Development of the Lower Snake River Compensation Plan: A Brief History Scott Marshall LSRCP Program Administrator U.S. Fish & Wildlife Service.

Slides:



Advertisements
Similar presentations
UMATILLA HATCHERY MONITORING AND EVALUATION PROJECT Richard Carmichael, Wes Stonecypher, Gerold Grant, and Will Cameron Project # Oregon Department.
Advertisements

Grande Ronde Supplementation Lostine River: Operation and Maintenance and Monitoring and Evaluation Sponsor: Nez Perce Tribe Project Number:
Evaluate recreational and commercial mark-selective fisheries. (35018) Geraldine Vander Haegen, WDFW Charmane Ashbrook, WDFW Chris Peery, U. Idaho Annette.
Develop Local Okanogan Steelhead Brood Stock Proposal # Sponsored By: Colville Confederated Tribes Presented By: Stephen Smith.
Annual Stock Assessment – Coded Wire Tag Program (ODFW & WDFW) BPA Project Numbers: and
Fish and Wildlife Losses and Hydroelectric System Responsibility January 2004.
SELECT AREA FISHERY EVALUATION BPA Project # CEDC, ODFW, WDFW.
Assessment of A-run Steelhead population in the Clearwater Nez Perce Tribe Department of Fisheries Resources Management.
UMATILLA RIVER FISH PASSAGE OPERATIONS
Funding Monitoring in 2006 – the Programs role in a West Coast Partnership November 16, 2005.
Imnaha River Smolt Survival and Smolt to Adult Return Rate Quantification (Imnaha River Smolt Monitoring Program) BPA Project Number Nez Perce.
Lower Snake River Compensation Plan Hatchery Evaluations – Salmon River Project No Nez Perce Tribe Department of Fisheries Resources Management.
Future of Our Salmon Conference Portland, OR Oct 17, 2012 Why Artificial Propagation? Why Artificial Propagation? Gary James, Confederated Tribes of the.
Overview of Current Production Programs Across the Columbia River Basin.
NWHA- Panel Discussion “Spawning Better Ideas for Fish Passage”
Crystal Springs Hatchery Facilities
FCRPS BIOPHatchery BIOP Program HGMP’s ESA coverage New Hatchery Reform Actions Program Description & Assessment Selection of Projects for New HSRG/HRT/HGMP.
PIT Technology and Hatchery Mitigation J. Murauskas and J. Miller 0 Use of PIT technology to improve hatchery mitigation in the Columbia Presented by Josh.
Federal Concerns Regarding Hatchery Steelhead Spawning in the Wild NOAA Fisheries Salmon Recovery Division.
Lower Snake River Fish & Wildlife Compensation Plan Scott Marshall LSRCP Program Manager US Fish & Wildlife Service.
Coordination of Tag and Mark Recovery Programs Dan Rawding WDFW.
Tucannon Endemic Steelhead – An Integrated Program picture.
Using CWT’s to assess survival, ocean distribution and maturation for Chinook stocks across the Pacific Northwest: Are there any predictive capabilities.
Implementation of the Biological Opinion for Russian River Water Supply, Flood Control Operations & Channel Maintenance National Marine Fisheries Service.
Overview  Modeling to date: –Distribution of mortality –Achieving improvements with specific actions  Building scenarios  Dealing with uncertainty –
MANAGEMENT AND RESEARCH OF KALAMA RIVER STEELHEAD WASHINGTON DEPARTMENT OF FISH AND WILDLIFE KALAMA RESEARCH TEAM PAT HULETT CAMERON SHARPE CHRIS WAGEMANN.
COLUMBIA RIVER SALMON AND STEELHEAD RETURNS FPAC and TMT – March 2013 Presented by: Washington Department of Fish and Wildlife.
Variation in Straying Patterns and Rates of Snake River Hatchery Steelhead Stocks in the Deschutes River Basin, Oregon Richard W. Carmichael and Tim Hoffnagle.
The Northwest Power Act: The Spokane Tribe’s Perspective.
Proposed Approach for Developing Columbia Basin Salmon and Steelhead Goals June 3, 2015.
2014 Program Goal Statements for Salmon and Steelhead Overview Nancy Leonard, Laura Robinson and Patty O’Toole (NPCC)
BUILDING STRONG SM 1 Columbia River Salmon and Federal Columbia River Power System Rock Peters Senior Program Manager.
Monitor and Evaluate Salmonid Production in the Asotin Creek Subbasin - LSRCP (ID #200116)
May 10, 2012 Presented by Micki Varney Oregon Department of Fish and Wildlife.
Washington State Steelhead Status Review PACIFIC COAST STEELHEAD MEETING JON ANDERSON WASHINGTON DEPARTMENT OF FISH & WILDLIFE MARCH 9-11, 2010.
Life History of Western Washington Winter Steelhead, a 30 Year Perspective Hal Michael Washington Department of Fish and Wildlife
Pacific Coast Steelhead Management Meeting What Are Managers Required to Provide Their Constituents? March 9-11, 2004 Bob Leland.
Management Strategies for Columbia River Recreational and Commercial Fisheries and Beyond Oregon and Washington Staff Options for Initial Analysis.
The Restoration of the River What Happens After the Dams Are Out?
Management & Recovery Implications Of Wild/Hatchery Steelhead Interactions Within A Large, Complex Watershed Research Partners: WDFW Skagit River System.
Imnaha River Summer Steelhead Hatchery Program Review R. W. Carmichael, L. R. Clarke, M. Flesher, D. Eddy, S. Warren, and H. Stanton Oregon Department.
Fiscal Year 2004 April 10, FY 2002FY 2003FY 2004 EnactedBudgetBudget COLUMBIA RIVER BASIN: Army Corps of Engineers Bureau of Land.
Lower Snake River Comp Plan M & E Program SPY’s thoughts based on 3 weeks.
Washington’s Lower Snake River Compensation Plan Steelhead Program – A retrospective and program adaptive management overview Mark Schuck and Joe Bumgarner.
Status of Columbia River salmon and links to flow: What we do and do not know Presentation to Northwest Power Planning Council December 11, 2002
Effectiveness of alternative broodstock, rearing and release practices at Winthrop NFH William Gale and Matt Cooper -USFWS, Mid-Columbia River Fishery.
Washington State Steelhead Stock Status Review PACIFIC COAST STEELHEAD MEETING AMILEE WILSON WASHINGTON DEPARTMENT OF FISH & WILDLIFE MARCH 2004.
The influence of variable marine survival on fishery management objectives for wild steelhead Dan Rawding & Charlie Cochran.
Joe Bumgarner Washington Department of Fish and Wildlife.
Estuary Actions for Salmon and Steelhead Columbia River Estuary Science Policy Exchange September 10-11, 2009 NOAA 2008 FCRPS Biological Opinion Estuary.
Ocean rivers SARs LGR-LGR SARs LGR-LGR Harvest Mouth of Columbia predicted returns Mouth of Columbia predicted returns Juvenile travel time and survival.
Should Fish PM&E Compliance = Success?. Skagit Project History  Relicensed 1995  18 Years of PM&E Implementation  30 Year License remains in effect.
LSRCP Hatchery Steelhead Salmon River Brian Leth and Carl Stiefel LSRCP Steelhead Program Review July 20-21, 2012 Clarkston,WA.
Northwest Power Planning Council Fish and Energy Impacts Resulting from Reductions in Summer Bypass Spill July 16, 2003.
Performance of a New Steelhead Line Derived from Hatchery Parents Collected in Autumn in the Grande Ronde River Lance Clarke, Michael Flesher, Shelby Warren,
Upstream passage success rates and straying of returning adults Presenter: Jack Tuomikoski CSS Annual Meeting Apr 2 nd 2010.
COLUMBIA RIVER SALMON CUMULATIVE IMPACTS EXAMPLE.
Salmon and Steelhead Conservation through adaptive management of water levels in the Jenner estuary NOAA’S National Marine Fisheries Service.
Payette MPG Sockeye Adult Tributary Juvenile Data Tributary Data
Northwest Fisheries Science Center Technical Management Team
MPG Spring-Summer Chinook
Resident Fish Substitution Guidelines
Snake River MPG Fall Chinook Adult Tributary Juvenile Data Tributary
The Reintroduction of Late-Run Winter Steelhead into the Upper North Fork Lewis River, Washington, using F1 Wild Broodstock Hatchery Adults.
Comparative Survival Study Project #
Steelhead status in Idaho – 2012 Update
Steelhead stock status in Idaho 2008 update
Steelhead status in Idaho 2010 update
Steelhead status in Idaho 2010 update
Eagle Fish Genetics Lab (IDFG): Craig Steele Mike Ackerman
Presentation transcript:

Development of the Lower Snake River Compensation Plan: A Brief History Scott Marshall LSRCP Program Administrator U.S. Fish & Wildlife Service

Purpose of the LSRCP To provide the number of salmon and steelhead needed in the Snake River system to help maintain commercial and sport fisheries for anadromous species on a sustaining basis in the Columbia River and Ocean (NMFS & FWS 1972)

LSRCP Steelhead Goal Escapement prior to construction estimated to be 114,800. Loss based on 15% mortality of smolts at each dam for a total mortality of 48%. Estimated number lost adults in escapement = 55,100. This established adult return goal back to project area. Other than broodstock for hatcheries, no other use of returning fish identified.

Fishery Mitigation Impacts Assumed a 2:1 catch to escapement ratio. 2 x 55,100 = 110,200 lost harvest. 34 % of lost harvest to commercial fisheries, primarily in mainstem Columbia = 37, % of lost harvest to sport fisheries = 73, ,00 angler days of effort in the Project Area.

Hatchery Development Plan Desire to replace lost steelhead back to the watersheds where loss occurred.

Hatchery Production Assumptions

The Hatcheries & Satellite Facilities

Funding 1975: COE Report - Operations & maintenance funded through future appropriations. 1977: COE, FWS & NMFS sign agreement that FWS will administer the program. COE determined 100% of benefits are assigned to generating electric power. BPA, as marketer of power, must reimburse treasury for all costs, including construction. 2001: FWS & BPA agree to a direct funding agreement that sets stage for new partnership.

Decades of Dynamic Change Assumptions used to size program not realized & flow of benefits has shifted. Survival rate of smolts less than assumed. ESA listing of steelhead has resulted in curtailment of fisheries & higher percent of returning adults to & above project area. U.S. vs. OR Management Plan & ESA has diversified programs in response to conservation concerns for wild stocks.