Gate 1 Input Criteria Objectives of Top Leadership Teams/CDR’s Intent Completed CBA Completed Service review of ICD Identification of mutually shared needs.

Slides:



Advertisements
Similar presentations
Roadmap for Sourcing Decision Review Board (DRB)
Advertisements

Introduction to the Joint Capabilities Integration and Development System (JCIDS) CAPT Keith Bowman, Joint Staff, J-8 Hello, I am Captain John Costello.
Global Positioning System (GPS) III Requirements Process
Identifying and Selecting Projects
1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
Phase B Exit Criteria Issues Resolved or Addressed Technical Reviews / Readiness Reviews, Audits Initiate Milestone C Program Review Planning Process Initiate.
NSS SMC/XR Template SMC April 2008; rev19 Program Management
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force AFRB MDD Template Rank, Name Office Symbol Date See footnotes on each.
“Common Process for Developing Briefings for Major Decision Points” INSTRUCTIONS Provide Feedback via to: Lois Harper PEO C4I and Space
Chemical Biological Defense Acquisition Initiatives Forum (CBDAIF)
CLR 252 Developing KPPs Note from SME:
Project Management Process Overview
DoD Acquisition Domain (Sourcing) (DADS) Analysis of Alternatives (AoA) E-Business/SPS Joint Users’ Conference November 15-19, 2004 Houston, TX.
UNCLASSIFIED Joint and Coalition Warfighting Mr. John Vinett March 2012 Technical Baseline Capability.
Gate Review Process presented at DODCAS 2009 DON Session CAPT Jim Baratta Deputy Director, NCCA.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force AFRB MDD Template Rank, Name Office Symbol Date See footnotes on each.
© MCR, LLC MCR Proprietary - Distribution Limited Earned Value Management Application, Guidance, and Education Neil F. Albert President/CEO MCR, LLC
Initiate Technology Development Finalize AoA Plan, AS, ICD, TDS, Develop CDD, and TEMP Initiate Milestone B Program Review Planning Process Initiate Acquisition.
RDA CHSENG, April 2009 DA HIEF YSTEMS NGINEER ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer Naval Probability of Program Success (PoPS)
1 [insert briefing type here] [insert program name here] for [insert name and organization of person(s) to be briefed here] [insert “month day, year” of.
UNCLASSIFIED CJCSI Revision Update CAPT Jeff Gernand, J-8 12 November 2002.
The Defense Acquisition Management System 2009 Implementing DoDI 5000
Joint Capabilities Integration and Development System (JCIDS) Nov 2010
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems The Integrated Master Plan (IMP) and the Integrated Master Schedule.
DOE Order 413.3A Program and Project Management for the Acquisition of Capital Assets Catherine Santana Deputy Director, Project Management Systems, OECM.
Life Cycle Logistics.
System Integration Exit Criteria Issues Resolved or Addressed Preliminary Design Review/Critical Design Review, Audits Initiate Design Readiness Review.
PEO C4I and SPACE FULL-RATE PRODUCTION REVIEW TIMELINE
Office of the Federal Coordinator for Meteorology OFCM Assessment of MPAR Capability to Meet Agency Needs Jud Stailey, OFCM Executive Secretary, MPAR EC.
Acquisition Process Improvements Training July 17, 2008 rev3 1 Acquisition Improvement The System Design Specification (SDS) Primer.
0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy.
CCA LSS Support Slides1 Draft The Defense Acquisition Management Framework. Post Implementation Review (PIR) Capability Needs Satisfaction & Benefits.
Materiel Development Decision (MDD) Information Requirements
Initiate User Needs And Technology Opportunities Finalize ICD, AoA Plan and Develop TDS Initiate Milestone A Program Review Planning Process Initiate Acquisition.
Strength through Industry & Technology How is the Government Managing for Value? Program Management Systems Committee March 11, 2007 The Voice of the Industrial.
DON Acquisition and Capabilities Guidebook. (22 Dec 03 Clean Draft)
Business, Cost Estimating & Financial Management Considerations
MORS Special Meeting: Risk, Trade Space, & Analytics for Acquisition
DoD Template for Application of TLCSM and PBL
Contracting (Product) Considerations
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Lesson Objectives Determine the key Requirements Manager activities and the role of the ICD leading up to the MDD and during Materiel Solution Analysis.
Lesson Objectives Determine the key Requirements Manager activities leading up to the MDD, the outputs of the MDD, and the Defense Acquisition documents.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities July 12, 2016.
System Engineering Considerations (See Chapters 3 and 9)
Life Cycle Logistics.
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities April 25, 2017.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities March 7, 2017.
MDD to Milestone A Requirements Management Activities
NSS SMC/XR Template SMC April 2008; rev19 Program Management
ISA 201 Intermediate Information Systems Acquisition
Materiel Solution Analysis (MSA) Phase
Production Considerations
Milestone A to Milestone B Requirements Management Activities
ISA 201 Intermediate Information Systems Acquisition
JTAMS PRE-MILESTONE B ANALYSIS
Test and Evaluation Considerations
AT&L Hot Topics in Acquisition
MDD to Milestone A Requirements Management Activities
Materiel Development Decision (MDD) to Milestone A (MS A)
Materiel Development Decision (MDD) to Milestone A (MS A)
Phase 2 Tollgate Review Discussion Template
Information Required for Milestone and Decision Reviews
CBA ICD CDD CDD CPD MDA MDA MDA MDA MDA AoA RVA RVA RVA
Product Support Considerations
International Acquisition and Exportability (IA&E) Considerations
Acquisition Improvement
Presentation transcript:

Gate 1 Input Criteria Objectives of Top Leadership Teams/CDR’s Intent Completed CBA Completed Service review of ICD Identification of mutually shared needs with foreign countries Goals/Exit Criteria Approval for ICD entry into Joint routing, or CNO/CMC routing Validation of AoA guidance, assumptions, & timeline and authorization for submittal to Director, PA&E (ACAT I & IA); or Approval of AoA guidance, assump-tions, & timeline (selected ACAT II) Approval to proceed to CD Determination of next Gate review Validate ICD & AoA Guidance, Authorize proceeding to CD Briefer: RO, prospective PM, and AoA Director

Gate 2 Input Criteria Approved ICD AoA Report Complete MS A documentation sufficiently mature for Senior Service leadership review Preferred alternative identified Goals/Exit Criteria Evaluation/ Validation of AoA Findings (see Exit Criteria template) Approve capability attri-butes of preferred alternative (Performance Parameters) recommendations 3. Approval to develop CDD & CONOPS with guidance & assumptions Satisfactory review of Program Health Approval to proceed to the next event (i.e., to Gate 3 or to MS A) Validate AoA results. Approve CONOPS, CDD Guidance, Authorize proceeding to Gate 3 or MS A Briefer: RO, prospective PM, and AoA Director

Gate 3 Input Criteria Approved AoA/AoA update Completed Service review of CDD & CONOPS Completed SDS Development Plan (including assessment of Critical Program Information and design for export) Goals/Exit Criteria Approval for CDD entry into Joint routing, or CNO/CMC routing Approval of CONOPS Validation of SDS Development Plan and determination of potential for export Satisfactory review of Program Health Approval to proceed to MS A or Gate 4 CDD/CONOPS Approval Briefer: RO and prospective PM

Gate 4 Input Criteria Approved CDD (for programs initiated at MS A, JROC approved CDD update) Service approved CONOPS Completed review of SDS Independent cost estimates, PM estimates, and available budget Goals/Exit Criteria Approved SDS (see Exit Criteria Template) Approval to proceed to Gate 5 or MS B (see Exit Criteria Template) Approval of Anti-Tamper Plan (domestic and foreign) Satisfactory review of Program Health (see Exit Criteria Template) SDS Approval Briefer: PM

Gate 5 Input Criteria Approved SDS Key knowledge of the business process/business arrangements as defined in the Acquisition Strategy Goals/Exit Criteria Approval for RFP release as authorized by the Acquisition Strategy Approval of buy & build business strategy as defined in the Acquisition Strategy Satisfactory review of Program Health (see Exit Criteria Template) RFP Approval Briefer: PM

Gate 6 Input Criteria Source Selection (SS) complete Contract awarded Integrated Baseline Review (IBR) complete CPD only Completed Service review of CPD & CONOPS Goals/Exit Criteria Program Management Baseline (PMB) established and IBR results acceptable Contractor’s PMB meets SDS requirements Satisfactory review of Program Health (see Exit Criteria Template) CPD only Approval for CPD entry into Joint routing, or CNO/CMC routing Sufficiency Review Briefer: PM