On-line Sorting Technology for CCA-Treated Wood. Funding Received from Sarasota County through the Florida Department of Environmental Protection Innovative.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

PROJECT MANAGEMENT PROJECT MANAGER ENGINEERING MANAGER PROCUREMENT MANAGER CONSTRUCTION MANAGER.
Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial.
Summary of Conceptual Design Site 3 Causeway Landfill Culvert Stabilization Marine Corps Recruit Depot Parris Island (CTO JM38) 19 August 2014.
1.040/1.401 Project Management Spring 2007 Lecture 7 Dr. SangHyun Lee Department of Civil and Environmental Engineering Massachusetts Institute.
Petroleum Equipment Institute
Design C a s t i n g E r e c t i o n F i n a l S t r u c t u r e D e s i g n C o n s t r u c t i o n P r o c e s s P r e–c a s t C o n c r e t e 3D M o.
IWTP Facility. Holes Drilled for Detailed Blast Drilling and Blasting for final grade prior to construction in 2011.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
ET-493 Senior Design By: Brian Toomer Advisor: Mr. Rode’
Project Startup Hmwk Due 10/11/ # 1,3,7,8 8.9 #1 9.7 #1,3,4,5, #1,2,3,4,10.
Grant Writing Diane S. Kukich, MA Dept. of Civil & Environmental Engineering University of Delaware October 25, 2005.
ESTIMATING By Laith Jacob.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
CIVL 202 Construction Engineering I Tutorial 1 T1Mon11:00-11:50 T2Wed09:00-09:50.
IOWA STATE UNIVERSITY Department of Civil, Construction and Environmental Engineering Cost Estimate for Different Wind Turbine Technologies Bin Cai Wind.
LIBS Detector System Design & Preliminary Testing David Hahn, Tom Moskal, Ken Iida Department of Mechanical Engineering University of Florida July 9, 2001.
NCSX NCSX DCT Project Meeting Raki Slide 1 Electrical Power Systems (WBS 4) S. Ramakrishnan NCSX PROJECT – D TO C Site DC Transmission PROJECT MANAGEMENT.
CAPITAL COST ESTIMATES INSTALLED EQUIPMENT COSTS.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
THE DESIGN PROCESS. General Design Process Need –Determine functional requirements… Specification –Identify essential problems […] –Search for … solution.
Company LOGO Introduction To An Example Project Prepared by: Alaa El Shorafa Munther Abdel-Hadi Ahmed El Zinati Shukri El Zaza Dr. Kamaleen Sha’th Supervision.
Chapter 15 Construction Scheduling. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
Prepared by: Gary Jacobi Extent of CCA Treated Wood in Consumer Mulches and Methods of Detection.
Supplemental Study for Year 3 Project Completed. Reason for Supplemental Study  Accelerate new lines of research which were identified in August 1999.
1 CV4902- Construction Methods Dr David Chew. 2 Construction Considerations Site layout plan Outline of entire construction process Details of temporary.
Jim Filbin Aggregates1 Jim Filbin Aggregates Facility No. 40-AA-0041 CIWMB Hearing Panel April 5, 2006 Located at 4398 Santa Fe Road, San Luis Obispo (APN.
On-line Sorting Technologies for CCA Treated Wood July 24, 2001.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
STRUCTURAL ENGINEERING. What Does a Structural Engineer Do?
Sorting Technologies for CCA Treated Wood. Objective To design and implement an automated system to effectively sort CCA treated wood from other wood.
Cumberland Park CCB Project Virginia Department of Environmental Quality October 9, 2007.
Sorting Technologies for CCA Treated Wood. Objective To design and implement an automated system to effectively sort CCA treated wood from other wood.
Fundamentals of Structural Detailing
E GNV Orange County Solid Waste Management Facility Southern Expansion Site Project.
1 Item Th25c Applicant SeaWorld San Diego Project Description Renovate existing guest entrance area to an existing theme park to include construction.
History of Research Project on CCA-Treated Wood Presented October 22, 2004 TAG Meeting.
On-line Sorting Technologies for CCA Treated Wood Sarasota Team Meeting February 27, 2001.
On-line Sorting Technologies for CCA Treated Wood July 9, 2001.
Augmented Sorting of Recovered Wood Waste Using Stain and X-Ray Technologies Recently Awarded by the FDEP Innovative Recycling Grants Program to the Town.
On-line Sorting Technologies for CCA Treated Wood Sarasota Team Meeting June 5, 2001.
Construction Unit 5, Lesson 3 Explanation Presentation © 2011 International Technology and Engineering Educators Association, STEM  Center for Teaching.
April 5, 2005 PPD Informal FLARE Review T. Lackowski 1 FLARE Conventional Civil Construction.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
Long-Baseline Neutrino Facility LBNF Far Site Conventional Facilities (FSCF) Scope and Interface Overview Tracy Lundin as borrowed from Headley & Willhite.
Office of Critical Decision-1 Approve Alternative Selection & Cost Range or Brief Presented by:
OTE Building PMG Report September 10, 2012 Rhonda Merchut 1.
IRC 2009 OVERALL. SITE PLAN PROPERTY LINES LOCATION OF BUILDING GRADES STREETS.
LIFE CYCLES OF AIKEN COUNTY PUBLIC SCHOOLS CONSTRUCTION PROJECT October 8, 2013.
Pier Partial GMP Proposal for Marine Structural June 1, 2017
Using Shade and Shelter in Zoo Environments
Sorting Technologies for CCA Treated Wood
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Design of a Commercial Shopping Center
Fauquier County’s Journey of Construction and Demolition
Design of a Commercial Shopping Center
Multistory Office Building
Augmented Sorting of Recovered Wood Waste Using Stain and X-Ray Technologies Recently Awarded by the FDEP Innovative Recycling Grants Program to the Town.
PITT COUNTY SOLID WASTE & RECYCLING
Sorting Technologies for CCA Treated Wood
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
X-ray Pump-Probe Instrument
Value of contract: Length of contract: Contract start date:
House Construction Budget Plan
Project: 250 West Street, Columbus, Ohio
Bellemont Fire Station Addition
Town of Medley FDEP Innovative Recycling Grants Program
Multi-Family Fourplex Apartment
Presentation transcript:

On-line Sorting Technology for CCA-Treated Wood

Funding Received from Sarasota County through the Florida Department of Environmental Protection Innovative Recycling Grants Program

Objective n Construct and Operate an On-Line System for Sorting Treated From Untreated Wood

Background n Research conducted found CCA-treated wood in C&D waste piles ä 6% in 1996 (12 C&D facilities) ä 9 to 30% in 1999 (3 C&D facilities)

Background (From SFPA) U.S. Statistics for Southern Pine Production

Conceptual Design

Conceptual Design (con’d)

Tasks n Task 1: Obtain Permit and Construct Shelter n Task 2: Design and Construct Conveyor n Task 3: Lab Test and Develop Detector (Laser, LIBS vs X-ray, XRF) n Task 4: Install and Field Test Conveyor and Detector n Task 5: Operate Sorting System and Document Performance

Overall Timeline

Task 1: Obtain Permit and Construct Shelter

Outline n Specifications and location of shelter n Construction process ä Shelter construction contractors ä Project management n Project schedule

Shelter Description n Metal fabricated building n 30 by 40 feet, 15 foot eave height n Portal frame with open sides, 1:12 sloped roof n Engineered concrete slab

Approximate Size and Roof Line

Portal Frame

Portal Frame and Open Sides

Open Sides and Height

Site Layout Parking Office Trailer Shelter Bin Wood In Wood Out Proposed Parking Machine Shop C&D Materials Processing Area C&D Material Storage Bins Entrance

Shelter Location

Construction Process n Metal fabricator - shelter design n County engineer - concrete design ä Slab ä Anchor bolts n Electric - separate subcontractor

Anchor Bolt Detail

Available Electric

Shelter Contractor Quotes n Uni-Built, Tampa, FL n Dura-Steel, Vernon, FL n Trident, Sarasota, FL n Ranged $9,000 - $17,000

Project Management n Review plans and permit documents n Coordinate inspection schedule of foundations, structural steel and electrical system n Review work in-place prior to scheduled inspection by Building Department n Prepare written summary of field inspections

Review and Concrete/Electrical Design Building Contractor Develops Design Drawing 2 Wk 5 Wks Permit Review 1 Wk PO/Contract Finalized 6 Wks Fabrication and Delivery Concrete Slab Erect Building Install Electric Schedule and Timeline July 28 August 4 21 September Wks October

Task 2: Design and Construct Conveyor

Conveyor (Task 2) n Preliminary Quotes ä American Conveyor, Miami, FL ** ä Powerscreen, Lakeland, FL

Conveyor (Task 2) Most Recent Design

Conveyor (Task 2)

Task 3: Lab Test and Develop Detector

LIBS vs XRF n Funds will be used for LIBS n Research with XRF will continue if equipment “borrowing” arrangement can be made

Laser-induced Breakdown Spectroscopy (LIBS)

LIBS Spectrum of CCA-treated Wood

LIBS-based Sorting

Sample Configuration of LIBS Probe

Field-deployable Laser: Big Sky Laser

Compact Spectrometer: Ocean Optics

On-line Sorting Technologies

XRF n ASOMA ----> Now Spectro ä Contact Harold Soisson ä Model 400

XRF n Co XRF ----> Distributors of EDAX ä Contact Steve Cox ä Model, CT-2000 Note: As detection limit 5 mg/kg

Questions? More information at: sarasota/index_sara.htm Link from: