Chesapeake Bay Preservation Act Overview and Issues Presentation To Potomac Watershed Roundtable July 8, 2005 Joan Salvati, Director Division of Chesapeake.

Slides:



Advertisements
Similar presentations
Siskiyou County Land Development Manual 2006 Update Planning Commission Hearing Land Development Manual Update.
Advertisements

WATER QUALITY ANALYSIS for ANTIDEGRADATION
Current Tukwila Tree Policies & Regulations. Comprehensive Plan Goals and Policies Related to Trees/Landscape (1) Vegetated hillsides and freeway corridors.
Stream Corridors Christine Hall Natural Resources Conservation Service North Jersey RC&D Slides 1-12.
NEPA, CWA, THE FARM BILL, THE BAY ACT, ESC, ASA, WQIA Understanding Laws that Shape Virginia’s Soil and Water Conservation Districts defiance-county.com.
11 Virginia Stormwater Management Regulations December 9, 2013 Va Soil and Water Conservation Districts Annual Meeting.
Bill Orme, Senior Environmental Scientist, State Water Board Liz Haven, Asst. Deputy Director, Surface Water Regulatory Branch, State Water Board Dyan.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
LID and Stormwater Technical Resource Center Update County Road Administration Board November 3,
Introduction To The Highway Runoff Manual This introduction focus on: An overview of the Highway Runoff Manual. The definition of Minimum Requirements.
Department of Conservation and Recreation 1 Proposed Stormwater Management Requirements for Virginia Rappahannock River Basin Commission June 24, 2009.
Federal Realty Investment Trust (FRIT) Eastgate Shopping Center Chapel Hill, NC September 9, 2008.
Florida Fish & Wildlife Conservation Commission ZOS Location Map Feet.
Illinois Department of Natural Resources. Illinois Coastal Management Program Illinois was officially approved as a Coastal Management Program on Jan.
Noel H. Kaplan, Senior Environmental Planner
Crafting Stormwater Programs Oregon Coastal Planners Fall Network Meeting October 9, 2008 Florence Event Center Alissa Maxwell, PE.
Alternative Onsite Sewage Systems: New Regulations & Issues for Localities Potomac Watershed Roundtable January 7, 2011 Thomas E. Crow, Director Division.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Ryan’s Landing Master Planned Development Application No. RZ-PUD
Board of County Commissioners PUBLIC HEARING December 2, 2008.
Open Space Residential Development Bylaw Town of Rehoboth.
Team Tech meeting May 22, 2006 State Traffic Commission & DEP Storm Water Permitting State Traffic Commission Permitting & Storm Water Permitting State.
Summit #1 San Juan County Shoreline Master Program Update March 1 st, 2 nd, and 3 rd
Protective Regulations Ohio Lake Erie Commission Best Local Land Use Practices January, 2007 Kirby Date, Countryside Program Coordinator.
Non-Zoning Wetlands Bylaw Public Hearing January 15, 2009
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
Local Government Assistance Phase II Storm Water Rule Erie County Department of Environment & Planning.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
Board of County Commissioners PUBLIC HEARING June 8, 2010.
VI. Developing a VSMP Program General Stormwater Training Workshop.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
Non-point Source Update Marc T. Aveni Regional Manager.
Stormwater and C.3 Overview Tom Dalziel, Assistant Manager Contra Costa Clean Water Program.
August 2009 Presented By: Tim Brodeur The Benefits of Keeping our Native Beauty Intact - Area IV Water Conservation Committee Model Native Plant Ordinance.
Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
Phase II National Storm Water Regulations What’s in it for you?
Cumberland Park CCB Project Virginia Department of Environmental Quality October 9, 2007.
Storm Water Permitting Commission on the Future of Virginia’s Environment August 27, 2001 Department of Environmental Quality.
Jefferson County Agricultural Preservation and Land Use Plan Jefferson County’s Comprehensive Plan: Process and Strategies Presented to: Dane County Officials.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Bureau of Watershed Management Regulatory Proposal Chapter 102 [Erosion and Sediment Control] Erosion, Sediment and Stormwater Management February 21,
Stormwater Runoff: 101 Natural groundcover absorbs, slows and filters rainwater; pavement and rooftops do not. Heavier and faster runoff leads to heavier.
Zoning pt. III. Intensity Regulations Meant to dictate the intensity of use Different standards for different use districts –Minimum lot size –Minimum.
SW101 Large and Small Construction Denise Hamilton, EPA Region 6 8 th Annual Region 6 MS4 Operators Conference June 26, 2006.
Stormwater and GIS Eastern Panhandle WV GIS User Group Meeting September 2, 2015 Jennifer Klages - Sebastian Donner -
1 State Parks  Soil and Water Conservation  Natural Heritage Outdoor Recreation Planning  Land Conservation Dam Safety and Floodplain Management Chesapeake.
Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008.
Ohio Balanced Growth Program Codes and Ordinances Workshop: Recommendations for Development and Site Layout Kirby Date, AICP, Cleveland State University.
Draft Generic Environmental Impact Statement for Adoption of Stream Corridor Management Regulations for the Lake George Park.
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
City of Dunnellon Comprehensive Plan Amendment  Future Land Use Element  Conservation Element  Concurrency Management System.
County-Wide Act 167 Plan “County-wide Act 167 Stormwater Management Plan for Chester County, PA” was prepared by: Chester County Water Resources Authority.
Guidelines for Land Clearing Presented By: SLC Environmental Resources Department.
Connecting South Dakota and the Nation Access Management Training Brooke White, Access Management Engineer.
“State Road 100 MPC Lots” Comprehensive Plan Amendment & Rezoning City Council Public Hearing November 17, 2015.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Applicant: Robert Ganem Addresses: 7304 & 7312 Black Oak Lane Planning Commission Meeting – August 21, 2015.
OPEN SPACE/ CONSERVATION
Mn Buffers Program: Overview of 2016 Statute Clarifications
Supervisor, RIDEM RIPDES Permitting Program
PENNSYLVANIA STORMWATER BEST MANAGEMENT PRACTICES MANUAL
Land Use and Zoning Committee Special Workshop
Sacramento County Stormwater Quality Program
Anne Arundel County Maryland
The Bay Act Regulations restrict recreational uses within the 100-foot wide buffer to passive recreation facilities, including trails, boardwalks and.
Sacramento County Stormwater Quality Program
Presentation transcript:

Chesapeake Bay Preservation Act Overview and Issues Presentation To Potomac Watershed Roundtable July 8, 2005 Joan Salvati, Director Division of Chesapeake Bay Local Assistance

Who is Joan Salvati  30 years with local government  Focus on building strong stakeholder relationships  Vision: A “user-friendly” DCBLA

Statutory Authority  1988 Chesapeake Bay Preservation Act.  September 20, 1989 Chesapeake Bay Preservation Area Designation and Management Regulations – revised March 1, 2002.

Purpose of the Chesapeake Bay Preservation Act  Establish a cooperative program between State and local governments aimed at reducing nonpoint source pollution.  Improve water quality in the Chesapeake Bay and its tributaries and other state waters by requiring the “counties, cities, and towns of Tidewater Virginia incorporate general water quality protection measures into their comprehensive plans, zoning ordinances, and subdivision ordinances…”;

CBPAs = RPAs + RMAs  Chesapeake Bay Preservations Areas (CBPAS)  Resource Management Areas (RMAs)  Resource Protections Areas (RPAs)  CBPAs Subject To 11 Performance Criteria  RPAs Subject to additional Development Criteria

Resource Protection Areas  Tidal wetlands;  Nontidal wetlands connected by surface flow and contiguous to tidal wetlands or water bodies with perennial flow;  Tidal shores;  Other lands;  A buffer of not less than 100 feet in width landward of these features and along both sides of any water body with perennial flow.

Resource Management Areas  Floodplains  Highly erodible soils, including steep slopes  Highly permeable soils  Nontidal wetlands not included in the RPA  Other lands considered by the local government to be necessary to protect water quality

General Performance Criteria  No more land shall be disturbed than is necessary.  Indigenous vegetation shall be preserved to the maximum extent practicable development.  Land development shall minimize impervious cover.

Performance Criteria  Plan of development review requirements  2,500 SF E&S Control threshold  5-year septic pumpout & reserve drainfield  Agricultural BMPs  Silvicultural BMPs  Proof of Wetlands Permits  Stormwater management criteria  BMP maintenance agreements

Permitted Uses in the RPA  Water dependent facilities.  Redevelopment.  Roads and driveways under certain circumstances.  Flood control and regional stormwater management facilities under certain circumstances.

The Vegetative Buffer:  Minimizes the adverse effects of human activities;  Retards runoff;  Prevents erosion;  Filters nonpoint source pollution from runoff;  Must be retained if present and established where it does not exist.

Pending Issues  Merger  Perennial Flow Determinations  Intensely Developed Area Designations  Compliance Evaluations  Education & Outreach  Phase III

Merger  Storm water management is now consolidated within the Division of Soil & Water  Consolidated program reviews and annual reporting  Commitment to continued customer service

Perennial Flow Determinations  Sound guidance developed through consensus  Need more training  Central Virginia – July  Tidewater – August 2-5  Contact Brad Belo,

IDAs/Exceptions  Since exception requirements changed with the 2001 regulatory amendments, several localities seek to expand IDAs.  Policy Committee will be reviewing this issue.

Compliance Evaluations  Analysis of actual implementation “on the ground”  5-year cycle  Annual reports due after compliance evaluation completed  Contact you liaison for checklist information

Education & Outreach  Online survey recently sent out – Please respond!  Annual workshop this Fall  Training available for the exception process and other issues, as needed

Ordinance Review  Regulations require localities to “assure that their subdivision ordinances, zoning ordinances…are consistent in promoting and achieving the protection of state waters.”  Coming soon…..

We’re Here to Help….  Tel: 

RPA Performance Criteria: WQIA  A Water Quality Impact Assessment is required for ALL land disturbance, development or redevelopment in RPAs.  May be required for any other development in CBPAs that warrant the assessment because of unique site characteristics or intensity of the proposed development.

RPA Performance Criteria: Water-dependant Facility  A new or expanded water-dependant facility must:  Comply with local comprehensive plan;  Comply with general performance criteria;  Non-water dependant components outside RPA;  Provide access with minimum disturbance, preferably with a single point of access.

RPA Performance Criteria: Redevelopment  Redevelopment permitted within RPA only if:  No increase in impervious cover;  No further encroachment into the RPA;  Complies with E&S and stormwater management criteria.

RPA Performance Criteria: Roads & Driveways  Private roads and driveways may be constructed in the RPA provided that:  No reasonable alternative exists;  Minimize RPA encroachment and adverse water quality effects;  Satisfy all criteria, including a WQIA;  Plans must be reviewed and approved through a plan of development process.

RPA Performance Criteria: Flood Control & Stormwater Management  BMP location in the RPA is necessary;  BMP size is the minimum necessary;  The locality’s stormwater management program approved by CBLAB as a Phase I modification;  Applicable state or federal permits obtained;  Local government approval required;  Routine maintenance is allowed.  BMPs serving individual lots are not allowed.

Trees Shrubs Ground covers Components of the RPA buffer

Permitted Buffer Modifications  Sightlines and Vistas  Access Paths  General Woodlot Management  Best Management Practices  Shoreline Erosion Control Projects

Permitted Buffer Modifications: Sight Lines and Vistas  Vegetation removed to provide for reasonable sight lines must be replaced with other vegetation that protects water quality.  Emphasis is on filtered views achieved through pruning and maintenance of the three tropic layers:  Canopy and understory trees.  Shrubs.  Groundcover.

Good shrub layer Shrub layer removed

Permitted Buffer Modifications: Access Paths Any path shall be constructed and surfaced so as to effectively control erosion. 9 VAC a (2).

Permitted Buffer Modifications: Access Paths  Limit to the minimum width necessary to preserve vegetation.  Residential pedestrian paths should be unpaved or have a porous surface.  Paths should wind around trees and shrubs.

Permitted Buffer Modifications: General Woodlot Management  Thinning only for a young overstocked forest, or an older, poorly managed stand.  Noxious weed: any invasive species that has gotten out of control and has become harmful to the health and survival of the woody vegetation in the buffer.

Permitted Buffer Modifications: General Woodlot Management  Under no circumstances should a complete understory layer be removed under the claim of thinning for management.  Develop a self-sustainable, uneven stand of mixed trees, shrubs and groundcover with a floor of either leaf-litter and debris or mulch.

Permitted Buffer Modifications: Shoreline Erosion Control Measures Projects must:  Minimize land disturbance.  Preserve existing vegetation;  Meet local Comp Plan guidelines;  Complete a WQIA.

Nonconforming Uses and Non-complying Structures in the RPA  Continued use and expansion of principal nonconforming structures is permitted.  Remodeling and alteration of principal and accessory structures is permitted through an administrative review process.  Expansion or construction of accessory structures on nonconforming lots is not permitted by right.

Permitted Buffer Encroachments  Encroachments into the landward 50 feet of the buffer area are permitted:  Pre-1989 lots where application of the buffer would result in the loss of a buildable area.  Lots recorded between 1989 and 3/1/02.

Exemptions from the RPA Criteria  Water wells; boardwalks, trails and pathways used for passive recreation; and historic preservation or archaeological activities.  Public utilities, public roads, and railroads.  Minimize encroachment into RPA.  Minimize adverse effects on water quality.  Locate outside RPA if possible.  Comply with E&S and stormwater management criteria.  Minimize land disturbance.

Exceptions to the RPA Criteria  Requires public notification.  A public hearing before a local legislative body required.  Additional findings required for granting exceptions.

Findings Required for Exceptions  Minimum necessary to afford relief;  No special privileges denied to others;  Is in harmony with the purpose of the Act and is not of substantial detriment to water quality;  Is not based on self-created or self-imposed conditions;  Reasonable and appropriate conditions are imposed as necessary.

Other Regulations That May Apply in the RPA  Erosion & Sediment Control Law  Wetlands regulations  Local ordinances  Fairfax County Water Authority Shoreline Policy

The Goal is this...

Not this...