TECHNOLOGIES AUTOMATED METERING. Proprietary Information Of Energy 2013 MACDILL AFB METERING DOD Implementation Guidance – MAJCOM Energy Mangers shall.

Slides:



Advertisements
Similar presentations
Requirements Based Evaluation of BPL for Power System Sensing, Command and Control Applications Erich W. Gunther EnerNex Corporation
Advertisements

Condition Monitoring Roles in Asset Reliability and Regulatory Compliance Dave Haerle, Los Angeles Department of Water and Power Scott Kunze, DataSplice.
RiT PatchView Solution
Mining Solutions Energy Efficiency Solutions. Challenges to the Mining Industry Need to increase profits and reduce environmental impact Important to.
Advanced Meters for FS Facilities Smart Meters vs Advanced Meters.
SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department.
NEMA. 2 Utility Metering vs. Submetering 10/11/2014 New PowerPoint Template Utility Meter Meter provided by utility with the purpose of measuring.
DOE O 430.2B Metering Requirements and Status
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
UCAIug HAN SRS v2.0 Summary August 12, Scope of HAN SRS in the NIST conceptual model.
Interoperability of Meter Data Collection and Management Systems
Vendor Briefing May 26, 2006 AMI Overview & Communications TCM.
Who is NEMA? NEMA is the association of electrical equipment and medical imaging manufacturers, founded in 1926 and headquartered in Arlington, Virginia.
Program Name or Ancillary Texteere.energy.gov June 16, 2011 Soudeh Motamedi IBM Contractor, DOE Sustainability Performance Office Year-End Sustainability.
Manufacturing Productivity Solutions Management Metrics for Lean Manufacturing Companies Total Productive Maintenance (T.P.M.) Overall Equipment Effectivity.
The Bottom Line In Energy Cost Reduction Energy Automation Systems, Inc. EASI.
E-Mon Energy™ Energy Monitoring Software
Make the most of your energy Looking for accurate electric energy metering and simple, easy installation? PowerLogic ® Energy Meter December 2008 Energy.
Simple, accurate tenant sub-metering
1. 2 Jamie Caplan Square D by Schneider Electric Energy Solutions – Northwest Tel:
GENFLEX TARIFF AND INCOPORATION OF THE MEC INTO THE NMD RULES
SmartMeter Program Overview Jana Corey Director, Energy Information Network Pacific Gas & Electric Company.
GE Consumer & Industrial Multilin PMCS Energy Management Systems Vincent Thomas.
Payment Card Industry (PCI) Data Security Standard
A Partial Interim Report To WMS Guidance on Implementing Protocol Implementation Plan (PIP) 102 Reactive Power Task Force.
MCTS Guide to Microsoft Windows Server 2008 Network Infrastructure Configuration Chapter 11 Managing and Monitoring a Windows Server 2008 Network.
Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation,
Advanced Metering Infrastructure
Des Murphy Kovara Energy Consultants Establish a Measuring and Monitoring System Energy MAP Step 18 K O V A R A Energy Consultants.
Technology I Sub-Metering 101. Proprietary Information Of Energy 2013 Submetering 101 What Federal Facility Managers Need To Know Presented by Steve Kearney.
The Business Case for Metering Mitchell Stein, Quadlogic.
Solutions for Meter Data Management Layne Nelson Product Manager LODESTAR Corporation Copyright © 2005 LODESTAR Corporation - All Rights Reserved LODESTAR.
Database Auditing Models Dr. Gabriel. 2 Auditing Overview Audit examines: documentation that reflects (from business or individuals); actions, practices,
12/10/14 Advanced Metering Infrastructure Smart Grid Boot Camp IIT Delhi Oct 12, 2014 bindoo srivastava.
1 Department of Water and Power City of Los Angeles Automatic Meter Infrastructure Program Mariko Marianes and John Yu.
Today’s Enterprise Energy Management Systems: What to look for…. Mark A. Noyes CEO and President Cambridge, Massachusetts.
PowerLogic® E5600 power and energy meter 1.
The Right Choice for Call Recording OAISYS and PCI DSS Compliance Managing Payment Card Industry Compliance with OAISYS Call Recording Solutions.
Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.
Green Button Initiative GREEN BUTTON DOWNLOAD MY DATA CERTIFICATION DRY RUN Marty Burns, John Teeter for NIST, Kay Clinard UCAIug.
Hands-On Microsoft Windows Server 2008
Facility Smart Grid Information Model
What is Ubiquity™? ubiquity (noun): the state of being, or seeming to be, everywhere at once Ubiquity™ is a powerful building management system that.
Need to enhance your network?
Security Professional Services. Security Assessments Vulnerability Assessment IT Security Assessment Firewall Migration Custom Professional Security Services.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
OUC’s EV Roadmap Near Term Planning Activities Develop a flexible framework and visionary roadmap Collect actionable information Business models Charging.
PowerLogic® PowerView Software
Phoenix Convention Center Phoenix, Arizona Metering Guidance & Best Practice Integrated EnergyMetering Strategies Saralyn Bunch Federal Energy Management.
Advanced Controls and Sensors David G. Hansen. Advanced Controls and Sensors Planning Process.
CEC 08-DR-1 Efficiency Committee Workshop 3/3/08.
Tier 2 Power Supply Planning Workshop Advanced AMI Benefits Overview.
Enabling Results: Monitoring and Evaluation in the U.S. ENERGY STAR Program September 28, 2012Ashley M. King Environment Officer.
Make the most of your energy December 2008 HDM Accurate measurement and electrical utility cost allocation for multi-tenants PowerLogic ® High Density.
Proficy Workflow for Water reduce. improve. secure.
BLUEPILLAR.COM /COMPANY/BLUE-PILLAR /BLUEPILLARINC CONFIDENTIAL & PROPRIETARY Unique solutions to connect and control legacy energy equipment for the purpose.
Case study municipality. 2 Contents Introduction The way Results Conclusion.
Metering Americas April 24, 2006 Advanced Metering.
Monitoreo y Administración de Infraestructura Fisica (DCIM). StruxureWare for Data Centers 2.0 Arturo Maqueo Business Development Data Centers LAM.
Community Solar Farm And Smart Metering Projects Community Solar Farm And Smart Metering Projects.
US Army Corps of Engineers BUILDING STRONG ® Capital Investment Strategy (CIS) to Achieve Total Netzero Energy, Waste, and Water Porscha Porter USACE Engineering.
Proficy Workflow for Small/Medium Utilities Wholesale Power Cost Calculations Use Case.
Irvine Ranch Water District Distributed Energy Storage Case Study
Module 10: Managing and Monitoring Network Access
Advance Metering Infrastructure (AMI) system awareness Training
PM9, PM9P and PM9C Power Meter
Simple, accurate tenant sub-metering
Power monitoring software
Presentation transcript:

TECHNOLOGIES AUTOMATED METERING

Proprietary Information Of Energy 2013 MACDILL AFB METERING DOD Implementation Guidance – MAJCOM Energy Mangers shall plan for meters within the “fence line” – Generally assumes sub-meters in buildings is not cost effective 94% of fence line energy now metered at building level and documented by support group

Proprietary Information Of Energy Categories – Required by Congressional Mandates EPAct2005, EIASA07 – Required to meet Reqs of DoDs Utilities Meter Policy. – Other meters not required by mandate/policy, but deemed appropriate by Base MAJCOM for reimbursements (dictated by Civil Engineering Resources at MacDill) MACDILL AFB METERING

Proprietary Information Of Energy 2013 DOD Policy to install advanced meters Electricity: – Capture a minimum of 60% of electricity use – Goal of 85% electricity use by end FY20 – Energy intensive bldgs. should be sub-metered to identify use by major systems 94% of electricity usage captured at usage level at this time MACDILL AFB METERING

Proprietary Information Of Energy 2013 Natural Gas – Capture a minimum of 60% of natural gas use – Goal of 85% natural gas use by end FY20 Privatized at MacDill with data sharing agreement 98%+ metered at building level at this time MACDILL AFB METERING

Proprietary Information Of Energy 2013 Potable and Non-Potable Water – Install advanced meters by FY20 on all water-intensive facilities, IE: Chiller plants Dorms Galleys Dining facilities Swimming Pools Gyms Golf Courses Piers Vehicle Wash Stations Hospitals Irrigation Privatized at MacDill MACDILL AFB METERING

Proprietary Information Of Energy 2013 Privatized Utilities – Partner with system owners to share existing meter data or negotiate acceptable terms of cost sharing – Each Installation shall have the capability to monitor energy and water use through: Shadow Advanced Meter Data sharing agreement. Data sharing agreements in place with all partners MACDILL AFB METERING

Proprietary Information Of Energy 2013 Meter Data Management – Advanced meters at minimum measure and record regular interval use and communicate data with automatic metering system (AMS). – AMS must automatically and reliably collect and analyze regular interval data from meters. – Meters that can’t connect should store data internally for manual incorporation into an AMS – ION 8600 meters meet or exceed all the above requirements MACDILL AFB METERING

Proprietary Information Of Energy 2013 Advanced Meter Specs – 15 minute interval data with 30 days memory – LED or LCD display with wireless communication capability – Panel mounted/“Plug and Play” – Optical Port – Max data functionality; peak, power factor, kVAR, harmonics ION 8600 meters meet or exceed all requirements MACDILL AFB METERING

Proprietary Information Of Energy 2013 Meter Data MacDill – All data logged within Automated Metering servers – Alarms set on key parameters (peak demand, over amperage, harmonics and over/under voltage) – Graphical and tabular interval data reports made available to concerned parties in the event of anomalies – Cost reporting available on each advanced metered facility down to 15-minute interval detail – All consumption, costs and billing maintained in master Excel workbook to provide direct audit trail from metered data to bill generation in CE Resources MACDILL AFB METERING

Proprietary Information Of Energy 2013 Maximization of impact of meter investments – Ensure meters provide only necessary capability for targeted facility – Meter should measure harmonics, power factors, reactive power only when necessary – Contract for meter installation Currently over 150 advanced meters installed and reporting to automated servers ~150 advanced meters, or meter communications remain to be installed MACDILL AFB METERING

Proprietary Information Of Energy 2013 Installation Cost reduction – Major cost attributed to wired network infrastructure. – Costs can be reduced if components certify and accredit wireless configurations in accordance with guidelines. – MacDill system is 100% wireless communication – Many meters installed within large infrastructure projects MACDILL AFB METERING

Proprietary Information Of Energy 2013 MACDILL AFB METERING

Proprietary Information Of Energy 2013 Wireless Guidelines – Information Assurance Advanced Meters and AMS must maintain compliance with DODs Information Assurance/Cyber Security 8500 series of directives Must comply with Committee for National Security Systems Instruction 1253 standard overlay, Appendix K Components can leverage the certification and accreditation work performed by others through Reciprocity as outlined in memorandum dated July 23, 2009, thereby reducing the time and cost of certification. Comply with ETL 11-1, Civil Engineering Industrial Control System (ICS) information assurance compliance. – 3eti radio equipment in place has 128-bit encryption and maintains compliance with DoD Information Assurance/Cyber Security 8500 directives and instructions – Equipment reviewed by SATCOM, USSOCOM and DISA locally on base MACDILL AFB METERING

Proprietary Information Of Energy 2013 PRIMARY METERING PowerLogic ION8600 SEL Model 735 MACDILL AFB METERING

Proprietary Information Of Energy 2013 SUB-METERING Power Logic PM820 Power Logic E5600 MACDILL AFB METERING

Proprietary Information Of Energy 2013 MACDILL AFB METERING

Proprietary Information Of Energy 2013 MACDILL AFB METERING

Proprietary Information Of Energy 2013 MACDILL AFB METERING

Proprietary Information Of Energy 2013 MACDILL AFB METERING

Proprietary Information Of Energy 2013 FY03 Baseline: 108,000 MACDILL AFB METERING

Proprietary Information Of Energy 2013 MACDILL AFB METERING

Proprietary Information Of Energy 2013 MACDILL AFB METERING