ESCL Annual Conference Stockholm 25 August 2006 Large Projects - Insurable to what Extent? What drives the premium? By Anders Lindberg, MSc CE, Vice President,

Slides:



Advertisements
Similar presentations
A Joint Code of Practice Objectives and Summary Presentation
Advertisements

CONTRACTORS’ ALL RISKS INSURANCE Rohana Alagiyage
Presented by BUSINESS INSURANCE FOR CONTRACTOR CANDIDATES EXPERTS IN FREELANCER & CONTRACTOR INSURANCE Tania Bowers.
Titulo de la Presentación The 5 th International Istanbul Insurance Conference LOSS PREVENTION AND RISK IMPROVEMENT HAKAN ILERI ISTANBUL, 3 rd October.
Contract Law 2014 NCHCA Education Series- January 23, 2014 Presented by Geoffrey Cantello, City of Ottawa and Ron Price, Rasmussen Starr Ruddy LLP.
WESTERN PALLET ASSOCIATION SAVING YOUR COMPANY FROM FIRE DISASTER Presented by SHAW SABEY & ASSOCIATES David Parry – Vice President.
Overview of VMIA IHEA Forum Monia Choudhary Mark Cleeve August 2013.
CAS Seminar on Ratemaking Whose Line Is It Anyway? Session COM-7 Boiler and Machinery Presented By: Christine L. Steben, CPCU, ARe Assistant Vice President.
Builder’s Risk - Claim Adjustment Challenges
Annual Conference 2008 Future Challenges for the Waste Management Industry Waste Framework Directive - Impact on the European Waste Management Industry.
Proudly supported by: Procurement Challenges “Perspectives on Insurance” Simon Gray State Manager NSW/ACT Planned Cover.
PLURAL AGENCIES LTD INSURANCE BROKERS FOR THE ASSOCIATION OF PROFESSIONAL ENGINEERS OF SAINT LUCIA.
1 Construction Engineering 221 Construction Insurance.
Casualty Loss Reserve Seminar September 23-24, 2002 Surety Bonds – A General Overview By Richard Meyerholz Vice President Underwriting.
Surety Bonding Basics by Eduardo José Paternoster Vice President – Director St Paul Reinsurance.
Risk Management Construction Engineering 380. Risk Management Three types of risk need to be managed on construction/engineering projects –Financial or.
Chapter-06 Insurance company operations
Workshop 13 Design - Build Onerous Terms in D&C Agreements in Australasia Tony Barry, President Association of Consulting Engineers Australia.
Rashad Ahmadov, Ph.D CEO, Azerbaijan Industrial Insurance Company – Azerbaijan International Insurance Forum.
Session 311 Insurance “A promise of compensation for specific potential future losses in exchange for a periodic payment” Source: InvestorWords.com, 2003.
Aon Limited is authorised and regulated by the Financial Services Authority in respect of insurance mediation activities only. Annual International Nuclear.
 Hannover Re in Azerbaijan  Proportional vs. non-proportional  CAT XL Treaty  Multi-line combined per Risk / per Event XL Treaty Reinsurance Solutions.
INTERNATIONAL INSURANCE MEDIATION CONFERENCE Istanbul, March 2011 INTERNATIONAL INSURANCE MEDIATION CONFERENCE Istanbul, March 2011 George.
National Council of Self-Insurers 2014 Meeting Presented by Tom Hebson Vice President June 2, 2014.
Technical Control Bureau for Construction SECONED Technical Inspection Service AON Nazomermiddag 08 sept Delft.
Contract Pricing Methods Ch 2. Lump Sum –Contractor bids 1 price for entire project –Estimate needs to be detailed –Design needs to be finished before.
Hüseyin Arslan, LLM Legal Counsel ERGO Turkey. Hüseyin Arslan, LLM. “Insurance Arbitration [Turkish Practice]”  Insurance litigation in Turkey has long.
Disaster Risk Financing Global Approaches 11 August 2010 Reed Bouchelle, New Delhi.
April 11, 2007 Strengthening Communities Conference Managing Your Risks Ron Dennill Northern Communities Insurance Program.
World Bank Conference on Financing Disaster Risk, Washington, 2003 Catastrophe Risk Models for Asia from the User Perspective George Walker Head of Strategic.
Local Government Forum, 15 September 2010 Tender Negotiations, Indemnity and Exclusion of Liability Kathryn Walker Senior Associate (08)
November, 2000 Slide 1 Project Services Division RISK MANAGEMENT Project Services Division Presentation By: Adam Malkhassian November, 2000.
Siniša Lovrinčević, M.Sc. Advisor to the Management Board Reinsurance Company Sava Limited The Reinsurance Market in the Global Village of Changes A Slovenian.
Alternative Risk Transfer
“Silent Risks” Bassem Mesallam Vice President – Engineering Underwriting Oman Insurance Company.
Page 1 Recording of this session via any media type is strictly prohibited. Page 1 Megatrends Part 3: Natural Catastrophes and Climate Change - Stress.
Loss of Hire Anna F. Erlandsen – Norwegian Hull Club Oslo, 8th November 2013 The Nordic Association of Marine Insurers.
Development and Construction of On- Shore Windfarms Andrew Aveyard Green Cat Renewables Jim Wilkinson CA Blackwells.
Abcd Managing and measuring operational risk in an insurance company John Rowland Tillinghast General Insurance Spring Seminar May 2003 Scarman House.
Insurance. Premium Examples of Demographic Factors Considered in Premium calculation Life Insurance - Age Car Insurance – Gender Employee Insurance –
Commercial Matters Dublin Waste to Energy Project.
Role of the Reinsurance Industry in the Management of Catastrophe Related Risks Dr. Anselm Smolka Geo Risks Research Munich Reinsurance Company Global.
Managing man-made catastrophe risk: A market perspective CAS Special Interest Seminar on Catastrophe Risk Management Atlanta, 7 October 2002 Thomas Holzheu.
Liberty International Underwriters University of Houston Energy Case Study Steven P. Weiss, CPCU, AMIM, NAMS-CMS Vice President, Marine Engineering and.
REINSURING CLAUSES Ozlem Gurses University of Southampton.
Roumen Galabinov Chairman. Currently about 8% of the 3.6 million homes in Bulgaria are insured against natural disasters as earthquakes and floods. Although.
Contract Training Class I
State of Alabama Department of Finance Division of Risk Management Kim Huggins Claims Manager.
Budapest, Challenges and opportunities for the insurance sector on example of Polish market Piotr Wójcik Liability.
Aon’s 11 th Energy Insurance Training Seminar Markets and security Adam Barber-Murray.
World Bank Group Hazards of Nature, Risks and Opportunities for Development in South Asian Countries Regional Conference in New Delhi, India All About.
1 British Association of Private Security Companies Bernard de Haldevang, Financial & Political Risk Underwriter Atrium Syndicate 609 at Lloyd’s First.
Liberty International Underwriters University of Houston Energy Case Study Steven P. Weiss, CPCU, AMIM, NAMS-CMS Vice President, Marine Engineering and.
Casualty Actuarial Society 2002 Annual Meeting November 11, 2002 Surety Bonds – A General Overview By Richard Meyerholz Vice President Underwriting.
Accounting Implications of Finite Reinsurance Contracts 2003 Casualty Loss Reserve Seminar Chicago, IL Session 4 – Recent Developments in Finite Reinsurance.
1 Large infrastructure projects − dealing with the public sector ESCL Conference, August 25, 2006 Stuart Graham President and CEO, Skanska AB.
NASP 2009 Annual Conference. Advanced Subrogation: Roadblocks & Speed Bumps Harris E. Berenson, Esq., Liberty Mutual Insurance Company Samuel J. Pace,
Environmental Liability: Stuck in the Middle Presented by Justin Perry, Vice President and National Practice Leader Aon Risk Solutions, Environmental Services.
E&O Considerations for Coastal Agencies Exposures & Risk Management Corporate Solutions.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
Planning and Realisation of Wind Farms
Actuarial role/ contributions/ challenges in Reinsurance
RISK MANAGEMENT AND INSURANCE
PRACTICE OF REINSURANCE IN BANGLADESH 19th November 2016
RISK ASSESSMENT TOOL PREVIEW
CONDOMINIUM OWNERS FORUM
Hurricane Cat Modeling: Tightrope or Catwalk?
EC Flood action programme, Stakeholders' group meeting
Environmental Insurance available in Brazil
Presentation transcript:

ESCL Annual Conference Stockholm 25 August 2006 Large Projects - Insurable to what Extent? What drives the premium? By Anders Lindberg, MSc CE, Vice President, If P&C Insurance Ltd, Stockholm, Sweden

Anders Lindberg, If P&C Insurance2 If P&C:s definition of Large Projects Contract value to exceed EUR millions

Anders Lindberg, If P&C Insurance3 Large and Complicated Projects Type of projects Infrastructure Process Industry Power Generation Examples Bridges, Tunnels, Harbours Petrochemical plants, Steel Mills Gas Turbines, Waste Incineration

Anders Lindberg, If P&C Insurance4 Insurable to what extent?

Anders Lindberg, If P&C Insurance5 A general principle of Insurance To insure against loss or damage where the identified risks and exposures through professional Risk Assessment and Risk Management can not be eliminated or satisfactory mitigated.

Anders Lindberg, If P&C Insurance6 The Contract / Tender Documents Risks and Responsibilities –clearly and understandably defined? –clear and fair distribution between parties? Insurance Requirements –relevant and realistic? Time Schedule –realistic or tight? Information to Insurers –extensive and clear enough?

Anders Lindberg, If P&C Insurance7 Risks and Exposures to a Project Risk / Exposure  Physical damage  Time schedule delays  Damage to Third Party  Damage to the Environment  Design Errors  Financial losses  Performance Guarantees Insurable? yes no yes yes, sudden and accidental yes but limitations certain exposures only no

Anders Lindberg, If P&C Insurance8 What drives the premium for a specific Project? (p1 of 2) – Construction and Maintenance Periods – Contractors' experience and record – Risk Management Programme – The Insurance Market's experience – Extent of Insurance Cover requested – Sums Insured / Loss Limits – Potential for Large Losses – Level of Deductibles

Anders Lindberg, If P&C Insurance9 What drives the premium for a specific Project? (p2 of 2) Exposure  Type of Project  Size of Project  Prototypes  Location Geology Nat Cat exposures  Third Party Driving parameters Potential for large and/or frequent Losses Capacity requirements Unproven design, technology and/or material Rock and Soil conditions Storm, Flood, Earth Quake... Capacity shortage! Urban projects e.g. underground systems

Anders Lindberg, If P&C Insurance10 The Insurance Market for Large Projects (p1 of 5) Capacity - Infrastructure Projects of special concern –Tunnels and Underground works –Bridges –Road Construction –Wet works e.g. Harbours –Off shore installations e.g. Wind Turbines, Sea Cables

Anders Lindberg, If P&C Insurance11 The Insurance Market for Large Projects (p2 of 5)

Anders Lindberg, If P&C Insurance12 The Insurance Market for Large Projects (p3 of 5) Large Losses - example Singapore MRT spring 2004

Anders Lindberg, If P&C Insurance13 The Insurance Market for Large Projects (p4 of 5) Public Projects - Special Insurance Problems Public tender regulations –Reservations and/or deviations may not be accepted Consequence –Insurance requirements as per the tender documents can not always be met by the Insurance Market The Reality –Capacity is available with few exceptions, but extent of cover, deductibles and premium to be negotiated and agreed

Anders Lindberg, If P&C Insurance14 The Insurance Market for Large Projects (p5 of 5) Policy Wordings - Special Conditions Major Risks / Exposures – Restrictions of Cover and Loss Limits may be imposed Long and complicated projects – Review Clauses Risk Management Requirements – To be mentioned specifically: A Code of Practice for Risk Management of Tunnel Works C ompliance with this code is or will be a prerequisite for insurance cover of tunnel projects in all major markets

Anders Lindberg, If P&C Insurance15 The Players in the Insurance Market Brokers, Insurers, Reinsurers and Loss Adjustors always look for:  Experience and know-how  Capacity  Satisfactory Financial Rating (Insurers and Reinsurers)

Anders Lindberg, If P&C Insurance16 Sources for further information –IMIA, the International Association of Engineering Insurers –Insurers’ and Reinsurers’ publications e.g. Munich Re, Swiss Re –The Insurance Institute of London: Report of Advanced Study Group 208B, CONSTRUCTION INSURANCE