms of reference of any committees

13. STRUCTURAL REQUIREMENTS (Cont.) 13.2 Safeguarding of impartiality ◙ Composition, terms of reference, duties, authorities and responsibilities of committees shall be documented and authorised by top management

14. HUMAN RESOURCE REQUIREMENTS 14.1 Competence of management and personnel ◙ Processes to ensure up-to-date knowledge relevant to verification criteria ◙ Determine competence required ◙ Defined processes for selecting, training formally authorising and monitoring verification analysts

14 HUMAN RESOURCE REQUIREMENTS (Cont.) 14.2 Personnel involved in the verification process ◙ Competent ◙ Sufficient number of verifying analysts and verification managers

14.4 PERSONEL RECORDS ◙ Records of qualification ◙ Training ◙ Experience ◙ Competence ◙ Job description ◙ Contract

14.5 OUTSOURCING ◙ Process that describes the conditions under which outsourcing may take place ◙ Procedure for monitoring outsourced bodies ◙ Records of outsourced bodies ◙ Decision making shall never be outsourced

14.6MANAGEMENT OF IMPARTIALITY Policy Manual ◙ Publicly available statement about understanding the importance of impartiality ◙ Document the possibilities for conflicts of interest. Organisation Structure ◙ Document relationships Outsourcing ◙ Activities of other related bodies do not affect the confidentiality, objectivity and impartiality

14.6 MANAGEMENT OF IMPARTIALITY (Cont.) Organisation and Personnel ◙ A minimum period of two years need to elapse following the end of consultancy ◙ Commercial and Financial pressures ◙ Both internal and external personnel to declare any situation known to them that may present conflict of interest

15.INFORMATION REQUIREMENTS ◙ Information about activities ◙ Information about BEE status granted ◙ Information about validity of a given BEE score ◙ Information to the dti about the status level of measured entity

16. DOCUMENT CONTROL ◙ Procedure to control documents ◙ Distribution of documents and availability of documents at all locations where operations are performed. ◙ Periodic Review ◙ Obsolete documents ◙ Review and approval by authorised personnel to issue ◙ Master list with current revisions ◙ Amendments by hand procedure ◙ Procedure on changes to documents maintained in computerised systems

16.5 BEE VERIFICATION CERTIFICATES ◙ Minimum requirements ◙ Effective date. ◙ Overall BEE status and status level of each of the seven elements

16.5 BEE VERIFICATION CERTIFICATES (Cont.) 16.6 Directory of verified entities ◙ Maintenance making the directory available to the DTI 16.7 Reference to verification and use of marks ◙ Policy on governing any mark authorised for use by verified entities. ◙ a procedure detailing on how to make references to verification status to avoid: misleading statements Bringing the Verification Agency into disrepute

CONFIDENTIALITY ◙ Policy on confidentiality to the information obtained during the performance of verification ◙ Information about verified entity, not made publicly available shall be regarded as confidential ◙ Information about the verified entity from other sources shall be treated as confidential ◙ Verification Agency must have facilities that shall ensure the secure handling of confidential information ◙ Before making confidential information available to other bodies, the Verification Agency must inform the verified entity.

18. INFORMATION EXCHANGE BETWEEN A BEE VERIFICATION AGENCY AND ITS CLIENTS 18.1 Information on the verification process and requirements ◙ Update of the verification process and summary of verification process ◙ Information about fees ◙ The BEE Verification Agency ‘s verification requirements ◙ Necessary arrangements for the conduct of verifications

18. INFORMATION EXCHANGE BETWEEN A BEE VERIFICATION AGENCY AND ITS CLIENTS (Cont.) 18.1 Information on the verification process and requirements ◙ Documents describing the rights and duties of clients ◙ The resolution of complaints and appeals

19. PROCESS REQUIREMENTS 19.1 Verification Methodology ◙ Verify, evaluate and validate based on BEE Codes of Good Practice ◙ On site verification not telephonic verification ◙ Validation of computer spreadsheet and protection of data

19. PROCESS REQUIREMENTS 19.2 General Requirements applicable to verification evaluations ◙ Have a process for selecting and appointing VA analysts/teams ◙ Formal rules/contractual conditions that include impartiality ◙ Verification plan and dates of verification ◙ Procedure on determining time needed and size of the team and expertise required

19. PROCESS REQUIREMENTS (Cont.) 19.2 General Requirements applicable to verification evaluations ◙ The BEE Verification Agency to provide names, background information about each member of the team to the client well in advance ◙ Multi-site sampling

19. PROCESS REQUIREMENTS (Cont.) 19.3 Verification Request for BEE verification The BEE Verification shall require: ◙ an authorised representative of an entity that requested verification ◙ Name and address(es) of its physical location(s) ◙ Its functions and relationships within a larger corporation

19. PROCESS REQUIREMENTS (Cont.) 19.3 Verification Request for BEE verification The BEE Verification shall require: ◙ general information such as its activities, human and other resources ◙ Information concerning the entity’s use of consultancy relating to BEE

19. PROCESS REQUIREMENTS (Cont.) 19.3 Verification Review of request for a BEE verification The BEE Verification shall conduct a review of the request for verification to ensure that: ◙ information submitted is sufficient ◙ requirements are clearly defined ◙ differences are resolved ◙ it has resources and time required to complete the verification ◙ there is a written agreement

19. PROCESS REQUIREMENTS (Cont.) 19.3 Verification Review of request for a BEE verification The BEE Verification shall conduct a review of the request for verification to ensure that: ◙ there is a written agreement The Verification Agency shall notify the entity that requested a BEE verification when accepting or not accepting the request.

19. PROCESS REQUIREMENTS (Cont.) Verifications ◙ verifications are to be done according to plan ◙ verifications shall take place on site ◙ verification team shall collect sufficient evidence ◙ verification team shall interview a sufficient number of staff ◙ verification team shall provide a detailed written report soon after verification

19. PROCESS REQUIREMENTS (Cont.) 19.4 Special evaluations ◙ short notice verifications to investigate complaints ◙ verifications shall take place on site ◙ client shall be notified of the visit ◙ additional care shall be taken in choosing the team (conflict of interest)

20. APPEALS ◙ procedure on receiving, evaluating and making decisions on appeals ◙ verification Agency is responsible for all decisions at all levels of the appeal-handling process ◙ Appellant shall be notified of the outcome

21. COMPLAINTS ◙ procedure on receiving, evaluating and making decisions on complaints ◙ verification Agency is responsible for all decisions at all levels of the complaint-handling process ◙ complainant shall be notified of the progress and outcome

22. RECORDS ON BEE VERIFIED CLIENTS ◙ Records to be maintained are records on internal audits, Management reviews, personnel, verification process for all verified entities and entities that submitted requests for verification. ◙ facilities shall ensure confidentiality ◙ Verification Agency shall have a policy and procedure on retention of records

23. INTERNAL AUDIT (VERIFICATION PROCESS/SYSTEM) ◙ Policy and procedure on internal audits ◙ Periodic internal audits ◙ Predetermined schedule ◙ To be carried out by trained and qualified personnel ◙ Non-conformances/ audit findings clearance ◙ Audit records must identify activity audited and findings ◙ Follow-up audits to verify implementation

24. CORRECTIVE ACTION ◙ Policy and procedure on corrective actions ◙ process start with investigation – root cause analysis ◙ Select and implement appropriate corrective action ◙ Monitor effectiveness ◙ Extra/unplanned audits

25. MANAGEMENT REVIEW ◙ Policy and procedure on management reviews ◙ Top Management’s responsibility ◙ Periodic and with predetermined schedule ◙ the management review shall take account of: review of objectives the suitability of policies and procedures the outcome of recent internal audits appeals and complaints corrective actions assessment by external bodies changes in the volume of work staff training ◙ Actions and findings shall be recorded and be carried out within appropriate and agreed time lines

QUESTIONS ◙