GGPS Basti Malook
EMIS CODE: VILLAGE:ARIFABAD Post Office: Kot Addu UC: 02 Tehsil: Kot Addu District: Muzaffargarh Establishment 1980 Area of School15 Marlay Distance from ITA Office 02 KM
CLASS WISE ENROLLMENT BASE LINE Primary Section ECEPreOneTwoThreeFourFiveTotal Girls Boys Total
CLASS WISE ENROLLMENT CURRENT Primary Section ECEPreOneTwoThreeFourFiveTotal Girls Boys Total
CLASS WISE ENROLLMENT CHANGE/ ANALYSIS Primary Section ECEPreOneTwoThreeFourFiveTotal Girls Boys Total
STAFF DETAIL BASE LINE Teachers MetricFABA/ BScMA MSc Total Female431-8 Male----- Total431-8 Trained Teachers M EdB EdCTPTCOthersTotal Female Male Total
STAFF DETAIL CURRENT Teachers MetricFABA/ BScMA MSc Total Female Male----- Total Trained Teachers M EdB EdCTPTCOthersTotal Female Male Total
SCHOOL COUNCIL Member TeacherParentCommunityTotal Female1337 Male ---- Total1337 Description Status Date of Establishment 2008 Name of Chairman Azra Sultana Description Status Bank A/c No Bank Name/Contact # Bank of punjab
FacilitiesNumbersWorkingNeeds Repair Primary Classrooms 33 3 Class room Doors 33 No Class room Windows Class room Ventilators No Black Board 55 No Soft Board No Student Chairs Nil Student Desk / Benches 50 No Teachers Tables 4 4No Teachers Chairs 88 4 Head Teacher Table 111 Head Teachers Chair 11 No Side Rack/Racks etc No Visitor Chair 55No
FacilitiesNumbersWorkingNeeds Repair Computers Nil -- Computer Tables Nil- - Computer Chairs Nil -- Wooden Almirah Nil- - Cupboard Nil -- Iron Safe 11No Ceiling / Pedestal Fans 5 32 Tube lights 3 33 Bulbs Nil-- Washrooms 2No2 Playground Equipment Nil Reading Materials / Library Nil Medical Facilities / First Aid Box Nil Sports Material Nil
FacilitiesYes/NoWorking Needs Repair Main Gateyes Main School BoardNo Boundary Wall Yesyes Whitewash/Paint No Telephone No Electricity yes Drinking Water yes Playground yes Internet No
FacilitiesNumbersWorkingNeeds Repair Primary Classrooms 44 No Class room Doors 44No Class room Windows 17 No Class room Ventilators No Black Board 66 No Soft Board 11No Student Chairs 30 No Student Desk / Benches 50 No Teachers Tables 55 No Teachers Chairs 10 No Head Teacher Table 11No Head Teachers Chair 11No Side Rack/Racks etc No Visitor Chair 55 No
FacilitiesNumbersWorkingNeeds Repair Computers Nil Computer Tables Nil Computer Chairs Nil Wooden Almirah Nil Cupboard Nil Iron Safe 22No Ceiling / Pedestal Fans 9 9No Tube lights 54 1 Bulbs Nil Washrooms 22 2 Playground Equipment Nil Reading Materials / Library yes No Medical Facilities / First Aid Box yes No Sports Material yes No
FacilitiesYes/NoWorking Needs Repair Main Gateyes No Main School Boardyes No Boundary Wall Yes yesNo Whitewash/Paint yes No Telephone No Electricity yes Drinking Water yes Playground yes Internet No
SUMMARY OF INTERVENTIONS 1 new room constructed 2 toilet block constructed Repair work of school 10 students desks 10 students benches 2 teacher table 2 teacher chair Health kit (First aid box) Reading kit Sports kit Science kit ECE furniture (30 chairs,5 tables) Trainings Globe Map Health checklist Para teacher Literacy camp class Sweaters Sports material Art material
READING KIT ACTIVITY
HEALTH KIT ACTIVITY
ECE KIT
SCIENCE KIT
SPORTS KIT
POST CONSTRUCTION
IMPACT OF PROJECT Increase in Enrollment Improved the environment of School Capacity building Of SC Awareness of education Learning Level improved
FUTURE PLAN Up gradation of school More Improvement of learning level of the students Hundred % attendance Enrollment increase Control On Drop Out
Thanks