Early detection of Tube Support Degradation in Feedwater Heaters Presentation to the 2013 Feedwater System Reliability Improvement Meeting January 21-24,

Slides:



Advertisements
Similar presentations
A computer uses electric current to process information.
Advertisements

OFF DESIGN PERFORMANCE PREDICTION OF STEAM TURBINES
Microbiological Validation
Chapter 4 DC to AC Conversion (INVERTER)
Testing steam traps using airborne ultrasound inspection
Material Tour of Boiler - Catastrophic Failures of Boiler Components Presented by George W Galanes, P.E. Metallurgical Consulting Engineer Diamond Technical.
HATCH UNIT 1 CONDENSER HOTWELL DAMAGE & LONG CYCLE CLEANUP VALVE LEAKAGE FORCED OUTAGES JAN 2013 & OCT 2013.
Basic Principles of the Eddy Current Inspection Technique
Feedwater System Reliability Users Group 2015 Meeting San Antonio James Alston – South Texas Project Rob Frazee – South Texas Project Frank Todd – True.
Module 3 UNIT I " Copyright 2002, Information Spectrum, Inc. All Rights Reserved." INTRODUCTION TO RCM RCM TERMINOLOGY AND CONCEPTS.
Chapter 1 VAPOR AND COMBINED POWER CYCLES
1 Heat Exchangers. Standards of Conduct in Training 2.
Walter G Bischoff Brunswick station Duke Energy
PRINCIPLES OF MEASUREMENT AND INSTRUMENTATION EKT 112
Impression-Die Forging (cont’d) F=K p Y f A –K p – presure multiplying factor Simple shapes (without flash): 3-5 Simple shapes (with flash): 5-8 Complex.
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO RISK IDENTIFICATION 2.
A Train of Closed Feed Water Heaters A Trade off between Irreversibility and Reliability !!! P M V Subbarao Professor Mechanical Engineering Department.
Lesson 15 Heat Exchangers DESCRIBE the difference in the temperature profiles for counter-flow and parallel flow heat exchangers. DESCRIBE the differences.
Ultrasonic Testing This technique is used for the detection of internal surface (particularly distant surface) defects in sound conducting.
Classification of Instruments :
NEIL Requirements for Testing of FWH Electrical Equipment and AOV’s.
Feedwater Systems Reliability Users Group Annual Meeting January 20-23, 2014 Feedwater Pump Thrust Bearing Failure Presented By: Kurt J. Weis Rotating.
Chapter 7 SYSTEM PROTECTION
Shell and Tube Heat Exchangers
Exergy Analysis of STHE P M V Subbarao Professor Mechanical Engineering Department I I T Delhi Formalization of Thermo-economics…..
Introduction: True North Consulting, LLC Phone (970)
MineralScan Fill Level Signal Examples & Explanations - RNMC Introduction The MineralScan MillSlicer system normally consists of two fixed vibration sensors.
INFO 637Lecture #81 Software Engineering Process II Integration and System Testing INFO 637 Glenn Booker.
FSRUG Presentation – January 2014 Tennessee Valley Authority Browns Ferry Nuclear Plant Unit 3 Reactor Feed Water (FW) Clean Up Piping Break.
Feedwater System Reliability Users Group – 2012 Meeting Power Uprates & Feedwater Heaters 1.
Software Inspection A basic tool for defect removal A basic tool for defect removal Urgent need for QA and removal can be supported by inspection Urgent.
Chapter 10 VAPOR AND COMBINED POWER CYCLES
In Chapter 4: Budgeting the Project Budgeting: the process of forecasting what resources the project will require. Cost estimating process: evaluating.
FORGING DIES Proper die design is important in the success of a forging operation. Parts to be forged must be designed based on knowledge of the principles.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
Statistical Process Control04/03/961 What is Variation? Less Variation = Higher Quality.
UNIVERSAL HORIZONTAL ANALYZER (HA2500) TRAINING. HA2500 Universal Horizontal Analyzer.
1 Project Quality Management QA and QC Tools & Techniques Lec#10 Ghazala Amin.
Hardware Preventative Maintenance: Eliminating issues, extending longevity, and ensuring quality hardware.
Presented by: Timothy S. Irwin, P.E. Senior Mechanical Engineer
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
William Prosser April 15, Introduction to Probability of Detection (POD) for Nondestructive Evaluation (NDE) This briefing is for status only and.
The Big Picture Things to think about What different ways are there to collect information automatically? What are the advantages and disadvantages of.
STEP 1 Locate the transmission cooler line connection on the vehicle. Identify the correct adapters to be used by referring to the vehicle application.
Failure Modes, Effects and Criticality Analysis
Chalmers University of Technology Advanced NDT Mathematical modelling of the ultrasonic phased array technique within the project Quantification of the.
4/28/2017 Stress Corrosion Cracking Assessment in Pipeline Mohammed Abu Four October 11, 2010.
A Predictive Maintenance Strategy based on Real-Time Systems
Root Cause Analysis Roger Brauninger
REFINARY & PETROCHEMICAL
Review Questions Chapter 5
Heat Exchangers and Condensers
In-feed and Amine Sweetening 11/4/09
Objectives Evaluate the performance of gas power cycles for which the working fluid remains a gas throughout the entire cycle. Analyze vapor power.
Thermodynamics Cycles.
CINEMA System Engineering
Simple Thermal Power Plant
TOPIC:- VAPOUR CYCLES CREATED BY:
Mild Environment Qualification and Maintenance
Fundamentals of Statistical Process Control
2012 Operating Experience for Feedwater and Related Systems
WHAT IS HX……??? Heat exchangers are equipment that transfer
Operations Management
Process Equipment Design and Heuristics – Heat Exchangers
A Train of Closed Feed Water Heaters
Timeline of Key Events B&W Safety Assessment Indicates Head Inspection Being Performed, Sources of Leaks Identified, No Other Inspections Required D-B.
A computer uses electric current to process information.
Operations Management
Unit I Module 3 - RCM Terminology and Concepts
Presentation transcript:

Early detection of Tube Support Degradation in Feedwater Heaters Presentation to the 2013 Feedwater System Reliability Improvement Meeting January 21-24, 2013 Presented By: Steven Schaefer Authored By: Steven Schaefer & Jacob Endres

INTRODUCTION What is ‘Tube Support Degradation’ ? Erosion of the carbon steel tube support(s) in Feedwater Heaters What causes Tube Support Degradation ? Steam passing between the tube OD and the TSP hole ID Why is important that it is identified early? Large numbers of tubes can be left unsupported which can lead to multiple failures from fatigue or a plant excursion Involves Costly and Timely design review, procurement and replacement Can identify associated damage to FWH shell which could lead to catastrophic failure How is it typically first identified? When the TSP signals are almost totally missing What are the precursors that can be identified early? TSP signals at the same axial location that appear to be smaller then normal Low Frequency absolute deposit signals on one side of the TSP 2

Goals of Tubing Inspection Primary Goals Condition Assessment Condition of each tube inspected Condition of the overall HX Component Reliability & Operability Identify potential failures before they occur to ensure continuous operation between inspections Not only for the next cycle but more importantly for long term operation Challenges Probability of Detection (POD) Sizing Accuracy Schedule Cost 3

Standard Inspection Technique - Bobbin Multifrequency Bobbin Coil Inspection Advantages Inspection Speed (as high as 80ips) Cost Basic equipment and software High sensitivity & POD for ‘Typical’ damage mechanisms Dis-Advantages Detection of Circumferential Cracking Accurate sizing of certain volumetric conditions 4

Detection Of TSP Degradation Early Signs That Identify TSP Degradation/Erosion May Be Present Changes from Nominal TSP Signatures on Low Frequency Absolute Channel A Change or Shift of the phase angle of the TSP signal Lower Amplitude (voltage) TSP signatures identified on Low Frequency Absolute Low Sensitivity strip chart In extreme cases, a completely missing TSP signal where one is expected Deposit like drift on either side of the TSP signal Any of the above occurring repeatedly at the same axial TSP location in one area, usually near an extraction steam inlet or drain cooler inlet May be found in the condensing zone or the drain cooler May be found in Low, Intermediate or High Pressure FWH’s Eroded pieces of internals, such as tie rod shrouds, found in the heater drain or down steam from the FWH drain FWH shell erosion near the extraction steam inlet(s) 5

Accurate Sizing Of TSP Degradation Sizing of TSP erosion with Bobbin Probe Technique There is no accurate sizing technique possible with Standard Bobbin Probe Technique This is due to the amount and proximity of the remaining TSP material to the tube OD, the type of erosion (straight cut or tapered) and the amount of deposits near or under the TSP In extreme cases a piece of the remaining ligament can be all that is in contact giving a false indication of actual ‘Support’ from a TSP The TSP signal amplitudes can be documented and categorized by voltage for comparison with future inspections but only for general trending Array Coil Technology is being developed for a more accurate measurement technique While this could give a more accurate sizing technique it will mean additional cost, analysis and schedule time that must be built into the budget and outage schedule 6

Typical Bobbin Coil 7

Bobbin Coil Sensitivity 8

Eroded Areas Around Tubes 9

10

Eroded Areas Around Tubes 11

Tubesheet Map of Erosion at TSP Horizontal U-Tubed single zone FWH with extraction steam inlets at 12 o’clock. The red tubes indicate tubes recording possible TSP degradation while the blue tubes were inspected with no damage of any type recorded. 12

Internals Drawing of Erosion at TSP 13

ET Response of Nominal TSP 14

ET Response of Eroded TSP 15

ET Signal Response Variations Proximity of Tube OD and actual TSP hole 16

ET Signal Response Variations Remnants of TSP ligaments that can give small but false signals of supports 17

ET Signal Response Variations Large amounts of deposits or magnetite can alter ET response 18

Early Detection is Critical Allows for early planning of FWH replacement or temporary repairs Plan more frequent inspections to trend TSP signals Indicates present FWH design may not be adequate for steam flow Review FWH specifications vs. design steam flow Review flows associated with power up-rate (past, present & future) Indicates higher potential for tube failure(s) Unsupported spans can lead to tube failure from fatigue over time Unexpected event like a plant trip or water hammer can lead to multiple tube failures at one time Indicates FWH shell has high potential for erosion and failure Shell should be inspected for thinning with UT in areas of TSP erosion and near extraction steam inlets If TSP erosion is in the drain cooler FWH level may be operating below desired level Review of operational data to determine typical operational level Verify level indicator is operating correctly and is accurate Drain cooler snorkel could be damaged or improperly designed Drain cooler end plate holes could be eroded and allowing steam intrusion 19

Reporting of TSP Degradation As stated earlier, TSP hole sizing is inaccurate with standard bobbin probe technique Signal amplitude changes with proximity to TSP or remnants of TSP Simple trending by percent of full nominal response by 100%, 80%, 60%, 40%, 20% and <20% of signal voltage This gives a simple signal voltage % to track overall TSP condition Example: Nominal TSP somewhere near the middle of the bundle is set to volts then: 9.00 volts and greater = 100%, 7.00 to 8.99 volts = 80%, 5.00 to 6.99 volts = 60%, 3.00 to 4.99 volts = 40%, 1.00 to 2.99 volts = 20% & <1.00 volts = <20%; this allows a tolerance and gives a general condition Again, this is a general condition and your actual mileage may vary, but it allows for trending and assessing the overall stage of progression and the ability to set a timetable for replacement or immediate repairs until a replacement can be completed 20

TSP Erosion Sized by General Percent Actual Inspection with TSP degradation quantified by general percent 21

Autopsy of FWH - Inverted 22

ET Response vs. Actual TSP Actual ET results utilizing general voltage percent Actual removed TSP from Drain Cooler 23

Tube-Pro 3D Modeling 24 Single Zone Feedwater Heater with two Extraction Steam Inlets Impingement Plates Below Extraction Steam Inlets

Tube-Pro 3D Modeling 25 Single Zone Feedwater Heater with two Extraction Steam Inlets Tubes with TSP Degradation Identified on Tubesheet

Tube-Pro 3D Modeling 26 Single Zone Feedwater Heater with two Extraction Steam Inlets Locations at Tube Supports that indicated TSP Degradation

Tube-Pro 3D Modeling 27 Single Zone Feedwater Heater with two Extraction Steam Inlets Close up of area showing TSP Degradation

Summary What is ‘Tube Support Degradation’ ? Erosion of the carbon steel tube support(s) in Feedwater Heaters. What causes Tube Support Degradation ? Steam passing between the tube OD and the TSP hole ID. Why is important that it is identified early? Large numbers of tubes can be left unsupported which can lead to multiple failures from fatigue or a plant excursion Involves Costly and Timely design review, procurement and replacement Can Identify associated damage to FWH shell which could lead to catastrophic failure How is it typically first identified? When the TSP signals are almost totally missing. What are the precursors that can be identified early? TSP signals at the same axial location that appear to be smaller then normal. Low Frequency absolute deposit signals on one side of the TSP. 28

References Some pictures and slides were used with permission of the author from a previous presentation Titled: “Comparison of Degraded Baffle Signal Methodology to Actual Degraded Baffles – Results in: a Better Methodology”, Perry Holzman, 2010 EPRI BOP HX NDE Conference 29

Steven Schaefer Manager, BOP Services ET Level III QDA, ASNT ET III BOP Anatec Division Phone: Mobile: Jacob Endres Project Manager ET Level III QDA Anatec Division Phone: Mobile: Darren Howe Vice President ET Level III QDA Anatec Division Phone: x202 Mobile: Chris J. Speas V. P. - Business Development ET Level III QDA, ASNT ET III Anatec-LMT Phone: x302 Mobile: For Additional Information 30

Early detection of Tube Support Degradation in Feedwater Heaters Presentation to the 2013 Feedwater System Reliability Improvement Meeting January 21-24, 2013 Presented By: Steven Schaefer Authored By: Steven Schaefer & Jacob Endres