EDGE™ Concept Development & Selection prepared by Prof. Margaret Bailey (ME) Copyright © 2008 Rochester Institute of Technology All rights reserved.

Slides:



Advertisements
Similar presentations
Teaching materials to accompany:
Advertisements

Advanced Energy Vehicle (AEV)
Chapter 2 Analyzing the Business Case.
Teaching materials to accompany:
EDGE™ Concept Development & Selection prepared by Prof. Margaret Bailey (ME) Copyright © 2008 Rochester Institute of Technology All rights reserved.
R. I. T Mechanical Engineering Engineering Design Brief Case Study: What is the Engineering Design Process and Why is it Critical? Rochester Institute.
Product Design L5- Ch4: Product Specifications Dr. Husam Arman 1.
Concept Selection Product Design and Development Chapter 8
Opportunity Identification
Product Design L6- Ch7: Concept selection
Chapter 2.
EDGE™ Concept Development & Selection prepared by Prof. Margaret Bailey (ME) Copyright © 2006 Rochester Institute of Technology All rights reserved.
EDGE™ Concept Development & Selection prepared by Prof. Margaret Bailey (ME) Copyright © 2006 Rochester Institute of Technology All rights reserved.
EDGE™ Functional Decomposition and Concept Generation - MSD I Workshop 3 prepared by Prof. Margaret Bailey (ME) Copyright © 2007 Rochester Institute of.
1 2-1 McGraw-Hill/Irwin Copyright © 2003 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc.,
Teaching materials to accompany:
Designing a Product Product design is usually a problem that requires a creative Design and/or manufacturing solution.
EDGE™ Concept Development & Selection prepared by Prof. Margaret Bailey (ME) Copyright © 2006 Rochester Institute of Technology All rights reserved.
EDGE™ Functional Decomposition and Concept Generation prepared by Prof. Margaret Bailey (ME) Copyright © 2007 Rochester Institute of Technology All rights.
Analyzing the Business Case
Development Processes and Product Planning
1Concept Selection Jonathan Weaver UDM ME Department.
Teaching materials to accompany:
Teaching materials to accompany:
Development Processes and Organizations
Product Design L2- Development processes and organizations Dr. Husam Arman 1.
Teaching materials to accompany:
Identifying Customer Needs
Teaching materials to accompany:
Teaching materials to accompany:
The Design Process Drawing And Design For Production Engineering.
Product Specifications
 How to choose the best concept?  How to decide as a team?  How to document the process?
Decision Making Matrix
Concept Selection Product Design and Development Chapter 7 Karl T. Ulrich and Steven D. Eppinger.
1 Rev: 02/12/2007 MSE-415: B. Hawrylo Chapter 8 Concept Testing MSE-415: Product Design Lecture #5.
Chapter 12 Developing and Managing Products 12 | 3Copyright © Houghton Mifflin Company. All rights reserved. Objectives Understand how companies manage.
Concept Evaluation/Selection Dept. of Aerospace Engineering IIT Bombay AE 207 Introduction to Engineering Design.
Concept Evaluation and Selection… Integrated Product and Process Design ME En 475/476.
Product Design for Manufacturability and Automation
First-Year Engineering Program Advanced Energy Vehicle Topics: AEV Design Concept Screening and Scoring.
Design Process Overview. What is Design? The word “design” is often used as a generic term that refers to anything that was made by a conscious human.
Fifth Lecture Hour 9:30 – 10:20 am, September 9, 2001 Framework for a Software Management Process – Life Cycle Phases (Part II, Chapter 5 of Royce’ book)
Improving Your Business Results Six Sigma Qualtec Six Sigma Qualtec Six Sigma Qualtec – All Rights Reserved 1 Designing a Product, Service, Process or.
Concept Selection Teaching materials to accompany: Product Design and Development Chapter 7 Karl T. Ulrich and Steven D. Eppinger 2nd Edition, Irwin McGraw-Hill,
1 Lecture #1: PD - Ch 1. Introduction Ref: Product Design and Development by Karl T. Ulrich and Steven D. Eppinger, McGRAW-Hill
© G. A. Motter, 2006, 2008 & 2009 Illustrated by Examples Quality Function Deployment and Selection Matrices Customer Driven Product Development.
Chapter 12 EIN 6392, Product Design summer 2012
Chapter 7 Concept Selection.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
Fall 2015 ECEn 490 Lecture #8 1 Effective Presentations How to communicate effectively with your audience.
Product Specifications Teaching materials to accompany: Product Design and Development Chapter 5 Karl T. Ulrich and Steven D.Eppinger 2nd Edition, Irwin.
Fall Last Homework assignment −Complete the FSD. Due Today. Put on website and a copy to me. −Work on the Concept Generation portion of the.
Section 30.1 Product Development Chapter 30 product planning Section 30.2 Sustaining Product Sales.
Tata McGraw CHAPTER 4 Product and Service Design.
New Product Development Management NPDM 6 Mohsen SADEGHI Department of Graduate School of Management and Economics Sharif University of Technology.
Concept Generation Teaching materials to accompany: Product Design and Development Chapter 6 Karl T. Ulrich and Steven D. Eppinger 2nd Edition, Irwin McGraw-Hill,
DESIGN OF PRODUCTS AND SERVICES Chapter Three Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
R. I. T Mechanical Engineering Design Concepts and Selection Design Project Management Rochester Institute of Technology Mechanical Engineering Department.
Concept Development & Selection
Concept Development & Selection
Product Specifications
MINGGU KE 9: PROSES DESAIN PRODUK BARU
PRODUCT SPECIFICATIONS chapter FOUR
CONCEPT SELECTION chapter SIX
What is a Design Process?
Chapter 7 Concept Selection
Decision Matrix.
IED Product Management Day #2
Chapter 12 EIN 6392, Product Design Fall 2009
Presentation transcript:

EDGE™ Concept Development & Selection prepared by Prof. Margaret Bailey (ME) Copyright © 2008 Rochester Institute of Technology All rights reserved.

EDGE™ Session Overview Introduce Concept Development & Selection ProcessIntroduce Concept Development & Selection Process Explore Two-Stage MethodologyExplore Two-Stage Methodology Demonstrate Above Steps on ExampleDemonstrate Above Steps on Example Discuss Common Dysfunctions Associated with this PhaseDiscuss Common Dysfunctions Associated with this Phase Apply Concept Development & Selection Process to Team MSD I ProjectApply Concept Development & Selection Process to Team MSD I Project

EDGE™ Concept Development & Selection Session Learning Objectives 1.Understand concept selection matrix - commonly used decision tool in product development 2.Reinforce importance of concept selection within product development process 3.Explore the application of a selection matrix method for selecting & developing product concepts – can be applied to sub-systems as well.

EDGE™ Concept Development & Selection Process Perform Economic Analysis Benchmark Competitive Products Build and Test Models and Prototypes Identify Customer Needs Establish Target Specifications Generate Product Concepts Select Product Concept(s) Set Final Specifications Plan Downstream Development Mission Statement Test Product Concept(s) Development Plan Karl T. Ulrich and Steven D. Eppinger, 2008, Product Design and Development, Exhibit 7-2, Chapter 7, 4 th Edition, p. 125, Irwin McGraw-Hill These activities can occur throughout the design process!

EDGE™ Concept Ratings Selection Criteria Winning Concept(s) Concept Development & Selection Process Goal: The goal is not to select the best concept but to develop the best concept by combining and/or refining Concepts Screening Stage Scoring Stage

EDGE™ Concept Development & Selection Funnel Karl T. Ulrich and Steven D. Eppinger, 2008, Product Design and Development, Exhibit 7-4, Chapter 7, 4 th Edition, p. 128, Irwin McGraw-Hill

EDGE™ Concept Selection Process Prepare the Matrix Rate Concepts Rank Concepts Combine and Improve Select Best Concept Reflect on the Process Screening Stage Screening Stage Scoring Stage Scoring Stage Prepare the Matrix Rate Concepts Rank Concepts Combine and Improve Select Best Concept Reflect on the Process

EDGE™ Concept Selection Example: Reusable Syringe Karl T. Ulrich and Steven D. Eppinger, 2008, Product Design and Development, Exhibit 7-1, Chapter 7, 4 th Edition, p. 123, Irwin McGraw-Hill

EDGE™ Concept Selection Example: Reusable Syringe Design an improved, reusable syringe with precise dosage control for outpatient use.Design an improved, reusable syringe with precise dosage control for outpatient use. –Current product was too costly and inaccurate Seven criteria identified based on customer needsSeven criteria identified based on customer needs –Ease of handling, use and manufacture –Readability of dose settings and accuracy –Durability and portability Seven overall product concepts proposed (Exhibit 7-3, pp )Seven overall product concepts proposed (Exhibit 7-3, pp )

EDGE™ Concept Development & Selection Funnel Karl T. Ulrich and Steven D. Eppinger, 2008, Product Design and Development, Exhibit 7-4, Chapter 7, 4 th Edition, p. 128, Irwin McGraw-Hill

EDGE™ Screening Stage Prepare the Matrix – Pugh's METHODPrepare the Matrix – Pugh's METHOD –Criteria –Select Reference Concept Rate ConceptsRate Concepts –Scale (+ – 0) –Compare to Reference Concept Rank ConceptsRank Concepts Combine and ImproveCombine and Improve –Remove Bad Features –Combine Good Qualities Select Best ConceptsSelect Best Concepts –May Be More than One –Beware of Average Concepts Reflect on the ProcessReflect on the Process –Continuous Improvement Karl T. Ulrich and Steven D. Eppinger, 2008, Product Design and Development, Exhibits 7-3 and 7-5, Chapter 7, 4 th Edition, pp. 126 & 130, Irwin McGraw-Hill Concepts which made the first cut

EDGE™ Examples of Concept Generation Karl T. Ulrich and Steven D. Eppinger, 2008, Product Design and Development, Exhibit 7-3, Chapter 7, 4 th Edition, p. 126, Irwin McGraw-Hill Concepts need to be well-defined PRIOR to concept evaluation! (neither of these concepts made the screening cut)

EDGE™ Determine Criteria and Reference Concept In teams begin preparing the Matrix – Pugh's METHODIn teams begin preparing the Matrix – Pugh's METHOD –Establish a preliminary list of the subsystems which will involve a matrix for concept selection –Determine Selection Criteria for several of the above subsystems –Select a Reference Concept for each matrix

EDGE™ Screening Stage Pugh's METHODPugh's METHOD –Criteria –Select Reference Concept Rate ConceptsRate Concepts –Scale (+ – 0) –Compare to Reference Concept Rank ConceptsRank Concepts Combine and ImproveCombine and Improve –Remove Bad Features –Combine Good Qualities Select Best ConceptsSelect Best Concepts –May Be More than One –Beware of Average Concepts Reflect on the ProcessReflect on the Process –Continuous Improvement Karl T. Ulrich and Steven D. Eppinger, 2008, Product Design and Development, Exhibits 7-3 and 7-5, Chapter 7, 4 th Edition, pp. 126 & 130, Irwin McGraw-Hill Concepts which made the first cut BUT more refinement required before SCORING process

EDGE™ Identify “Winning” Concepts Karl T. Ulrich and Steven D. Eppinger, 2008, Product Design and Development, Exhibit 7-3, Chapter 7, 4 th Edition, p. 126, Irwin McGraw-Hill Concept A has highest net score and no “worse than” ratings

EDGE™ Combine Winning Concepts Karl T. Ulrich and Steven D. Eppinger, 2008, Product Design and Development, Exhibit 7-3 & 7-6, Chapter 7, 4 th Edition, pp. 127 & 133, Irwin McGraw-Hill Concepts D & F were combined to eliminate “worse than” ratings

EDGE™ Refine Winning Concepts Karl T. Ulrich and Steven D. Eppinger, 2008, Product Design and Development, Exhibit 7-3 & 7-6, Chapter 7, 4 th Edition, pp. 127 & 133, Irwin McGraw-Hill Concept G’s scored well but ease of handling was a problem, therefore revise!

EDGE™ Screening Stage for MSD I Project In teamsIn teams –Prepare the Concept Screening Matrix (Exhibit 7-5, p. 130) –Begin the following (and finish today!): Rate and Rank ConceptsRate and Rank Concepts Combine and ReviseCombine and Revise Select Best Concept(s)Select Best Concept(s) Proceed onto Concept Scoring ProcessProceed onto Concept Scoring Process

EDGE™ Concept Development & Selection Funnel Karl T. Ulrich and Steven D. Eppinger, 2008, Product Design and Development, Exhibit 7-4, Chapter 7, 4 th Edition, p. 128, Irwin McGraw-Hill

EDGE™ Scoring Stage REFINE Pugh’s MatrixREFINE Pugh’s Matrix –Criteria –ADD Weightings Rate ConceptsRate Concepts –REFINE Scale (1 - 5) –Select “Average” Criteria for Reference –Compare to Reference Criteria Rank ConceptsRank Concepts –Sum Weighted Scores Combine and ImproveCombine and Improve –Remove Bad Features –Combine Good Qualities Select Best ConceptsSelect Best Concepts –May Be More than One Reflect on the ProcessReflect on the Process –Continuous Improvement Karl T. Ulrich and Steven D. Eppinger, 2008, Product Design and Development, Exhibit 7-7, Chapter 7, 4 th Edition, p. 134, Irwin McGraw-Hill

EDGE™ Example: Concept Scoring Example: Concept Scoring Karl T. Ulrich and Steven D. Eppinger, 2008, Product Design and Development, Exhibit 7-7, Chapter 7, 4 th Edition, p. 134, Irwin McGraw-Hill Generated from Customer Needs – week 1 Need to revisit PUGH Matrix as your team’s knowledge base expands

EDGE™ Final Winning Concept - DF Karl T. Ulrich and Steven D. Eppinger, 2008, Product Design and Development, Exhibit 7-6, Chapter 7, 4 th Edition, p. 133, Irwin McGraw-Hill Concept DF was selected as the winning concept HOWEVER: Do not simply select concept was highest rating – conduct a sensitivity study by varying weights and ratings and examine effect on winning concept rating. Does uncertainty about a particular value have a large impact on the winning concept? Team could have decided to go with top two (or more) concepts. Concepts could be prototyped and tested for customer feedback.

EDGE™ Tips for Concept Development & Selection When possible, use objective rather subjective criteriaWhen possible, use objective rather subjective criteria Useful to identify strengths of concepts that do not make it through screening/scoring stages – could these be incorporated on winning concept(s)?Useful to identify strengths of concepts that do not make it through screening/scoring stages – could these be incorporated on winning concept(s)? Include ease of manufacture, reduced liability, and/or cost as criteriaInclude ease of manufacture, reduced liability, and/or cost as criteria Use concept development & selection process throughout MSD I and MSD IIUse concept development & selection process throughout MSD I and MSD II

EDGE™ Concept Development & Selection Funnel Karl T. Ulrich and Steven D. Eppinger, 2008, Product Design and Development, Exhibit 7-4, Chapter 7, 4 th Edition, p. 128, Irwin McGraw-Hill

EDGE™ Test Product Concepts Perform Economic Analysis Benchmark Competitive Products Build and Test Models and Prototypes Identify Customer Needs Establish Target Specifications Generate Product Concepts Select Product Concept(s) Set Final Specifications Plan Downstream Development Mission Statement Test Product Concept(s) Development Plan Karl T. Ulrich and Steven D. Eppinger, 2008, Product Design and Development, Exhibit 8-2, Chapter 8, 4 th Edition, p. 146, Irwin McGraw-Hill Helps in further exploring concepts… Which concept should be pursued? How can the concept be improved to better meet customer needs? Should development continue? TOOL: Survey customer response, refer to Chapter 8 for more details

EDGE™ Practice Concept Development & Selection on MSD I Project Continue Team Screening Stage and start Scoring StageContinue Team Screening Stage and start Scoring Stage Prepare/Refine the Matrix Rate Concepts Rank Concepts Combine and Improve Select Best Concept Reflect on the Process Screening and Scoring Stages Screening and Scoring Stages Sample Excel Spreadsheet Available for PUGH

EDGE™ Next Steps…. Start with Concepts Associated with Critical Sub-function(s)Start with Concepts Associated with Critical Sub-function(s) –Develop Pugh's Matrix for SCREENING Process Create Criteria, Select Reference Concept, Rate Concepts (Scale (+ – 0)), Compare to Reference Concepts, Rank Concepts,Create Criteria, Select Reference Concept, Rate Concepts (Scale (+ – 0)), Compare to Reference Concepts, Rank Concepts, Combine and Improve, Remove Bad Features, Combine Good Qualities, Select Best ConceptsCombine and Improve, Remove Bad Features, Combine Good Qualities, Select Best Concepts Refer to Exhibit 7-5Refer to Exhibit 7-5 –Refine Pugh's Matrix during SCORING Process Refine Criteria, ADD Weightings, Rate Concepts (Scale (1 - 5)), Select “Average” Criteria for Reference, Determine Sum Weighted ScoresRefine Criteria, ADD Weightings, Rate Concepts (Scale (1 - 5)), Select “Average” Criteria for Reference, Determine Sum Weighted Scores Combine and Improve, Remove Bad Features, Combine Good Qualities, Select Best ConceptsCombine and Improve, Remove Bad Features, Combine Good Qualities, Select Best Concepts Refer to Exhibit 7-7Refer to Exhibit 7-7 –Get customer feedback, if possible