SHU Technology Update September 2011 Presented to the Faculty Senate IT Committee September 13, 2011
Mobile Computing 2.0 Discussion on the future of Mobile Computing kicked off Fall 2010 by TLTR Emerging Technologies Group Student survey in Spring 2011 showed high satisfaction overall with Mobile Computing Program, but that students desired additional options and to have tech fee folded into flat tuition (survey results are posted on the TLTR blog) IT and TLTR Em Tech group planned significant Tablet computing pilot project for Fall 2011 to explore use of tablet technology in teaching and learning
Mobile Computing 2.0 (cont.) IT acquired 350 ThinkPad Tablets, an Android-based and pen-enabled Tablet (similar form factor to the Apple iPad). – Distribution starting this week for faculty and select students in Business Leadership, the sciences (Biology, Chemistry, Mathematics and Physics), and University Honors Program – TLTC developing Chem Lab app for Chemistry – Acquired Android-based version of Blackboard Learn
SHU Mobile App The SHU Mobile project is intended to provide access to University resources via a variety of mobile devices First SHU Mobile app released Fall 2009 for Android, Blackberry, and iPhone. Currently implementing Sungard’s Banner Mobile Central as cross platform development env.; next version of SHU Mobile app to be released later this fall will include mobile access to Banner info
Campus Network Upgrade As campus network approached End of Life (EOL), University IT Services (UITS) launched multiyear campus network upgrade in Fall Completed: – Fall 2010: New wired switches installed in most buildings – Spring 2011: Upgraded campus Internet connection – Summer 2011: Completed installation of new wireless access points in most buildings
Campus Network Upgrade (cont.) Fall 2011: UITS will go “live” with new n network (“campus”). SSID is broadcast. Requires network authentication (SHU credentials) to access. Future Work: – Upgrade firewalls and bandwidth management systems – Replace network core switches – Replace fiber between buildings – Decommissioning SSID and most wired ports (per original plan discussed Fall 2010)
Banner Upgraded to Banner 8 in Oct 2010 Banner Workflow and Banner Enterprise Data Warehouse install scheduled for Fall 2011 Launching major enhancement to Banner reporting with install of Cognos in Fall 2011 Planning launch of Banner Recruitment and Admissions Banner Relationship Management modules in Summer 2012 Banner 9 will be Generally Available Summer 2012
“Academic Admin” Systems Starfish enhanced “early warning” system going “live” this month for Academic Affairs UITS updated the Annual Reporting DB for CEHS in Spring 2011; currently used by SSoB and CEHS IT discontinuing license for Blackboard Assessment Module effective 1/2012; funds re-allocated to license Passport assessment tool for CEHS’s NCATE accreditation
Campus Installed MS SharePoint as collaboration supplement to MS Exchange ; will be made available to University community for document repositories later in Fall 2011 For Fall 2011 Microsoft has been contracted to – Re-populate MS Live accounts for faculty, staff, and employees to eliminate “live.shu.edu” domain; this will make it easier to access MS Live services (e.g., Skydive and the MS Live collaboration tools) – Implement MS ILM for student account generation and password synchronization with SHU passwords
Campus Web and Communication Redesigned student portal layout for Fall Focus groups guiding redesign of faculty and employee layouts. Exploring improved Web tools with library for library page and portal, including federated search CommonSpot upgrade scheduled for Summer 2011 postponed to Fall awaiting critical patch from vendor University Advancement planning redesign of Web site to support new capital campaign
Campus Web and Communication (cont.) Working with PR on redesign of broadcast ; for most users broadcast will be replaced with muti-channel communications (Web, Web calendar, portal channels, and bi-weekly broadcast digests). Campus emergency notification system (Everbridge) scheduled for replacement next summer; SA is planning move to Rave Wireless
Additional Resources / Disc Documents IT News and Announcements Blog blogs.shu.edu/doit blogs.shu.edu/doit TLTR Blog blogs.shu.edu/tltr blogs.shu.edu/tltr IT Portfolio of Projects Executive Summary – Sept 2011 dl.dropbox.com/u/ /DoITProjectPortfolioEx ecSummary docx dl.dropbox.com/u/ /DoITProjectPortfolioEx ecSummary docx DoIT 2010 Annual Report lReport2010Final.pdf lReport2010Final.pdf
Questions?