9 Mar 2011CMS Calorimeter Trigger Upgrade1 Sridhara Dasu (a), Rob Frazier (b), Tom Gorski (a), Geoff Hall (c), Greg IIes (c), Pam Klabbers (a), Dave Newbold.

Slides:



Advertisements
Similar presentations
GCT Software Jim Brooke GCT ESR, 7 th November 2006.
Advertisements

GCT Software ESR - 10th May 2006 Jim Brooke. Jim Brooke, 10 th May 2006 HAL/CAEN Overview GCT Driver GCT GUI Trigger Supervisor Config DB Test scripts.
09/06/11 CMS Trigger and Readout Upgrades: The IPbus Protocol & The IPbus Suite TIPP 2011 Robert Frazier Greg Iles, Dave Newbold, Andrew Rose Robert Frazier.
Phase-0 topological processor Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Level-1 Topology Processor for Phase 0/1 - Hardware Studies and Plans - Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
06-Dec-2004 HCAL TriDAS 1 TriDAS Status HF Luminosity HF Trigger Slicing.
C. Foudas, Imperial CMS Upgrades Workshop FNAL – Trigger Introduction Status of the CMS Trigger Upgrade Activities: –uTCA and Optical Link upgrades.
P. Klabbers, U. Wisconsin, IRPD13, October 2013 New CMS Level-1 Trigger - 1 New CMS Level-1 Trigger Design for the Upcoming Data Taking Pamela Klabbers.
CMS Calorimeter Trigger Upgrades
Prototype of the Global Trigger Processor GlueX Collaboration 22 May 2012 Scott Kaneta Fast Electronics Group.
David Cussans, AIDA/CALICE DAQ Palaiseau, 10 Nov 2011 Trigger/Timing Logic Unit (TLU) for AIDA Beam-Test.
Topology System Uli Schäfer 1 B.Bauß, V.Büscher, W.Ji, U.Schäfer, A.Reiß, E.Simioni, S.Tapprogge, V.Wenzel.
J. Varela, LIP Lisbon Report from the Calorimeter Trigger Review 1 Report from the Calorimeter Trigger Upgrade Review João Varela LIP on behalf of the.
S. Dasu, University of Wisconsin September Regional Calorimeter Trigger Outline: Status of Prototypes Plans for Production Testing Plans for Integration,
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
W. Smith, et al., U. Wisconsin, Oct 13, 2011 Calorimeter Trigger Upgrade- 1 Calorimeter Trigger Schedule M. Bachtis, A. Belknap, M. Cepeda, S. Dasu, E.
April CMS Trigger Upgrade Workshop - Paris1 Christian Bohm, Stockholm University for the L1 calorimeter collaboration The ATLAS Trigger Upgrade.
Dec. 19, 2006TELL1 commissioning for Calorimeters 1 TELL1 commissioning for calorimeters ■ Reminder ■ TELL1 status ■ ECS for TELL1- PVSS panels ■ Firmware.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
P. Klabbers, U. Wisconsin, TWEPP September 2012 CMS Calorimeter Trigger Upgrade - 1 CMS Level-1 Upgrade Calorimeter Trigger Prototype Development P. Klabbers.
MicroHAL - Powered by Redwood Hardware Access Library for TCP/IP or UDP/IP Greg Iles on behalf of Andy Rose & Rob Frazier 7 March 2011.
Lecture 12: Reconfigurable Systems II October 20, 2004 ECE 697F Reconfigurable Computing Lecture 12 Reconfigurable Systems II: Exploring Programmable Systems.
Latest ideas in DAQ development for LHC B. Gorini - CERN 1.
Tom Gorski, U. Wisconsin, July 20, 2009 SHLC RCT - 1 CMS Calorimeter Trigger SLHC Regional Calorimeter Trigger System Design and Prototypes Tom Gorski.
Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London CALICE a calorimeter.
26/11/02CROP meeting-Nicolas Dumont Dayot 1 CROP (Crate Read Out Processor)  Specifications.  Topology.  Error detection-correction.  Treatment (ECAL/HCAL.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
XLV INTERNATIONAL WINTER MEETING ON NUCLEAR PHYSICS Tiago Pérez II Physikalisches Institut For the PANDA collaboration FPGA Compute node for the PANDA.
W. Smith, U. Wisconsin, LHC Electronics Conference, October 1, 2003 CMS Calorimeter Regional Trigger - 1 Full Crate Test of the CMS Regional Calorimeter.
17 December, 2010 ATLAS L1Calo upgrade meeting Meeting overview Recent hardware developments, ideas.
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
IPbus A method to communicate with cards over Ethernet 1.
Trigger Workshop: Greg Iles Feb Optical Global Trigger Interface Card Dual CMC card with Virtex 5 LX110T 16 bidirectional.
Management of the LHCb DAQ Network Guoming Liu *†, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
LHC CMS Detector Upgrade Project RCT/CTP7 Readout Isobel Ojalvo, U. Wisconsin Level-1 Trigger Meeting June 4, June 2015, Isobel Ojalvo Trigger Meeting:
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
T. Gorski, et al., U. Wisconsin, November 08, 2011 Calorimeter Trigger Upgrade - 1 Upgrade Cal. Trigger R&D M. Bachtis, A. Belknap, M. Cepeda, S. Dasu,
CMS Trigger Upgrades Phase-I (1) Muon Trigger Upgrades: – CSCTF (CSC TrackFinder) – MPC (Muon Port Card) Calorimeter Trigger Upgrades: – HCAL TPG – Calorimeter.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
ROM. ROM functionalities. ROM boards has to provide data format conversion. – Event fragments, from the FE electronics, enter the ROM as serial data stream;
A demonstration of a Time Multiplexed Trigger for CMS Rob Frazier, Simon Fayer, Rob Frazier, Geoff Hall, Christopher Hunt, Greg Iles, Dave Newbold, Andrew.
MicroTCA in CMS Not Official! Just my opinions... Greg Iles 6 July 2010.
S. Dasu, University of Wisconsin February Calorimeter Trigger for Super LHC Electrons, Photons,  -jets, Jets, Missing E T Current Algorithms.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
ROD Activities at Dresden Andreas Glatte, Andreas Meyer, Andy Kielburg-Jeka, Arno Straessner LAr Electronics Upgrade Meeting – LAr Week September 2009.
CMX: Update on status and planning Yuri Ermoline, Wojciech Dan Edmunds, Philippe Laurens, Chip Michigan State University 7-Mar-2012.
Producing FPGA Firmware- 1 U. Wisconsin, February 19, 2009 Calorimeter Algorithm Firmware Calorimeter Trigger Upgrade Firmware Michael Schulte, Katherine.
A demonstrator for a level-1 trigger system based on μTCA technology and 5Gb/s optical links. Greg Iles Rob Frazier, Dave Newbold (Bristol University)
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
Backend Control Systems in uTCA HCAL Requirements January 21, 2010 Jeremiah Mans.
E. Hazen -- ACES ACES 2011 MicroTCA in CMS E. Hazen, Boston University for the CMS collaboration.
T. Gorski, et al., U. Wisconsin, April 28, 2010 SHLC RCT MicroTCA Development - 1 SLHC Cal Trigger Upgrade SLHC Regional Calorimeter Trigger MicroTCA Development.
AMC13 Project Status E. Hazen - Boston University
AMC13 T1 Rev 2 Preliminary Design Review E. Hazen Boston University
A Compact Trigger Architecture for SLHC
uTCA A Common Hardware Platform for CMS Trigger Upgrades
Trigger Upgrade Planning
ATLAS L1Calo Phase2 Upgrade
MicroTCA Common Platform For CMS Working Group
Status of the oSLB project
MicroTCA A look at different options...
Regional Cal. Trigger Milestone: Major Production Complete
LHCb Trigger, Online and related Electronics
LIP and the CMS Trigger Upgrade On behalf of the LIP CMS Group
Presentation transcript:

9 Mar 2011CMS Calorimeter Trigger Upgrade1 Sridhara Dasu (a), Rob Frazier (b), Tom Gorski (a), Geoff Hall (c), Greg IIes (c), Pam Klabbers (a), Dave Newbold (b), Andrew Rose (c),Wesley Smith (a), Alex Tapper (c) (a) University of Wisconsin, (b) Bristol University, (c) Imperial College London 9 March 2011

9 Mar 2011CMS Calorimeter Trigger Upgrade22 Calorimeter Trigger Designs Two approaches for Calorimeter Trigger – Compact Trigger: CT—early formation of 2x2 clusters (with fractional tower resolution) leading to reduction in hardware footprint – Time Multiplexed Trigger: TMT – similar to HLT, enables entire calorimeter to be processed in a single FPGA Currently evaluating different designs and how to integrate them into the LHC schedule and into CMS.

9 Mar 2011CMS Calorimeter Trigger Upgrade33 Concepts ECAL Tower Energy (8bit) Info (1bit) HCAL Tower Energy (8bit) Info (1bit) Could increase to 12bits e.g. Depth segmentation information CAL Tower Energy (9bit) Info (1bit) Baseline is 10bits Some designs have 16bits or retain all the calorimeter data (24bits). Trade-off between capability and cost, risk, size of a system In the beginning everything is the same... ~5 Tb/s

9 Mar 2011CMS Calorimeter Trigger Upgrade44 Concepts: Compact Trigger Region results: (e.g. Top e/gamma/taus, 4x4 superclusters w/ ½ tower res, ECAL Et) x21 Input Processors x8η, x24φ Regions x21 Region Processors x10η, x26φ Sort Elecs & Taus Build & Sort Jets To Global Trigger Energy Sums, Jets, Elecs & Taus x8 Elecs/Taus x8 Jets ECAL Tower Energy (8bit) Info (1bit) HCAL Tower Energy (8bit) Info (1bit) Tower Energy (9bit) Veto (1bit) Process x2 - x5 Summary Cards Flexibility exists to run different summary cards in parallel to optimise elec/tau, jet or energy sum path. 2.4Gb/s input reduces processing areas by 2, but otherwise no change to fundamental operation

9 Mar 2011CMS Calorimeter Trigger Upgrade55 Concepts: Time Multiplexed Trigger

9 Mar 2011CMS Calorimeter Trigger Upgrade66 Concepts: Time Multiplexed Trigger x36 Pre Processors x28η, x4φ η non contiguous x12 Main Processors x56η, x72φ(entire detector) ECAL Tower Energy (8bit) Info (1bit) HCAL Tower Energy (8bit) Info (1bit) Tower Up to 16bits Process & Multiplex Process To Global Trigger Energy Sums, Jets, Elecs & Taus ? Max flexibility, but at increased complexity 2.4Gb/s input forces processing area to be spit over 2 FPGAs, albeit with large (8-12) tower overlap

9 Mar 2011CMS Calorimeter Trigger Upgrade77 Rack Space with 4.8 Gbps Spare 4x Patch Panel 4x4U=16U 144 fibre ports (12x12) MP crate heat exchanger 8U MP crate heat exchanger 8U PP crate heat exchanger 8U PP crate heat exchanger 8U PP crate heat exchanger 8U Spare Summary crate heat exchanger 8U Input crate heat exchanger 8U From HCAL and ECAL 50U 19” rack Spare To Global Trigger Spare Input crate heat exchanger 8U Input crate heat exchanger 8U From HCAL and ECAL Time Multiplexed Trigger 50U 19” rack To Global Trigger Compact Trigger Patch Panel could be in back of rack. Shown in the front for simplicity Old system uses more than 10 racks !

9 Mar 2011CMS Calorimeter Trigger Upgrade8 Decouple Trigger Upgrade from CMS? Duplicate data at calorimeters – Extra Hardware – But decouples Trigger Upgrade from CMS Choose between 2.4Gb/s and 4.8Gb/s input links – Impact on CT v TMT, but also integration – 2.4Gb/s: Probably only duplicate part of CMS Trigger. Can debug in parallel for a long time, but final switchover fast (i.e. winter stop) – 4.8Gb/s: Can duplicate entire trigger but depends on availability Xilinx Kintex parts. If not available then cost increase substantial. Calorimeter Old Trigger Global Trigger New Trigger

9 Mar 2011CMS Calorimeter Trigger Upgrade99 Status Wisconsin & Imperial examining physics cases to see if there is any physics motivation to choose one design or other at luminosity of 2x10 34 with 50ns spacing

9 Mar 2011CMS Calorimeter Trigger Upgrade10 Hardware Demonstrators MINI-T5 Card: Demonstration of Electron & Tau algorithm and DAQ in Time Multiplexed Trigger Aux Card: Demonstrating link alignment over multiple cards and serdes links.

9 Mar 2011CMS Calorimeter Trigger Upgrade11 Calorimeter Trigger Infrastructure IPMI Development: Tom Gorski – Management Interface to AMC cards – Thermal & Power diagnostics – Distribution of IP address In collaboration with Vim Beaumont Ethernet Communication: TCP/IP & UDP/IP – Two approaches – Embedded Processor for TCP/IP (Tom Gorski) Based on Xilinx MicroBlaze – State machines for UDP/IP (Andrew Rose & Dave Newbold) Based on core from Jeremy Mans

9 Mar 2011CMS Calorimeter Trigger Upgrade12 Calorimeter Trigger Infrastructure SPI-over-LAN: Tom Gorski – Writing Flash via TCP/IP connection over Fabric A GbE connection using a prototype server and GPIO pins implementing a serial interface (SPI) Link alignment: Tom Gorski & Greg Iles – Ensuring data from serdes links synchronized.

9 Mar 2011CMS Calorimeter Trigger Upgrade13 MicroHAL: What is this all about? xTCA has no standardized protocol for register access Common method to access registers J. Mans (CMS HCAL) proposed a packet format, IP-Bus, specification compatible with TCP/IP and UDP/IP – Also supplied firmware core MicroHAL – Advanced software layer for register access – Redwood package provides infrastructure – Developed by Andrew Rose

9 Mar 2011CMS Calorimeter Trigger Upgrade14 Hierarchical Include calls to other module files 14 <module path="examples/algo.xml“ name=“algo“ address="0x0000"/> Where examples/algo.xml contains

9 Mar 2011CMS Calorimeter Trigger Upgrade15 MicroHAL Supports all basic commands – e.g. Read/Write, RMW, Block Read/Write Automatically concatenates commands together – Important given IP latency – Commands executed sequentially by firmware or micro-processor Hierarchical nature – Allows modular design Scalable design – Uses Telecom software tools for critical parts PC has full knowledge of FPGA memory / registers – Can map onto database

9 Mar 2011CMS Calorimeter Trigger Upgrade16 Plan to 2014 Now have extra year until first shutdown (2013/14) – Opportunity to install parallel connections to at least a full RCT crate (1/18) – Remainder during technical stops Decouples Trigger Upgrade from existing system Allows Trigger Upgrade to be commissioned while LHC is running. Allows upgrade to be fully verified before switchover Not low cost (several $100k), but does guarantee that Trigger fully operational during critical period for CMS

9 Mar 2011CMS Calorimeter Trigger Upgrade17 J F M A M J J A S O N D J F M A Start design, build & test prototype OSLB-CAL & OSLB-RCT Start design build and test final OSLB-CAL & OSLB-RCT Production run of OGTI – Install + test in 904 Install OGTI at Pt5 Install OSLBs at Pt 5 Physics Studies Decide final design Write TDR Physics Studies Important Test in parallel with CMS OSLBs Critical Decoupling of Trigger Upgrade from ECAL/HCAL & GT

9 Mar 2011CMS Calorimeter Trigger Upgrade18 J F M A M J J A S O N D J F M A Start design, build & test prototype OSLB-CAL & OSLB-RCT Start design build and test final OSLB-CAL & OSLB-RCT Production run of OGTI – Install + test in 904 Install OGTI at Pt5 Install OSLBs at Pt 5 Simulations Decide final design Write TDR Test in parallel with CMS Installation of Trigger Upgrade Start design build and test final Processor Cards (i.e. Input/PP & Summary/MP) Install vertical slice in couple of uTCA crates using final hardware at Pt5 Many prototype Summary/MP cards available for testing uTCA 904? Same staff used for Trigger Decouple as Trigger Upgrade This has lower priority. Not governed by LHC schedule Could implement full vertical slice of Trigger in uTCA crate. Latency might be longer, but firmware & software could be very close to final system. Need to know what architecture to use!

9 Mar 2011CMS Calorimeter Trigger Upgrade19 Links Compact Trigger CMS Note: CMS IN-2010/ Time Multiplexed CMS Note – MicroHAL – Project website – – HepForge repository – – Software User Manual, Instant Start Tutorials and Developers Guide – – More info: Please contact Andrew Rose: