Organization of Workstations

Slides:



Advertisements
Similar presentations
Lean Manufacturing.
Advertisements

Process Selection and Facility Layout
Chapter 10 – Facility Layout
DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie Cook F O U R T H E D I T I O N Facility Decisions: Layouts © The McGraw-Hill Companies, Inc., 2003.
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Just-In-Time and Lean Systems
1 IRWIN  a Times Mirror Higher Education Group, Inc. company, 1996 Facilities Layout.
Just-in-Time and Lean Systems
Location Strategy and Layout Strategy
Operations Management Just-in-Time Systems Supplement 12
Just-In-Time “Eliminate Waste”.
Chapter 7 – Just-in-Time and Lean Systems Operations Management by R. Dan Reid & Nada R. Sander s 2 nd Edition © Wiley 2005 PowerPoint Presentation by.
Facility Layout Facility Layout Facility Layout decisions translate the broader decisions about a firm’s strategy such as competitive priorities, process,
1 Facility Layout. 2 What Is Layout Planning Layout planning is determining the best physical arrangement of resources within a facility Two broad categories.
Facility Layout 1. General Observations Facility Planning includes planning for: (1) the number of facilities and general facility type, (2) facility.
Operations Management
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
Layout Strategy. Introduction What – Layout Decisions Where – For efficiency or customer appeal Why – Improve Profitability.
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
JIT and Lean Operations
Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Lean Systems Operations Management Chapter 16 Roberta Russell.
Process Selection and Facility Layout
Operations Management
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
Operations Management
Chapter 10 – Facility Layout
Process (Job Shop) Layouts
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
Facility Layout Technical Note 6.
JIT and Lean Operations
Chapter 10 – Facility Layout
Chapter 9 : Layout Strategies
Chapter 4 Process Design.
Facility Layout Chapter 10 pages , ,
© Wiley 2007 Chapter 10 Facility Layout. © Wiley 2007 OUTLINE What Is Layout Planning? Types of Layouts Designing Process Layouts Special Cases of Process.
Assembly Lines – Reliable Serial Systems
Mba Facility Layout u Basic layouts u Some layout techniques u Assembly line balancing u Service Layout.
© The McGraw-Hill Companies, Inc., Technical Note 5 Facility Layout.
Process Layout Chapter 7 July 20, 2005.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Reid & Sanders, Operations Management © Wiley 2002 Facility Layout 10 C H A P T E R.
Lean Production.
© Wiley Chapter 10 – Facility Layout Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Chap 4 - Facility Layout: Manufacturing and Services.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
8.0 LEAN Chuah Shu Chin B Jennise Tan Teng Teng B Yeow See Leong B
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
Operations Management JIT & Lean Systems
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 8 Facility Layout.
Part 3.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Manufacturing Processes
IE 366 Chapter 9 Organization of Workstations Supplementary Material from: Groover, M.P. (2007). Work Systems and the Methods, Measurement, and Management.
Definition: The physical positioning of processes, departments, equipment and work areas to optimize an organization’s effectiveness in achieving its operating.
Facility Layout Chapter 10 pages , ,
Introduction to Motion and Time Study
Chapter 3 MANAGING THE TRANSFORMATION PROCESS
Organization of Workstations
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Cellular Layouts Cellular Production Group Technology
PRODUCTION SYSTEMS Terminology Concept: Production: Performance:
FACILITY LAYOUT Facility layout means:
Facilities Planning and Design Course code:
Process Selection and Facility Layout Lecture 5. Forecasting Product and Service Design Technological Change Capacity Planning Process Selection Facilities.
Copyright ©2016 Cengage Learning. All Rights Reserved
Presentation transcript:

Organization of Workstations Applications in traditional and lean systems Tradeoffs among guidelines depend on type of production, number and types of items being produced, etc. Nine guidelines: Use Specialization Even Though It Sacrifices Versatility Consider Group Technology Consider Both Non-progressive and Progressive Assembly Balance Flow Lines Minimize Material Handling Cost Decouple Tasks Make Several Identical Items at the Same Time Combine Operations and Functions Vary Environmental Stimulation Inversely with Task Stimulation ISE 311

G1: Use Specialization Even Though It Sacrifices Versatility Special-purpose equipment Specialized materials Specialized labor Group technology ISE 311

G2: Consider Group Technology Form families of items that are almost identical. May be based on part geometry or process similarities. Classification process depends on solving coding problem. May be the basis of factory specialization. Imitate a flow line and shift fixed costs of the flow line to the process. Find common solutions to common problems. Benefits of Product Families Product design An existing part can be used in place of a proposed new part. An existing part, modified, can replace a new part. The existing part can provide design data for a new part. Common manufacturing Lessons can be learned from similar parts. Existing tooling can be used. Setup and training costs can be reduced. ISE 311

Cell Layout Cell: machines and skills for producing related items placed close together. Advantages: Specialization Minimum material handling Simpler production control Shorter throughput times Lower work-in-process (WIP) inventory Disadvantages: Lower equipment utilization Loss of flexibility Cost of setting up and maintaining concept ISE 311

G3: Consider Both Non-progressive and Progressive Assembly Consider an assembly of N elements that requires m people to work. Non-progressive assembly: Each worker does all N elements. Progressive assembly: The job is split so each worker does N/m elements. Which should we choose? ISE 311

Non-Progressive Assembly Advantages Neutral Characteristics Disadvantages Balance delay time is eliminated. Scheduling flexibility is increased. Shocks do not have multiple effects. Musculoskeletal disorders are less of a problem. Satisfaction may increase. Quality may be higher or lower with each type of assembly. Material handling has advantages and disadvantages in both. Space requirements could favor either. Walking may be required in either. Direct labor cost/hour is higher. Skill requirements and training costs are higher. Equipment capital cost is higher. In-process inventory is higher. Supervision is more difficult. ISE 311

Reasons for Flow Lines Some of their advantages are emphasized by decision makers. Cost advantages that favor flow lines are visible, whereas the costs that do not favor them are lost in overhead figures. Many of their disadvantages can be overcome by good system design. Work cells in lean production can be combined into flow lines and balanced. ISE 311

G4: Balance Flow Lines Balance the tradeoffs between number of stations or cells and the amount produced by each station to meet production times as smoothly and efficiently as possible. Before balancing flow lines: Ask whether it is appropriate to balance the line. Gather the givens: Table of work elements and times Precedence diagram Required units/minute from line (Takt time) Determine: Number of stations/cells Number of workers at each station/cell Elements to be done at each station/cell takt time is set by the customer. ISE 311

Standard Balancing Technique Example: Final assembly of an electronic organ (from Weiss and Gershon, Production and Operations Management (2nd ed.), 1993, Allyn & Bacon.) ISE 311

Line balancing Step 1: draw the precedence diagram ISE 311

Line balancing Step 2: Determine quantity to be made and takt time. Example: Production goal = 200 organs/day (set by customer demand) Cycle time = (1 day/200 organs) * (8hrs/day) * (3600 sec/hr) = 144 sec/organ Estimate an approximate number of stations. Number of stations = total time required / takt time = 510 sec / 144 sec = 3.54 = _______ 4 stations ISE 311

Line balancing Step 3: Make a trial solution. Station Task Task time Longest task time rule: from among the available tasks, choose the one that takes the longest. In case of a tie, choose the one with the most followers. Station Task Task time Total time Station Idle Time Total Idle time Alternative - Ranked positional weighting method: from among the available tasks, choose the one with the longest total following time. In case of a tie, choose the one with the longest operation time. Start this – finishing will be the homework … ISE 311

Station Task Task time Total time Station Idle Time Total Idle time ISE 311

Line balancing Step 4: Determining the efficiency idle time = (# of stations * cycle time) - (time to produce 1 unit) efficiency = (time to produce 1 unit) / (# of stations * longest station time) or efficiency = (theoretical minimum cycle time) / (achieved cycle time) ISE 311

Line Balancing Problems: Options Mean times for stations are not equal, so there is balance-delay time. The speed at a station in a balanced line must be set at the speed of a slow operator on a slow station. Cycle times vary. Options Consider element sharing. Remember that cycle times are not fixed. Remember that elements often can be redefined. Interchange elements from the assembly task and the subassembly tasks. kanban - inventory control pull system parts placed in containers for next cell when parts are pulled, they must be replaced ISE 311

G5: Minimize Material Handling Cost Elements of material handling cost: Material handling cost/year = Capital cost + Operating cost Operating cost = Number of trips/year × Cost/trip Cost/trip = Fixed cost/trip + (Variable cost/distance × distance/trip) Reduce material handling cost by … Consider how utilization affects capital costs vs. operating costs. Eliminate peak loads through scheduling. Replace transportation with communication. Reduce number of trips through scheduling and combining. Reduce fixed costs by using line production. Move more product/labor hour. Reduce distances by efficient layout and arrangement. Use a “bus” instead of a “taxi” system. Emphasize reducing total MH costs rather than individual elements. ISE 311

Strategies to Reduce Material Handling Cost Consider how utilization affects capital costs vs. operating costs. Eliminate peak loads through scheduling. Replace transportation with communication. Reduce number of trips through scheduling and combining. Reduce fixed costs by using line production. Move more product/labor hour. Reduce distances by efficient layout and arrangement. Use a “bus” instead of a “taxi” system. Emphasize reducing total MH costs rather than individual elements. ISE 311

G6: Decouple Tasks Types of flow lines: Decisions to consider: Operation-only line Order-picking line Assembly line Decisions to consider: Single product or multiple products? Assemble in sub-assemblies or on the line? How to divide tasks among stations? Balanced or unbalanced? Characteristics of well-designed lines: Minimum idle time at the stations High quality (enough time at each station) Minimum capital cost ISE 311

Lean Manufacturing (Just-in-Time) Reduction of work-in-process inventories to minimal amounts, to force management to solve problems by revealing them. Little product variety Producing only what the customer wants, when it is wanted High quality High equipment availability Short setup times Cross-trained skilled workers ISE 311

Shocks and Disturbances Cause cycle times to vary. May result from operator variability, station starvation, or station blockage. Buffers provide flexibility/tolerance. In lean systems, the presence of inventory buffers indicate waste opportunities to improve process goal is to eliminate the need for buffers ISE 311

Buffering Techniques Decouple by changing product flow Buffers at or between stations Buffers due to carrier design Buffers off-line Decouple by moving operators Utility operator Help your neighbor n operators, n workstations n operators, >n workstations ISE 311

G7: Make Several Identical Items at the Same Time Task stages: Get ready Do Put away Reduce cost/unit by prorating get-ready and put-away over more units. ISE 311

G8: Combine Operations and Functions Use multi-function materials. Use multi-function tools. ISE 311