P roblem S olving I nnovator Solving Tomorrows Problems Today Potential Causes of a Problem can be Arranged into Independent Groups and each Group can.

Slides:



Advertisements
Similar presentations
Quality control tools
Advertisements

Agenda For Today! School Improvement Harris Poll Data PDSA PLC
Agenda For Today! Professional Learning Communities (Self Audit) Professional Learning Communities (Self Audit) School Improvement Snapshot School Improvement.
P roblem S olving I nnovator Solving Tomorrows Problems Today The 1 st Why can be formed once the Team has Brainstormed for Potential Causes The 1 st.
P roblem S olving I nnovator Solving Tomorrows Problems Today Electronic Brainstorm Database Electronic Brainstorm Database Brainstorming stimulates new.
P roblem S olving I nnovator Solving Tomorrows Problems Today 4 th Why / Root Cause Cause & Effect (Fishbone) 4 th Why / Root Cause Cause & Effect (Fishbone)
P roblem S olving I nnovator Solving Tomorrows Problems Today Primary function is to identify and organize possible causes of a specific effect and then.
P roblem S olving I nnovator Solving Tomorrows Problems Today To prevent any potential defects reaching the customer, define and implement containment.
P roblem S olving I nnovator Team problem solving in a production Environment.
P roblem S olving I nnovator Solving Tomorrows Problems Today Overview of how the 5 why automatically generates an FMEA & Control Plans 5 Why - FMEA Relationship.
P roblem S olving I nnovator Solving Tomorrows Problems Today Manual Prioritisation of 1 st Why / Functions. Manual Prioritisation of 1 st Why / Functions.
Affinity Diagrams.
P roblem S olving I nnovator Solving Tomorrows Problems Today 3 rd Why / Failure Effect Development 3 rd Why / Failure Effect Development 3 rd Why / Failure.
once the Team has Completed the 4th Why
P roblem S olving I nnovator Solving Tomorrows Problems Today Warnings Clear All prepares the PSI for the next problem. Clearing of D1-D3.
P roblem S olving I nnovator Solving Tomorrows Problems Today Potential Failure Mode DBS & Chart Root Cause DBS Reviewing/Updating the Databases and Analysing.
P roblem S olving I nnovator Solving Tomorrows Problems Today Identify the need and reason for the PSI. Clearly document the Opportunity Description Identify.
P roblem S olving I nnovator Solving Tomorrows Problems Today 2 nd Why/Voting Techniques Automatic Ranking 2 nd Why/Voting Techniques Automatic Ranking.
P roblem S olving I nnovator Solving Tomorrows Problems Today 1 st Why / Function Pareto Chart 1 st Why / Function Pareto Chart Overview of Percentage.
P roblem S olving I nnovator Solving Tomorrows Problems Today 2 nd Why / Requirements Cause & Effect (Fishbone) 2 nd Why / Requirements Cause & Effect.
P roblem S olving I nnovator Solving Tomorrows Problems Today Potential Benefit Description Force Field Analysis will identify the viability of Recommended.
P roblem S olving I nnovator Solving Tomorrows Problems Today The Team should Accept the PSI Innovation and develop the Team Structure & Logistics The.
ROOT CAUSE ANALYSIS. Outlines What is root causes analysis RCA RCA history RCA importance basic elements of RCA.
Problem Solving Tools Prepared by Steven Schafer, September 16, 2009.
PHD Performance Management Program Matt Gilman Spencer Soderlind Brieshon D’Agostini October 19, 2011 PDCA Training Series 2 DO 1.
QUALITY TOOLS Affinity Diagram. Why? To organize “chaotic” collections of ideas, e.g. from a brainstorming or session. Serves to unify group opinion.
Failure Mode & Effect Analysis Tom Hannan & Kevin Kowalis Eastern Illinois University School of Technology Total Quality Systems INT 5133 (FMEA)
SIMS 213: User Interface Design & Development Marti Hearst Tues, Feb 26, 2002.
Popcorn Sample PFMEA: Process Flow
Session 6 Page 11 ECE361 Engineering Practice Brainstorming, Trades and the Design Process.
TSM: Safety Management in a Quality Management Setting
TODAY IN ALGEBRA 2.0…  Learning Target: Review Ch.6 concepts  Whiteboard practice: Solving with square roots  Review HW #7  Independent Practice.
P roblem S olving I nnovator Solving Tomorrows Problems Today Once the Problem Profile is determined, the Process Control can be implemented correctly.
KEYS 2.0 TRAINING PART THREE Training Module 4 Using Quality Tools for Data Collection And Analysis.
Lean Supply Chain Action Learning Program September 2007.
P roblem S olving I nnovator Solving Tomorrows Problems Today Problem / Improvement Confirmation Problem / Improvement Confirmation Management should.
8D Report provides a summary of the PSI
P roblem S olving I nnovator Solving Tomorrows Problems Today The Fault Tree will automatically be generated once the Team has Completed the 5 th Why.
Design for Engineering
P roblem S olving I nnovator Solving Tomorrows Problems Today Databases for Improvements Prevention/ Lessons Learned Prevention/ Lessons Learned Potential.
P roblem S olving I nnovator Solving Tomorrows Problems Today Before beginning, establish the parameters of the opportunity. Do this by completing the.
Quality Control Tools A committee for developing QC tools affiliated with JUSE was set up in April Their aim was to develop QC techniques for.
1 Software Quality Engineering CS410 Class 5 Seven Basic Quality Tools.
P roblem S olving I nnovator Solving Tomorrows Problems Today Current Situation Prevention / Detection Current Situation Prevention / Detection Analyzing.
Brazil Assessment You work for a Japanese car manufacturer. Your company has decided to build a new car assembly plant in Brazil. They have not decided.
OHTO -99 SOFTWARE ENGINEERING LECTURE 5 Today: - An overview to OO Analysis and OO Design - Introduction of Assignment 2.
Chapter 11 Using Visual Notetaking Systems. Copyright © Houghton Mifflin Company. All rights reserved Metacognition Metacognition is the process.
MIS 673: Database Analysis and Design u Objectives: u Know how to analyze an environment and draw its semantic data model u Understand data analysis and.
P roblem S olving I nnovator Solving Tomorrows Problems Today Analysis to minimize all future negative unforeseen effects of stated PSI subject Risk Analysis.
Flowcharting A Quality Improvement Tool. Quality = Inspection Statistical methods assisted in prevention of defects – The need for inspection declined.
Solving Quadratic Equations – Comparing and Contrasting Methods April 21, 2015.
National 5 Biology Assignment
Traditional Economic Model of Quality of Conformance
Data Collection & Analysis ETI 6134 Dr. Karla Moore.
MANUFACTURING TECHNOLOGY UNIT 8. MANUFACTURING TECHNOLOGY Developing and using devices, systems, and processes to convert raw materials into products.
P roblem S olving I nnovator Solving Tomorrows Problems Today Saving with a Backup insures that the work that has been done in the PSI can be recovered.
P roblem S olving I nnovator Solving Tomorrows Problems Today Actions taken refers to the actual action taken as described in the FMEA Prevention & Detection.
1 Analyze : Fishbone diagram. 2 Cause-effect diagram - A tool for analyzing process dispersion. It is also referred to as the "Ishikawa diagram," because.
Version Corrective and Preventive Action
PRINCIPLES OF MANAGEMENT – DDPQ2532 INTRODUCTION.
Algorithms and Problem Solving
Management & Planning Tools
Failure mode and effect analysis
Quality Function Deployment
Learning Today is KEY to Leading Tomorrow
Functions Introduction.
Designing an Intervention
Designing an Intervention
Failure Mode & Effect Analysis
CAPA, Root Cause Analysis, and Risk Management
Presentation transcript:

P roblem S olving I nnovator Solving Tomorrows Problems Today Potential Causes of a Problem can be Arranged into Independent Groups and each Group can be Assigned a Logical Name 1st Why; Concept 1st Why; Concept 1st Why; FMEA & Cause & Effect 1st Why; FMEA & Cause & Effect Building the Affinity Diagram Building the Affinity Diagram Database for the Affinity Diagram Database for the Affinity Diagram Logical Distribution of 5M Database Logical Distribution of 5M Database

The Brainstormed Data Base of Potential Causes can be sorted or re-arranged into Logical Independent Groups 1 st Why Concept Appropriate Names can be given to Groups of Potential Causes which naturally belong to each other. PSI 365 promotes the use of Sorting the Potential Causes into - Five - Groups. The Group Names can, as applicable to the nature of the Problem, be achieved in several ways. Names can be taken.. from the Process Flow, correlating to the FMEA. from the traditional 5M. if an Assembly ……. could be taken from the Assembly Components. or can be taken from any combination or derivative which effectively identifies ……. Groups of Potential Causes ….. for further analysis. 1 st Why One 1 st Why Two 1 st Why Three 1 st Why Four 1 st Why Five

1st Why; FMEA & Cause & Effect Groups are automatically Correlated to the FMEA & The Cause & Effect Diagram RAW MATERIAL MACHINING TAPPING ASSEMBLY/TESTDESIGN/APPLICATION The 1 st Whys Groups relate to the Process Steps of the Process Flow Chart and the Functions of the FMEA. In some situations the Design of the Product may also have a specific influence over the Manufacturability The Skeleton of a Cause & Effect Diagram will now be available

The Affinity Diagram begins to be built with the Potential Causes determined during the Comparative (Is/Is Not) Analysis. Building the Affinity Diagram The Team may be of the opinion that a particular 1 st Why is likely to host the Root Cause. The Team may be correct, however looking at the Brainstormed Potential Causes may uncover other Potential Causes.

RAW MATERIAL MACHINING TAPPING ASSEMBLY/TEST DESIGN/APPLICATION Continue to build the groups … COPY the applicable Potential Causes from the traditional 5M Brainstorming, into the Affinity Diagram. Continue to build the Groups by… Copying the applicable Potential Causes from one group to another or by Typing directly into the Group. Logical Distribution of 5M Database

Potential causes can be added at any time Database for the Affinity Diagram Continue to build the groups … PSI retains the Brainstorming database along with unused ideas for future reference.

P roblem S olving I nnovator Solving Tomorrows Problems Today This completes the D4 Affinity Diagram Now start the D4 Paired Comparison