1 Collaboration%20Meetings/SMTF%20Collaboration%20Meeting.

Slides:



Advertisements
Similar presentations
FNAL Superconducting RF Program Sergei Nagaitsev.
Advertisements

SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
H. Hayano, KEK, New SRF Facility at Belgrade SRF-WG.
Dec. 2005E-upgrade GDE Frascati1 “Energy Upgrade Scenario TG” Report L.Lilje, T.Raubenheimer and N.Toge Full Report:
US Cavities Status and Plan Mark Champion 01 October 2009.
ANL-FNAL Collaboration Meeting: Superconducting RF ANL: Mike Kelly, Scott Gerbick, Bill Boettinger (NE) FNAL Collaborators: Kerry Ewald, Cristian Boffo,
Overview of the ILC and SRF Program (With an emphasis on Px) Shekhar Mishra ILC & SRF Program Fermilab.
Americas S0 Plan in USA Shekhar Mishra Fermilab/GDE US Main Linac Cavity and Cryomodule WBS.
5/10/2005AAC Review, Fermilab1 ILC R&D at Fermilab Overview (Main Linac and Superconducting RF) Shekhar Mishra Fermilab.
F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
ILC R&D at Fermilab Robert Kephart. ILC Americas f Fermilab May 15-18, 2006FY06 DOE Annual Review2 Outline Fermilab ILC Goals Fermilab’s role in the GDE.
Plans for Future SRF Infrastructure Shekhar Mishra ILC Program Fermilab.
ILC Cavity and Cryomodule Overview Shekhar Mishra Fermilab.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
ILCTA_IB1_VTS An in-ground vertical test facility for ILC SRF cavities at Fermilab Camille M. Ginsburg ILC SRF Technical Status Meeting 5.May 2006 for.
SRF Plans at ANL & FNAL Bob Kephart ILC Program Director, Fermilab ANL-FNAL-U of C Collaboration Meeting Oct 12, 2009.
F February 27, 2006 Fermilab Budget Briefing 1 Fermilab Budget Overview International Linear Collider FY05 - FY08 Bob Kephart February 27, 2006.
Summary of SRF WG, LCWS14 H. Hayano, A. Yamamoto.
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
4/29/2005Talk Presented at SMTF Collaboration Meeting 1 Fermilab ILC R&D Status and Plan (Superconducting RF) Shekhar Mishra Fermilab.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Status of U.S. Cavity & Cryomodule Industrialization Bob Kephart LCWS10/GDE Beijing, March, 2010.
TTC Meeting, Frascati, 5-7 December Summary of EP discussions at Oct SMTF meeting at FNAL T. Tajima (LANL), C. Boffo (FNAL)
R&D Expected in Cooperation with Vendors ILC Baseline Assessment Workshop Mark Champion September 09, 2010.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
Welcome and Presentation of Charge Steve Holmes Accelerator Advisory Committee ( May 10-12, 2005.
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
ILC Americas Cavity and Cryomodule R&D Shekhar Mishra ILC Program Fermilab Talk presented at DOE Annual Program Review Breakout Sessions – Wednesday, May.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
On S1Global Writeup S1G Writeup Meeting Nobu Toge 1.
Proton Driver Resources & Schedule (R&D Plan) Rich Stanek May 10, 2005.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
U.S. Plan for Cavity Production Bob Kephart ALCPG09/GDE Sep 30, 2009.
Global Design Effort Main Linac Technology System Kick-off Meeting Cavity Summary 20 Sept 2007 DESY Marc Ross.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
Detail plan of S1-Global H. Hayano (KEK),
Report of HLRF KOM/ALCPG07 S. Fukuda(KEK) R. Larsen(SLAC)
1 Status of the BCD GDE Area System Leaders Meeting (Jan.19-20, 2006) Nobu Toge (KEK)
Project X: Accelerators Sergei Nagaitsev September 2, 2011.
ILC Cryomodule Industrialization in the U.S. R. Kephart (+ H Padamsee )
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
Technical Board Report TESLA Technology Collaboration Meeting, Dec. 5 – 8, 2011, IHEP, Beijing, China TESLA Technology Collaboration Meeting, Dec. 5-8,
9-cell cavity coordination CM Ginsburg 15 Mar
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
Hans Weise, DESY TTC Meeting, Milano, February 28 – March 3, 2011 Technical Board Meeting TESLA Technology Collaboration Meeting Milano, February 28 th.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
Start of S2 Milestone Work H. Padamsee. Intro At KEK S2 meeting we decided to make a list of milestones and eventually cost S2 activities I tried to start.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
Preparation for DESY Meeting
SRF summary accelerator WG
ILC R&D Board Meeting: SRF Cavities Status and Plans
ILC Cavity & Cryomodule Overview
Charge for the Technical Board Members of the Tesla Technology Collaboration (TTC)
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
2. SCRF General Preparation for the AD&I Preparation for AAP Review
WG3: Main Linac SCRF(cavity,cryomodule)
ILC R&D at Fermilab Overview (Main Linac and Superconducting RF)
IHEP Cryomodule Status
Presentation transcript:

Collaboration%20Meetings/SMTF%20Collaboration%20Meeting %20Oct%205%2C6%2C7%202005/ SMTF Meeting Report (Oct.5-7, 2005, FNAL) Oct. 14, 2005 KEK/ILC-Asia WG2 mtg Nobu Toge (KEK)

2 Meeting Outline 3-day meeting at FNAL. Plenary sessions –The first day opening. –The last day close-out Otherwise, parallel sessions –WG1: cavities –WG2: cryomodules –WG3: CW and beam testin  we did not attend –WG4: PD  we did not attend In addition, –Collaboration board mtg (first day late afternoon, with P.Oddone, B.Barish and G.Dugan) –Technical board mtg (second day noon) Non-US participation –Asian : N.Ohuchi (WG2), T.Saeki (WG1) and N.Toge (WG2) –European : DESY, INFN, both direct presence and via video

3 SMTF Cavity Status (Mishra) 4 units of TESLA design cavities from ACCEL (took 6 mo to fab) now under mechanical meas/testing at FNAL. They will be BCPed at Cornell and be tested at FNAL with the goal ~ 25MV/m. Then they will be EPed at Jlab and be tested FNAL with the goal ~ 35MV/m. 4 or 8 additional cavities from AES will follow the same path. They will be dressed, horizontal-tested then installed in the first cryomodule. Plan exists to augment the EP facility by building a new one at ANL for accelerating the loop of production-and-processing.

4 ACCEL FNAL Delivery date September 09, 2005, fabrication time 6 month

5 A Joint ANL/FNAL Processing Facility Chemical Processing Rooms Air Scrubber

6 Conversion of DESY/INFN drawings (Type-III) into US system almost completed (keep metric scales; adopt US-spec stock items). Getting ready to start ordering parts. Cryomodule Assembly Facility (CAF) currently in preparation at MP9 area (design done, orders been placed). It will be used to build the module above in FY SMTF Cryomodule Status (Mishra)

7 Cryomodule Assembly Facility (MP9) Cavity will be dressed in CAF for horizontal test at Fermilab at PDTF. Horizontally tested cavities will be assembled into a string at CAF. Cryomodule fabrication takes place at CAF. Single cryomodule will be tested at the ALCTF.

8 SMTF General (Lockyer) In the process of sorting out: –Relations of ILC/PD/RIA/CW components among SMTF –Relation of SMTF w.r.t GDE and world ILC activities in other regions. Looking for a new name for the whole group (STELA?). And for individual projects (e.g. ILCTA, ILCTF etc) Exploring ways to facilitate the growth of SRF capabilities in all three regions for ILC, e.g. three meetings per year with commonly shared agenda.

9 There will be a big pressure to start serious international discussion in late 2005-early 2006, for the next-stage ILC cryomodule development. –NA group is trying to ready themselves for that. Likely scenario: –Formally start international design work in 2006, –intensity that in 2007, and –move on to the construction, assembly and testing following these. Important prerequisites: –NA and AS teams to rapidly accumulate experience and thoughts. –In case of AS, sufficiently strengthen the cryostat team. –GDE figures out how to institutionalize the ILC collaboration framework under GDE. Toge’s Personal Remarks (1) - Observations -

10 Toge’s Personal Remarks (2) - Possible Action Items - We should draft our Phase-2 cryomodule plan. –Straw-man version of next-stage cryomodule that we need towards ILC. –Pay attention to outcome at Snowmass2005, SMTF last week and BCD. If appropriate, submit inputs. –Determine how it relates to STF Phase-2 cryomodule plan. We should draft our international collaboration plan in FY2006 and beyond. –Technical aspects (e.g. what to build, how to test, what to verify) –Organizational aspects (e.g. how to discuss, how to share, how to parallelize) We should submit proposals at Frascati and/or Bangalore, and take an initiative. Do all three above, while keeping Phase-1 in pace and strengthening our SRF team particularly the cryostat area.