Skeleton: Hardware Alignment for EMU meeting James N Bellinger 15-Mar-2009.

Slides:



Advertisements
Similar presentations
1 James N. Bellinger 4-Feb-2009 ME+1 status and Endcap Z James N. Bellinger University of Wisconsin at Madison 4-Feb-2009.
Advertisements

Kaori Maeshima (FNAL), Muon Alignment EDR: FEB. 28, Endcap Alignment EMU Alignment DAQ Muon Alignment EDR Feb. 28, 2002 Outline: 1.Components to.
1 CMS Tracker Alignment and Implications for Physics Performance Nhan Tran Johns Hopkins University CMS Collaboration SPLIT
US CMS DOE/NSF Review: May 8-10, Endcap Alignment Dick Loveless DOE/NSF Review 9 May 2001.
GE alignment- status, proposal N. Béni, Z.Szillási (ATOMKI, Debrecen, HU) G. Bencze, G. Endrőczi (Wigner RCP, Budapest, HU) GMM meeting 1.
Muon Endcap Alignment Analog Sensor Calibrations & Software Update Samir Guragain, Marcus Hohlmann Florida Tech October 2005 USCMS EMU meeting – Fermilab,
Goal : Setup and monitor “chambers” with resolution of  < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line (2 Laser Redundancy) 1 Transfer.
First Reconstruction Results on the Alignment of Muon Endcap Chambers in the CMS Experiment at CERN S. Guragain, G. Baksay, M. Hohlmann Florida Tech 74.
Partial Disassembly of the alignment devices on each ME11transfer plate, ME1/1 chamber and ME1/2 chamber. (6 on +Z and 6 on –Z side of the CMS)
Alignment Software from the ME perspective Marcus Hohlmann Florida Tech Muon Alignment meeting during CMS week - CERN, March 15, 2005.
1 James N. Bellinger University of Wisconsin-Madison 27-November-2009 Status of Transfer Line Reconstruction James N. Bellinger 27-November-2009.
1 MuonGeoModel status report focus on issues relevant to , 20 Access to Condition DB with M. Verducci, R. Harrington MDT deformations with I. Logashenco.
Сессия Ученого Совета ОФВЭ 25 декабря 2008 Проект CMS в 2008 В.В.Сулимов.
Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, Endcap Alignment Status of Offline Software Alignment CERN 17, 18 May 2001.
November 11 SESAPS 2006 Samir Guragain 1 Calibration, Installation & Commissioning of Sensors for the Alignment of Muon Endcap Chambers in the CMS Experiment.
Muon Barrel Geometry Studies Luca Scodellaro Muon Barrel Workshop July 6 th, 2010.
1 DT Local Reconstruction on CRAFT data Plots for approval CMS- Run meeting, 26/6/09 U.Gasparini, INFN & Univ.Padova on behalf of DT community [ n.b.:
Chamber Alignment Pins Δy = y PG – y nom. vs. Δx = x PG – x nom. M. Hohlmann 1, G. Baksay 1, S. Guragain 1, J. Bellinger 2, D. Carlsmith 2, F. Feyzi 2,
1 James N. Bellinger University of Wisconsin-Madison 2-February-2011 Status and Plans for Endcap Hardware Alignment James N. Bellinger 2-February-2011.
Samir Guragain, Marcus Hohlmann Florida Institute of Technology, Melbourne, FL Z′ Mass Reach MC Analysis USCMS meeting Brown University May 6 – 8, 2010.
1 James N. Bellinger University of Wisconsin-Madison 13 February 2008 Cocoa Plans.
1 James N. Bellinger University of Wisconsin-Madison 13-August-2010 Endcap Processing Notes James N. Bellinger 13-Aug-2010.
TeV muons: from data handling to new physics phenomena Vladimir Palichik JINR, Dubna NEC’2009 Varna, September 07-14, 2009.
EMU Meeting, CERN, Sept 18-19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field up.
1 James N. Bellinger University of Wisconsin-Madison 15-March-2009 Hardware Alignment.
CMS Cathode Strip Chambers Performance with LHC Data Vladimir Palichik JINR, Dubna NEC’2013 Varna, September 10,
Muon Reconstruction and Vertex Constraint Giovanni Abbiendi Bologna CMS meeting, 20 November 2007.
1 James N. Bellinger University of Wisconsin-Madison 19-Feb-2010 Status of Transfer Line Reconstruction James N. Bellinger 19-February-2010.
James Bellinger, December CMS Week Muon Alignment James N. Bellinger University of Wisconsin at Madison 5-December-2006 DCOPS Data from MTCC2.
Approved Plots from CRAFT
Jan 2016 Solar Lunar Data.
Muon Alignment: Organization
EMU Alignment DAQ Endcap Alignment Muon Alignment EDR Feb. 28, 2002
Project timeline # 3 Step # 3 is about x, y and z # 2
Average Monthly Temperature and Rainfall
University of Wisconsin-Madison
Status of Transfer Line Reconstruction University of Wisconsin-Madison
Status and Plans for Endcap Hardware Alignment
Transfer Line and CSC Rφ Reconstruction
Status of Transfer Line Reconstruction University of Wisconsin-Madison
University of Wisconsin-Madison

Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Validating Transfer Line Fit University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
Comparing Laser Fit to Barrel Fit University of Wisconsin-Madison
University of Wisconsin-Madison
Status of Transfer Line Reconstruction University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
University of Wisconsin-Madison
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
CMS Week Muon Alignment
University of Wisconsin at Madison
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
University of Wisconsin-Madison

Presentation transcript:

Skeleton: Hardware Alignment for EMU meeting James N Bellinger 15-Mar-2009

Things to add Time estimates for repeating the work in May (and August) Time estimates for work TBD: –Transfer Lines –Barrel –Barrel to Endcap Pix from Barrel progress Stuff I’ve forgotten in the skeleton

What we Have Now Link on Plus side Some Link on Minus (serious disk misalignment!) Link to MABs Z for ME+2,3,4, ME-2,3,4, ME+1/2 Z for ME+1/3 about to be blessed Some barrel numbers

Want pix of Marcus’ chamber tilts, updated w/ ME+1/3 –Check Illustrative barrel Z variation w/ field Fit plots for ME+1 –Check Fit plots for ME+2 –Check

5 Muon Endcap Hardware Alignment Preliminary z global r global CMS Side view             Nominal CSC position              x = 0 Nominal CSC position Not to scale     Pink: Aligned by Tracker-Muon Link system Blue: Aligned by Muon Endcap Optical System Red: Not aligned yet  x = 0 : 3.9mrad ME+1/3,2/2,3/2: Δz:- 5 mm to IP globally : mm : mm   nom. : mm   x > 1.3mrad : 5.94 mm  : mm : mm : mm : mm : mm : mm : 3.7mrad : 3.4mrad : 3.9mrad : 4.7mrad : 3.6mrad : 4.2mrad : 3.4mrad : 3.4mrad : 3.5mrad nom. : 4.4mrad : 4.4mrad ← Muon Endcap stations → ME+1 ME+2ME+3ME+4ME-1ME-2ME-4ME-3 ME-1/3,2/2,3/2: Δz:+ 5 mm to IP globally : -2.2 mm Green: Not blessed yet

ME+2 SLM 2-5 in Z with 10 measurements at B=0T

Laser hits on CCDs ME+2 SLM 2-5 in Z at B=0T

Chamber surface estimates Red=Real Green=Sim MAB ASPD ME12 ASPD ASPD P4 Distancemeter and dists IR target DCOPS dowels Animated

In the pipeline 1.Some X/Y information for ME+/- separately 2.Barrel muon 3.ME-1 4.Refit Endcap using relative X/Y info from step 1 5.Proof of principle linking MAB with Endcaps via Transfer Lines

Hardware-dependant Minus side Link –Disks so badly assembled that components couldn’t talk to each other! MAB DCOPS X/Y End-to-end X/Y –Better care assembling disks –Requires some adjusting of the lasers

Order of Tasks for Endcap Independent validation of data quality in all detectors Stand-alone reconstruction of SLMs and Transfer Lines When Link results are available: Big Bang

Close CMS Bi weekly MWGR weekly MWGR CRUZET S w & w/o tracker CRAFTS Adjust LD- LHC dev. collisions DT StandAlone  align Alignment Work Plan Alignment Work Plan Mar Apr May Jun Jul Aug Sep Oct Nov Dec Barrel HW Geom Endcap HW Geom Full B=3.8T AR vs. TK survey+tracks  r correction CSC align w/cosmics DT align with collision tracks CSC align with collision tracks Full Barrel HW B=3.8T Full Endcap HW B=3.8T Integrated HW 3.8T Integrated HW + track-based Geom Full Link 0T Full Barrel HW 0T Full Endcap HW 0T Integrated HW 0T DT align with CRAFT2 cosmics CSC align with CRAFT2 cosmics

Time Estimates IFF –the disks were assembled with reasonable accuracy AND –there were no major hardware failures THEN repeating the work with fresh data in May should be quick—order of a week or two (?) Doing it again in August should be very much easier

But Some tasks will be done for the first time in May: Transfer Line inclusion, for example.