P802.16q to Sponsor Ballot: Conditional Approval Request 17 July 2014 IEEE 802.16-14-0065-00-Gdoc.

Slides:



Advertisements
Similar presentations
Page 1Version 2.1 Request for conditional approval Information required to support request for conditional approval to forward a draft standard IEEE 802.
Advertisements

Doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 1 IEEE 802 EC Interim Telecon – Feb Date: Authors:
Doc.: Submission1 IEEE Motions in July Plenary DCN: Title: Request for Sponsor Ballot Approval for IEEE a.
Doc.: IEEE /0144r01 Submission February 2015 Apurva N. Mody, BAE SystemsSlide 1 IEEE Motion at the February EC Telecon IEEE P Wireless.
Doc.: IEEE /0792r0 Submission July 2008 Adrian Stephens, Intel CorporationSlide TGn Editor Report July 2008 Date: Authors:
Doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 1 July 2009 Plenary Presentation from WG11 to 802 EC Date: Authors:
Doc.: IEEE /1187r0 Submission September 2015 Slide 1 IEEE ah Closing Report for September 2015 Date: Authors: Yongho Seok and.
Doc.: IEEE /0023r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 IEEE Motion at the July EC Closing Meeting IEEE P Wireless RANs.
Month Year IEEE Motions in July, 2016 Plenary
Month Year IEEE Motions in July, 2017 Plenary
November 2008 doc.: IEEE /1437r1 July 2011
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
IEEE P Motions at the November 2011 Plenary EC Closing Meeting
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
IEEE P Motions at the November 2011 Plenary EC Closing Meeting
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
IEEE P Motions at the July Plenary EC Meeting
P802.11aa Report to EC on Conditional Approval to go to Sponsor Ballot
John D’Ambrosia Recording Secretary, IEEE 802 LMSC
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot
d 100G to Sponsor Ballot (unconditional)
P802.16Rev4 to Sponsor Ballot: Conditional Approval Request
Working Group March Plenary EC Closing Motions Package
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG3f RevCom request support package.
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
Steve Shellhammer Chair
Motions and Supporting Material for EC Meeting Agenda Items
IEEE Motions at the November Plenary EC Meeting
November Plenary Closing Report
IEEE Motions in July Plenary DCN:
November Plenary EC Closing Motions Package
July Plenary Opening Report
IEEE Motion at the February EC Telecon
November 2010 doc.: IEEE /0872r4 November 2010
November Plenary Opening Report
Month Year IEEE Motions in July Plenary DCN:
2013 March Plenary Closing Report
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
Closing IEEE 802 EC Friday 15th March 2019
July Plenary Closing Report
IEEE Motion at the July EC Closing Meeting
Closing IEEE 802 EC Friday 15th March 2019
Closing IEEE 802 EC Friday 15th March 2019
IEEE Motion at the February EC Telecon
IEEE MEDIA INDEPENDENT HANDOVER
November 2010 doc.: IEEE /0800r9 November 2010
IEEE P Working Group for Wireless Personal Area Networks
November 2008 doc.: IEEE /1437r1 August 2010
Submission Title: [REVCOM Submission Information]
July Motions EC Meeting July 29, 2016 Manchester Grand Hyatt San Diego, CA, USA Bob Heile, Wi-SUN Alliance.
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
TGn Editor Report Sept 2008 Date: Authors:
Motion via Ballot IEEE motion Motion for Approval to Start the Sponsor Ballot for IEEE P Revision Draft 5.0 Motion via Ballot.
Motion via Ballot Motion for Approval to Start the Sponsor Ballot for IEEE P Revision Draft 5.0 Motion via Ballot Motion Start: May.
IEEE MEDIA INDEPENDENT HANDOVER
November 2010 doc.: IEEE /0800r9 November 2011
P b to RevCom: Conditional Approval Request
November 11, 2010 Dallas, Tx Session #70
Sheung Li Task Group J Chairperson March 19, 2004
P802.16Rev4 to Sponsor Ballot: Conditional Approval Request
P802.11j Sponsor Ballot Procedure 10
Recording Secretary, IEEE 802 LMSC
IEEE P SC-Maintenance Closing Report
Presentation transcript:

P802.16q to Sponsor Ballot: Conditional Approval Request 17 July 2014 IEEE Gdoc

PAR and CSD PAR: CSD: PAR Title: IEEE Standard for Air Interface for Broadband Wireless Access Systems – Amendment for Multi-tier Networks PAR Approval Date:

General Conditions: OM (v14) Clause 12 Conditional approval is only appropriate when ballot resolution efforts have been substantially completed and the approval ratio is sufficient. "Substantially complete" is when there is a very low likelihood of receiving valid new Disapprove comment(s)/vote(s) upon the next recirculation ballot.

Rules: OM (v14) Clause 12 motions requesting conditional approval to forward when the prior ballot has closed shall be accompanied by: Date the ballot closed Vote tally including Approve, Disapprove and Abstain votes Comments that support the remaining disapprove votes and WG responses Schedule for recirculation ballot and resolution meeting

Date the ballot closed Stage Open Close WG Letter Ballot #39 2 Apr9 July 2014

Vote tally including Approve, Disapprove and Abstain votes 7 Approve (100%) 0 Disapprove 0 Abstain Return ratio requirement met (78%)

Comment resolution Disapprove comment status Working Group Letter Ballot #39 all 66 comments addressed, July 2014 sole Disapprove voter flipped vote to approve as a result Comments that support the remaining disapprove votes and WG responses none

Schedule for recirculation ballot and resolution meeting Sponsor Ballot Group formation is completed – 69 members July 30 – Updated draft D2 available Aug 1 – 15 day WGLB Recirculation a Aug 26 – Comment Resolution Teleconference Sep day WGLB Recirculation b Sep 23 – Comment Resolution Teleconference Sep 26 to Oct 26 – 30 day Sponsor Ballot Nov 3 – IEEE WG Session #94

WG Motion Closing Plenary: Motion: “To request Conditional Approval from the EC to forward the P802.16q draft to Sponsor Ballot” Approved 5-0-0

LMSC Motion To grant conditional approval, per Clause 12 of the IEEE 802 Operations Manual, to forward P802.16q for Sponsor Ballot Moved: Seconded: Approve: Disapprove: Abstain: