ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June 2004 1.

Slides:



Advertisements
Similar presentations
Modelling the contents and structure of official statistics Or: How to design correct and globally consistent SDMX Data Structure Definitions Or: Navigating.
Advertisements

1 Analysis of Cost and Savings Values for Revised Energy Star Freezers and Refrigerators June 6, 2006 Revised August 8, 2006.
TMA-65 Workup Robin Lafever 30 April Detector geometry.
Jigs and Fixtures 3june , 2010 By: Abid Ali Abid.
Solids 3D shapes.
Checklist for Vehicle Testing GTR Round Robin FlexPLI Logbook for each leg to be sent with the leg to record the following: Certification tests.
9/13/2015Robin Lafever BigBoss1. Fiber and Ferrule 9/13/2015Robin Lafever BigBoss2 Typical fiber and Ferrule: My current model is out of date. Jerry Edelstein.
DesignWorks Berkeley Lamp LightFair Exhibit April 10, 2001 Display Booth workup Requirement, goals and constraints for LightFair 2001 The essential requirements,
Door seal test set-up concepts 10/10/2015Robin Lafever LBNL1 Generic Door seal concepts for personnel access and feed-through applications in the CUORE.
Physical and chemical weathering
Abbreviations and Equivalents
~HOW TO MAKE ICE CREAM~ By ~Gina~. What you'll need Ice cubes (enough to fill each gallon-size bag about half full) 1 cup half and half 1/2 cup salt 2.
Klevans2007 3D Shapes Kinder Frisco ISD. klevans2007 Examples: sphere cube cylinderpyramid cone Let’s Review The Shapes.
By D. Fisher n n n n3n3. What is the cube of 1? 1 3 = 1 x 1 x 1 = 1.

ENERGY STAR for Residential Light Fixtures Durability Implementation June 23, 2003.
Advances in shaking technologies Wolf Klöckner, Jochen Büchs Trends in Biotechnology Volume 30, Issue 6, Pages (June 2012) DOI: /j.tibtech
© T Madas From the numbers in the list below, find: the square numbers.
Lesson 1.2: Essential Question: How do you use powers to represent repeated multiplication?
Lesson 10.8 AIM: Drawing Tree Diagrams and solving Permutations.
Robin Lafever1 JDEM Focal Plane Assembly Full-scale Mock up and Cold Plate Engineering model Prepared for Michael Levi and Henry Heetderks JDEM.
Matter Fourth Grade. The student will learn: What matter is. How to identify matter. The three different states of matter.
Thursday, October 20, :20 a.m. Be prepared because this is earthquake country!
M-21 Mockup Fold-Flat Mirror Assembly M21-B-2 Robin Lafever LBNL 1 Fabrication and assembly notes.
11/30/20151Robin Lafever The existing 300 K Flange This is certainly an older version but is useful to illustrate The proposed modifications.
Robin Lafever For Russell wilcox Fiber Synch System Basic Box Fit-up 25mm and 50mm deep boxes installed in 17” chassis 12/1/20151Robin Lafever LBNL.
Lightweight UXO system Concept design For Berkeley Geophysics Concept design For Berkeley Geophysics.
Powers and roots. Square each number a) 7 b) 12 c) 20 d) 9 e) 40 a) 49 b) 144 c) 400 d) 81 e) 1600.
Typical PSA cabinet used in these layouts is based on a Type A, Series 400 Stainless Steel unit from Terra Universal. Catalog cut is shown below. CAD Models.
Temperature problem Set up a metal surface and a plastic surface and ask students to touch both and say what they feel. They invariably, accurately, say.
Water would have been ____ the cadmium. 1.Hotter than 2.Colder than 3.Same temp as
As-built 09 April 2008 Cuore concrete support structure with jack screws in place Cuore site with elevator deck ready for installation 1 Robin Lafever.
SunSatFriThursWedTuesMon January
50 /1003 / 9120 /12021 / 35 2 / 103 / 618 / 245 / /10011 / 3317 / 345 / 10 2 / 610 / 1524 / 482 / 12.
1 M2M2 M1M1 M 1p M3M3 M 3p M4M4 M6M6 M7M7 M0M0 M 0p et M 7p Flatop modulation: to keep on the surface of the cube Without or with homopolar Value Trace.
A 128 fiber Slit-Plate assembly, Kinematic mount
Solutions Lab Factors That Affect How Something Dissolves.
Sitecore SUGNL Meeting – Unit testing with test fixtures March 13 th, 2013 Robin Hermanussen – Lukkien
DesignWorks Berkeley Lamp LightFair Exhibit April 2, 2001 Display Booth workup The Basic Floorplan The essential features of the design are:  Two different.
Changing States Today’s Goal:
160 as a product of its prime factors is 2 5 x 5 Use this information to show that 160 has 12 factors.
SNAP CCD packaging study Flex-fold Internal flexure frame Robin Lafever September 2003 CCD Aluminum Nitride Invar frame CRIC, Clocks Molybdenum frame CCD.
WFIRST Large-cell structure concept design Preview Work in progress 3/4/2016Robin Lafever1.
Word Problems on Instantaneous and Average Rate of Change Math
Section P7 Equations. Solving Rational Equations.
Word Problems on Instantaneous and Average Rate of Change Math 3204
Cube Measure Group Measure Partition Cube Dimension Dimension Attribute Attribute Relationship Hierarchy Level Cube Attribute Cube Hierarchy.
REPENTURN July 5, 2015 REPENTURN REPENTURN REPENTURN.
Now here is some sand. Procedure: 1.Dry off your piece of aluminum foil with paper towels and sprinkle a small amount of sand on your.
PSA Layout studies-2 6/12/2016Robin Lafever LBNL1 In mid April 2008, a series of studies was conducted to attempt to accommodate the desire to place the.
Fiber Cable/Spectrograph Interface: The Slit-Plate Slit-Plate models are coming together. Who will fab and assemble the parts, and how, will be integral.
Science Experiment: Measuring the time it would take for ice to melt Submitted By: Jasmine A. Brown Submitted to: Mrs. Johnson Date: October 8, 2012.
14.0 Math Review 14.1 Using a Calculator Calculator
Spacecraft Mockups Applied to SNAP M-21 Baseline Mockup.
25 Math Review Part 1 Using a Calculator

Factoring Review.
Office of Sponsored Programs
روش تحقيق در تربيت بدني انسان داراي پيشرفته ترين نظام عصبي در بين موجودات جهان است تحقيق فرايند رسيدن به پاسخ سئوال پژوهشي است روشهاي دستيابي انسان به.
Toys R Us (CN) THE PERFECTLY SET FIXTURE See below for the perfectly set Toys R Us Fixture. Please ensure your Canadian Toys R Us store is set exactly.
Alignment Engineering Group
Cube roots.
© T Madas.
Office of Sponsored Programs
Proposed actions for gtr development
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
Thinking about Decimals, and what they mean.
Admissions Conversion Rates Summary
AECS sled testing (NAMI’ testing centre)
Converting Between Measures
Presentation transcript:

ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June

ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June

ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June

ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June

ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June

ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June

ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June

ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June

ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June

ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June

ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June

ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June

ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June

ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June

ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June

ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June

ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June

ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June

ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June

ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June

ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June

ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June

ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June

ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June

ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June

ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June

ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June

ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June

ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June

ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June

ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June

ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June