TE/MPE/EE Presentation to MPE at TM #52 on 27.03.2014 K. Dahlerup-Petersen TE/MPE/EE – 23.03.2014 System Upgrades and Individual System Tests of the 13.

Slides:



Advertisements
Similar presentations
1 Powering Tests and Safety Electrical Safety Hugues Thiesen Power Converter Group.
Advertisements

LHC UPS Systems and Configurations: Changes during the LS1 V. Chareyre / EN-EL LHC Beam Operation Committee 11 February 2014 EDMS No /02/2014.
Status Report related to Testing, Installation, Commissioning and Operation of the Capacitive Snubber Circuits in the LHC Main Circuits – April
58 th MPE-TM – October 2, 2014 G.J. Coelingh, TE-MPE-EE Long Shutdown 1 Status Report Energy Extraction Systems On behalf of all EE teams involved.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) - Review.
TE-MPE-EE, 16-Apr CLIQ Power supply design J. Mourao TE-MPE-EE.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
Upgrade of the Breakers Control Module in 13 kA EE systems Bozhidar Panev TE-MPE-EE
Upgrade, IST and Powering tests of the 13kA Energy Extraction system Bozhidar Panev – LS1 Review.
41 st LSC – March 21, 2014 G.J. Coelingh, TE-MPE-EE Long Shutdown 1 Status Report The upgrade of 600 A Energy Extraction Systems.
Upgrades and Activities of 13kA EE systems during LS1 Bozhidar Panev TE-MPE-EE
C E L E B R A T I O N LS1 COLLABORATION SEMINAR Thursday 27 November 2014 We commemorate today: - 9 years (already) of an extraordinary scientific/technical.
How to achieve higher redundancy of the UPS for QPS ? -The lack of redundancy concerns the supply lines from UPS to consumer but equally parts of the UPS.
TE/MPE/EE Presentation to MPE at TM #52 on K. Dahlerup-Petersen TE/MPE/EE – Individual System Tests of the 13 kA Energy Extraction.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
Becoming familiar with QPS systems in the LHC (incl. EE) Presentation 02 Sept PART 1 of 3. Part 1: General layouts and principles Presentation of.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
Overview of the CLIQ Units Project
Update and status for the Work Unit ‘Energy Extraction’ - equipping the three test benches for series testing of Super-FRS Dipoles D2, D3, D4 and Quadrupoles.
TE-MPE LS1 review 02/06/2015, Mateusz Bednarek, TE/MPE-EE ELQA during LS1 – the “unexpected” activities New developments Exceptional NCs Other tests.
TE/MPE/EE J. Mourao T/MPE/EE 23 December 2012 LHC Machine Redundant Power supply (DQLPUR) & interface Module (DQLIM) assembling during LS1.
TE/MPE/EE Short ‘Halfway’ Update ELQA – LS1 Activities MPE/The Electrical Engineering section Knud, on behalf of TE/MPE/EE – 20 September LSC Reminder:
Training LHC Powering R. Denz Quench Protection System R. Denz AT-MEL.
AT-MEL-PM, R. Denz, CERN, CH-1211 Geneva 23 1 QPS system and its risks  Principal risks  General remarks  Quench heater circuits  Quench detection.
MPP Meeting Sandor Feher Inner Triplet Powering Should include the IR quads and the DFBX especially the power leads. DFBX commissioning doc was.
MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems.
13 kA Energy Extraction LHC machine Gert Jan Coelingh – Knud Dahlerup-Petersen – TE/MPE/EE.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
Essential lessons from commissioning of the 28 EE systems of LHC sector A corrector circuits.
TE-MPE-EP New DQLPU type A Production of 1300 new protection units TE-MPE-EP, VF, 23-Nov-2012.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
TE/MPE activities currently planed for YETS Reiner Denz, Knud Dalherup-Petersen, Markus Zerlauth & Bruno Puccio YETS coordination meeting.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
Quench Detection System R. Denz TE-MPE-EP on behalf of the QPS team.
TE/MPE/EE Summary of Electrical Engineering Session Ed & Knud K. Dahlerup-Petersen TE/MPE/EE 23 November RB – RQ EE facility consolidation & upgrades.
[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] HWC Workshop ( ) Consolidation and major changes that have impact on the powering circuits.
MPE Workshop for LS1 / 22 & 23 Nov. 2012, G. D’Angelo TE/MPE-EE ELQA during LS1 train, Special measurements and NCs Magnet replacement: AIV Splices consolidations:
TE-MPE LS1 workshop – November 22-23, 2012 G.J. Coelingh TE-MPE-EE LS1 The upgrade of 600 A ENERGY EXTRACTION SYSTEMS.
B.Puccio MPE Workshop for LS1 / 22 & 23 Nov Logistics for DYPB activities Bruno PUCCIO (TE/MPE)
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
E.Sbrissa EP/TA3 - IC ATLAS EDR_MAG Magnet Project Fault analysis, QA & Failure rate.
TE-MPE, MPE Workshop 2010, G.D’Angelo, 14-Dec TE-MPE on-call service for the LHC Giorgio D’Angelo on behalf of TE-MPE On call team, with inputs.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
Felix Rodriguez Mateos TE/MPE-EE 2 Electrical Performance of LHC Magnet Circuits F. Rodriguez Mateos, TE/MPE-EE Chamonix 2016 Session 3: LHC Hardware.
The Large Hadron Collider The 19 th Sep 2008 incident [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] NIKHEF Seminar ( )
TE/MPE/ee Highlights from the Activities of the MPE/Electrical Engineering Section during 2015 K. Dahlerup-Petersen TE/MPE/ee – 11 December 2015 LHC Machine.
Machine Protection Review, Markus Zerlauth, 12 th April Magnet powering system and beam dump requests Markus Zerlauth, AB-CO-IN.
EDMS N° V.1 TE-EPC Activities during LS1 V. Montabonnet [TE-EPC]
Hardware Commissioning Review, R. Denz, 12-May Superconducting circuits: what remains to be done during hardware commissioning R. Denz AT-MEL-PM.
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
Mikhail Ovsienko TE-MPE-EE
Power Supply and Energy Extraction System for the CBM magnet
The Survey of the Power Supply Reliability at SSRF
Giorgio on behalf of ELQA team
Design of new generation CLIQ units (CLIQ2)
RELIABILITY OF 600 A ENERGY EXTRACTION SYSTEMS
Powering the LHC Magnets
MPE main activities planned for LS2
LHC Quench Protection System
Powering from short circuit tests up to nominal
CLIQ Coupling Loss Units & HDS Quench Heater Discharge Supplies - a short description of these safety-critical components for LHC machine protection.
LS1 TE/MPE/EE CABLE ACTIVITIES
Re-Commissioning (IST) of Electrical Systems: QPS, EE & PIC
Power Supply and Energy Extraction System for the CBM magnet
Hardware Commissioning
Review of hardware commissioning
Other arguments to train two sectors to 7 TeV
Presentation transcript:

TE/MPE/EE Presentation to MPE at TM #52 on K. Dahlerup-Petersen TE/MPE/EE – System Upgrades and Individual System Tests of the 13 kA Energy Extraction Facilities - related to LS1 Agenda: 1.Setting the scene: Short introduction to the system and fault statistics from operation. Knud - 8 mins. 2.Upgrades applied to the DQS extraction switches. Mikhail Ovsienko (IHEP, Russia) - 15 mins. 3.Upgrades applied to the DQRB energy absorbers. Marek Ciechanowski (AGH, Poland) - 10 mins. 4.Upgrades applied to the DJPC switch control systems. Bozhidar Panev (AGH, Poland) - 10 mins. 5.The IST Test Program. Sandor Feher (FNAL, IL, USA) - 10 mins. 6.MPE participation in the Thermal Validation (heat runs). Edward Nowak (AGH, Poland) and Steven Pemberton - 10 mins. 7.Closing Remarks. Knud - 5 mins. 1/6

TE/MPE/EE Presentation to MPE at TM #52 on K. Dahlerup-Petersen TE/MPE/EE – The LHC machine deploys 32 such extraction systems in the 24 superconducting Main Powering Circuits. They are safety critical for the safeguard of the main dipole and quadrupole circuits. One system consists of: The combined extractions switch with bus system - top view. Individual dc breaker 4.5 kA, 1500 VDC EnergoMash, Ekaterinburg Power bus for improved current balance. BINP Novosibirsk Powering and controls cabinet (DJPC) ECIL, Hyderabad, India Snubber capacitance across the switches for arc suppression / commutation assistance Electronicon, DE Interface module for signal dispatch and local controls EFACEC, PT DQSQF/D enclosure for noise reduction and safety IHEP, Protvino, RU Three dipole extraction resistors, each rated 430 MJ, assures the safe deposit of the stored energy. In total 48 such absorbers. IHEP, Protvino, RU Quadrupole extraction resistors, 24 MJ each IHEP, Protvino, RU DQRCS Cooling station for three DQRB’s ‘Roese’, DE DQR control circuits (Morosov) BINP, Novosibirsk 2/6

TE/MPE/EE Presentation to MPE at TM #52 on K. Dahlerup-Petersen TE/MPE/EE – LS1 intervention plan: 1.Installation and connection of snubber capacitors and their associate fuse protection across the DQSQ switches in all main quad. circuits - for voltage transient suppression during commutation. 2.Installation and connection of new arc chambers with higher voltage rating (1050 VDC) on the quadrupole extraction switches - as replacement of the existing 200 V version (sectors 12 & 23 were already equipped during TS’s in 2012). 3.Mechanical modifications to all 48 (+spares) DQRQ extraction resistors in the main dipole circuit. Will prevent damage and short-circuit of a part of the resistor body in the case of double energy deposit (i.e. A hypothetical non-opening of one of the two EE facilities in a sector). 4.Replacement of the ailing and drifting, Curie-temperature based thermostats on the DQRB’s by a bimetal type with higher switching point (80  C). 5.Replacement in all 64 switch controller units (DJPC) of the power switching relays which are judged too weak for a reliable protection of the breaker ‘holding’ coils. The new version has higher current rating and AgSnO2 hardened contact surfaces. 6.Re-configuration of all DQR’s, back to the origin (2 x 70 mΩ for dipole circuits and 7.7 mΩ/6.6 mΩ for quads). 7.Relocation of EE components in LHC points 1 and 5 (both sides): DQRB#3 moved in P1 and DQRCS installed on DQRB#1 in P5. 8.General preventive maintenance program applied to all 32 switch facilities, with gap and pressure adjustments, cleaning of main & arcing contacts, delay measurements and µ- switch checks. 9.Complete verifications of all bolted contacts and of all multi-pin connectors in all elements. 3/6

TE/MPE/EE Presentation to MPE at TM #52 on K. Dahlerup-Petersen TE/MPE/EE – /6 IST test plan applicable to each of the 32 complete systems, however with reduced program in the odd points: Note: An important part of the measurements and validations can (evidently) only be performed after connection of the cold magnet chain. Program: 1. HVQ -with PC disconnected and safety measures applied at DFBA and PC in case that the cooled cables are connected to the EE system. 2. Functional Tests (no dc current through the system) using dummy quench loop source. Local controls through dedicated Labview application similar to ‘QPSExpert’ and communication link to the DQAMS – RS IST with dc currents up to 13 kA - with separate interlock line to PC. In odd points replaced by testing to 600 A. 4. Participation in the thermal validation runs, 13 kA, min hours – where applicable (P4L, P6R+L, P8R+L). 5. Hardware commissioning with participation of a QPS expert in CCC and two field teams for tunnel interventions. Note: The order is of importance (example: HV application during 1 can, in particular in case of breakdowns, cause damage to the electronics). Safety: Tests are always performed with observation/application of the strict rules of condemnation/consignation - with no deviations, no derogations w.r.t. the baseline rule that only the person in possession of the ‘Test Authorization’ (yellow sheet from G. Pastor) are entitled to power the circuit. This is valid also for the HVQ.

TE/MPE/EE Presentation to MPE at TM #52 on K. Dahlerup-Petersen TE/MPE/EE – /6 Draft of test program – now being probed through IST in P6.

TE/MPE/EE Presentation to MPE at TM #52 on K. Dahlerup-Petersen TE/MPE/EE – /6 Fault Statistics – all 32 systems, 2010, 2011 & Source: MPE on-call intervention team TYPE of FaultsNumberRemarks OPENING FAULTS0Any other number than 0 would be unacceptable Faults linked to the SYSTEM REDUNDANCY in the opening process 0Any other number than 0 would be worrying Faults affecting SYSTEM AVAILABILITY (CLOSING problems, SPURIOUS openings, etc.) 15*This number must be improved! Note: A number of spurious openings were never reported to the MPE on-call team, therefore not included in this statistics. For RB,UA67 at least 11 such spurious openings occurred. Year Number of faults affecting availability 1023 Faults mainly had their origin in auxiliary equipment (µ-switches, relays, fans, cooling station, L.V. power supply) but also due to items sucked-into the breaker, defect contacts, visit of rat and damage to two holding coils)

TE/MPE/EE Presentation to MPE at TM #52 on K. Dahlerup-Petersen TE/MPE/EE – /6 Presentation of the teams LS1 Upgrades: TEAM 1 (IHEP, Russian experts):TEAM 2 (AGH/UST Poland, specific missions + in training): Mikhail OvsienkoMarek Ciechanowski Sergei AvramenkoMaciej Kosik Alexander PushkarevTadeusz Jeziorek Viktor IaichkovStanislav Cyganik Pawel Baran Mariusz Blaszczyk Bozhidar Panev Supporting team (mainly CERN, all part-time): Mathieu Favre, Grzegorz Seweryn, Steven Pemberton, Joaquim Mourao, Felix Rodriguez Mateos, Yan Bastian, Edward Nowak, Pawel Dubert and Sandor Feher. IST (needs permanent staffing of 2 x 3 people, 1 shift/day): Bozhidar Panev, Mikhail Ovsienko, Alexander Pushkarev, Joaquim Mourao, Sandor Feher, Aleksander Skala, Edward Nowak, Pawel Dubert, Mathieu Favre. Planning and coordination: Felix Rodrigues Mateos and Knud. Thermal validation (heat) runs: Steven Pemberton, Grzegorz Seweryn, Edward Nowak, Pawel Dubert, Katarzyna Turaj, Anna Braczek, Bozhidar Panev and Krzysztof Baran. HWC: CCC staff: Bozhidar Panev, Aleksander Skala, Alexander Erokhin, Sandor Feher, Edward Nowak, Anupama, Viraj, Yogendra and Barapatre. Two Field Teams of 4 people: Mathieu Favre, Yan Bastian, Joaquim Mourao, Grzegorz Seweryn, Steven Pemberton, Pawel Dubert, Krzysztof Baran, Mikhail Ovsienko, Alexander Pushkarev, Marek Ciechanowski and Macej Kosik.