Middle Fork Project AQ 12 – Special-Status Amphibian and Aquatic Reptiles Technical Study Plan Report Overview March 10, 2008.

Slides:



Advertisements
Similar presentations
Evaluate Spawning of Fall Chinook and Chum Salmon Just Below the Four Lowermost Columbia River Mainstem Dams Project PNNL.
Advertisements

Assessing effects of Columbia River Basin anadromous fish flow management on the aquatic ecology of the Henrys Fork watershed A Proposal By The Henrys.
1 Placer County Water Agency Middle Fork American River Project AQ 3 – Aquatic Mollusk Technical Study Report – 2008 March 3, 2009.
Middle Fork American River Project AQ 2 – Fish Population Technical Study Report Overview March 3, 2009.
Middle Fork Project AQ 6 – Fish Passage Technical Study February 3, 2009.
Yakama Nation Pacific Lamprey Recovery Project Core Data And Monitoring Framework.
Step 1: Valley Segment Classification Our first step will be to assign environmental parameters to stream valley segments using a series of GIS tools developed.
Clearwater River Habitat/Bioassessment
Development of a Comprehensive Wildlife Conservation Strategy for Georgia Georgia Department of Natural Resources Wildlife Resources Division.
Lec 12: Rapid Bioassessment Protocols (RBP’s)
HABITAT SUITABILITY CRITERIA FOR THE FOOTHILL YELLOW-LEGGED FROG (RANA BOYLII) IN THE NORTHERN SIERRA NEVADA AND COAST RANGE OF CALIFORNIA I. Background.
Suzanne Macey.  DEC looks at known occurrences with 1 mile  FWS looks at known occurrences plus the potential for suitable habitat  Contact DEC and/or.
Placer County Water Agency Middle Fork American River Project Placer County Water Agency Middle Fork American River Project Approach for Developing New.
Placer County Water Agency Middle Fork American River Project (FERC No. 2079) Recreation Technical Working Group Meeting July 21, 2008.
Temperature and Flow Dynamics of the Klamath River Technical Memorandum 7 Leon Basdekas Mike Deas Watercourse Engineering, Inc nd Street, Suite B.
Placer County Water Agency Middle Fork American River Project Placer County Water Agency Middle Fork American River Project Plenary Meeting January 6,
Middle Fork Project AQ 12 – Special-Status Amphibian and Aquatic Reptiles Technical Study Plan Report Overview March 10, 2008.
EEP Watershed Planning Overview August 12, Ecosystem Enhancement Program Nationally recognized, innovative, non-regulatory program formed in July.
Sea turtles of the UAE: Status and Conservation Options
U.S. Department of the Interior U.S. Geological Survey Mapping River Habitat at Different Flows in the Big Bend Reach of the Rio Grande A Project in Support.
Lower Saluda River Instream Flow Study TWC Study Team Workshop December 11, 2007.
July Middle Fork Project Additional Information Potential Project Betterments to be evaluated during Relicensing July 2006.
Placer County Water Agency Middle Fork American River Project Terrestrial Working Group November 6, 2007 TERR 4: Special-Status Wildlife Preliminary Results.
Terrestrial Resources Working Group June 3, 2008.
2012 Instream Flow Study Agency Meeting on 2012 Draft Study Descriptions January 24,
Middle Fork Project AQ 12 - Attachment A California Red-legged Frog Site Assessment March 10, 2008.
Middle Fork Project Flow and Temperature Modeling (Status Report) November 4, 2008.
Jensen, et. al Winter distribution of blue crab Callinectes sapidus in Chesapeake Bay: application and cross- validation of a two- stage generalized.
Understanding Instream Flow Incremental Methodology (IFIM) Joey Kleiner.
Membership Need to clarify members and determine who has authority to vote on group decisions.
1 Placer County Water Agency Middle Fork American River Project (FERC No. 2079) Recreation Technical Working Group Meeting February 19, 2008.
Welcome to Xeneca’s Final Public Information Centre for the Ivanhoe River: The Chutes Project Today’s PIC will give you the opportunity to learn more about.
Claytor Lake Debris Study. Hydro Environmental Services of Kleinschmidt Associates  Shoreline Management Plans (SMP)  Aquatic & Terrestrial Habitat.
Placer County Water Agency Middle Fork American River Project (FERC No. 2079) Recreation Technical Working Group Meeting April 8, 2008.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Technical Meeting May 16, 2007, 1-4 pm Red Lion Redding, CA.
Peabody Coal Lower Basin Pipeline Engineering Appraisal Study Bureau of Reclamation September 18, 2002.
Summary Overview Primary Headwater Habitat Assessment.
Aquatic Resources Assessment Study Claytor Hydroelectric Project FERC No. 739.
HYDROELECTRIC POWER AND FERC. HYDRO 101A ”Water Runs Down Hill”
John Lake – Marine Biologist RIDFW-Marine Fisheries Section 3 Ft. Wetherill Road Jamestown, RI Young-of-the-Year Survey in RI.
Placer County Water Agency Middle Fork American River Project Plenary Meeting June 1, 2009 Handout #2.
Estimated Cost for Appendix K Compliance Biological Surveys Marie Campbell President, Sapphos Environmental, Inc. December 15, 2011.
Placer County Water Agency Middle Fork American River Project Plenary Meeting January 4, 2010 Handout #3.
Habitat Mapping of High Level Indicators at Multiple Scales for Fish and Wildlife.
Middle Fork Project TERR 6 - Special-Status Bat Technical Study Plan Report Overview March 3, 2008.
Preliminary Scoping Effort. Presentation Objectives Identify need for additional sources of future funding Provide background on how elements were identified.
Progress Report Snake River Measurement Technical Committee Presented by Sean Vincent March 12, 2012.
Nehalem River Basin: Technical Assistance for Watershed Data Synthesis, Restoration, and Outreach Priorities 4/16/2008.
PCWA Study Plan Physical Habitat Characterization Study Plan –Geomorphology Study Plan –Riparian Habitat Mapping Study Plan –Aquatic Habitat Characterization.
Vernal Pool Certification. Wetlands types of wetlands swamps marshes bogs vernal pools importance of wetlands flood control water purification biological.
Iowa Rivers Information System Inventory, Modeling, and Evaluation of Basin, In-Stream Habitat, and Fishery Resource Relationships Kevin Kane, Iowa State.
Middle Fork Project AQ 3 – Macroinvertebrate and Aquatic Mollusk Technical Study Report Overview May 5, 2008.
A 9-year Trend of Striped Bass Spawning in the Upper Coosa River Basin Bill Davin Berry College Mount Berry, Georgia.
Middle Fork Project AQ 11 – Water Quality Contingency Sampling Protocol (Contingency Study) September 8, 2008.
 Integrated Modelling of Habitat and Species Occurrence Dynamics.
1 Placer County Water Agency Middle Fork American River Project Terrestrial Working Group November 6, 2007 TERR 1: Vegetation Communities and Wildlife.
Cottonwood’s Proposed Site-Specific Selenium Standards in the Cherry Creek Basin Comments Presented by: Cherry Creek Basin Water Quality Authority Regulation.
The effects of climate change on the grasshoppers of the southern Rocky Mountains of Colorado.
Yolo Bypass Salmonid Habitat Restoration & Fish Passage Environmental Impact Statement Environmental Impact Report Information Presentation to YBFEPT July.
Middle Fork American River Project Recreation Resources Technical Working Group Meeting October 5, 2009.
Placer County Water Agency Middle Fork American River Project Plenary Meeting February 2, 2009 Handout #5.
Conference talk was presented at: Urban Wildlife Ecology and Management: An International Symposium on Urban Wildlife and the Environment University of.
Habitat suitability and availability for rainbow trout Oncorhynchus mykiss in the Canyon Reservoir tailrace Greg Cummings.
An Assessment of Hydrologic Variability on
Mallard (Anas platyrhynchos L
Middle Fork Project AQ 11 – Water Quality Technical Study Plan Report Overview March 10, 2008.
Middle Fork Project Overview of 2008 Technical Study Plan Implementation April 21, 2008.
Study Update Tailrace Slough Use by Anadromous Salmonids
Vernal Pool Certification
Scour Analysis on the west fork of the Duchesne River
Presentation transcript:

Middle Fork Project AQ 12 – Special-Status Amphibian and Aquatic Reptiles Technical Study Plan Report Overview March 10, 2008

1 Study Objectives Identify and map potential habitat for CRLF and FYLF in the study area. Identify and map potential habitat for CRLF and FYLF in the study area. Document the distribution and abundance of CRLF populations in the study area, as required by USFWS. Document the distribution and abundance of CRLF populations in the study area, as required by USFWS. Document the distribution and abundance of FYLF populations in the study area. Document the distribution and abundance of FYLF populations in the study area. Document the timing and length of FYLF breeding season. Document the timing and length of FYLF breeding season. Identify existing data and obtain new data necessary to develop habitat suitability criteria (HSC) for FYLF. Identify existing data and obtain new data necessary to develop habitat suitability criteria (HSC) for FYLF. Characterize the water stage, velocity, and temperature of various flow regimes as it relates to FYLF habitat through coordination with the instream flow and water temperature studies. Characterize the water stage, velocity, and temperature of various flow regimes as it relates to FYLF habitat through coordination with the instream flow and water temperature studies.

2 Study Objectives Document the presence of potential WPT nesting habitat near Project reservoirs and potential Project betterment inundation zones. Document the presence of potential WPT nesting habitat near Project reservoirs and potential Project betterment inundation zones. Document the presence of WPT during CRLF and FYLF surveys. Document the presence of WPT during CRLF and FYLF surveys.

3 AQ 12 – Special-Status Amphibian and Aquatic Reptile Study Objectives and Related Study Elements and Reports CRLF Study Objectives Identify and map potential habitat and document the distribution and abundance of populations in the study area, as required by U.S. Fish and Wildlife Service (USFWS). Conduct USFWS protocol-level site assessment Conduct a field reconnaissance survey Document 2007 findings in a Site Assessment Report included in this Amphibian Report Consult with Aquatic Technical Working Group (TWG) & USFWS Determine if protocol-level surveys are needed. Complete 2008 CRLF surveys in areas requested by USFWS, if needed Document 2008 Results in Amphibian Report (2009) FYLF Study Objectives Identify and map potential habitat and document the distribution and abundance of populations in the study area. Document the timing and length of breeding season. Develop habitat suitability criteria (HSC). Characterize the water stage, velocity, and temperature of various flow regimes as it relates to habitat through coordination with instream flow and water temperature studies. WPT Study Objectives Document the presence of potential nesting habitat near Project reservoirs and potential Project betterment inundation zones and document presence during amphibian surveys. Conduct 2007 Field Surveys Identify and map known occurrences within one mile of the study area Develop and GIS map of potential habitat around reservoirs and rivers Document 2007 findings in this Amphibian Report Conduct a field reconnaissance reservoir survey of potential habitat Conduct 2007 Field Surveys Complete Habitat Characteriza tion Determine Timing and Length of Breeding Season Document 2007 findings in this Amphibian Report Consult with Aquatic TWG Determine if additional limited-scope surveys are needed (i.e. breeding timing) Complete 2008 FYLF Contingency Field Surveys, if needed Document 2008 FYLF Results in Amphibian Report (2009) Conduct Distribution & Abundance Surveys Develop Habitat Suitability Criteria Determine Stage, Velocity, and Temperature Effects of Various Flow Regimes Coordinate with AQ 1 - Instream Flow Coordinate with AQ 4 - Water Temperatures Conduct Project Effects Analysis Coordinate with AQ 1 - Instream Flow Evaluate water temperatures near potential habitat Conduct Project Effects Analysis Identify and map known occurrences within one mile of the study area

4 Special-Status Amphibian and Aquatic Reptile Study Sites

5 Potential FYLF Data Gaps and Need for Limited Scope Surveys Potential FYLF Data Gaps and Need for Limited Scope Surveys  Determine any ambiguities in the analysis of data collected in 2007 preclude meeting the study objectives (distribution and length of breeding season).  If FYLF are not found at a site during the first year of surveys, the site will be revisited or another site may be surveyed if the Aquatic TWG determines it is necessary.  Determine data to be collected and the number of times a site is revisited, if necessary. Potential Contingency Studies

6 Survey Results Foothill Yellow-legged Frog Foothill Yellow-legged Frog  Habitat Characterization  Distribution and Abundance Surveys  Timing and Length of Breeding Season  Habitat Suitability Criteria Development  Coordination to Determine Stage and Velocity Effects

7 Foothill Yellow-legged Frog Habitat Suitability

8 Foothill Yellow-legged Frog Distribution and Abundance

9 Foothill Yellow-legged Frog Breeding Season Annual Profile of Average Daily Water Temperatures at all breeding locations 2007 Breeding Season*: May 10 – June 5 *Dates inferred from observed developmental stage of eggs

10 Foothill Yellow-legged Frog Breeding Season Annual Profile of Average Daily Water Temperatures at all non-breeding locations

11 Foothill Yellow-legged Frog Breeding Season Water Temperature

12 Foothill Yellow-legged Frog Habitat Suitability Criteria - Eggmasses

13 Foothill Yellow-legged Frog Habitat Suitability Criteria - Tadpoles

14 Foothill Yellow-legged Frog Assessment of Stage & Velocity Effects Use HSC for in-stream flow modeling at: Use HSC for in-stream flow modeling at:  2 peaking reach sites (MF 4.8, MF 14.1)  2 bypass reach sites (MF 26.1, 3.5)  2 reference reach sites (NF 35.7, NFMF 2.3) (x-sect only) Eggmass validation data collected in Spring, 2008 Eggmass validation data collected in Spring, 2008

15 Western Pond Turtle 8 incidental observations 8 incidental observations  6 along MFAR below Ralston (2 hatchlings on Otter Ck)  2 on NFAR GIS Analysis of potential nesting habitat GIS Analysis of potential nesting habitat  Slope less than 15 degrees  Southern aspect  150 ft buffer  Less than 6000 ft elevation Field Reconnaissance Field Reconnaissance  Off-channel ponds within CRLF 1 mile buffer zone, but no ponds within the smaller WPT buffer zone.  Reservoir GIS habitat validation

16 Western Pond Turtle Incidental Sightings

17 Western Pond Turtle Potential Nesting Habitat

18 Western Pond Turtle Potential Nesting Habitat

19 Western Pond Turtle Potential Nesting Habitat GIS and Field Validation Analysis of Potential Habitat near Reservoirs GIS and Field Validation Analysis of Potential Habitat near Reservoirs