WP-2-2: Optics & Lattice Layout. HL-LHC Collaborators: Optics & Lattice Layout List Riccardo de MariaLenny Rivkin... ? Rogelio TomasVladimir Shiltsev...

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Advertisements

The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
Analysis and Control of Beam Dynamics in EMMA Kai Hock and Andy Wolski STFC PPRP Meeting, Glasgow, 24 June 2009.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
IR vacuum M. Sullivan PEP-II meeting Feb. 22, 2007.
Nonlinear Dynamics Workshop ESRF, Grenoble, France 26 – 28 May 2008 Kai Hock Liverpool Group Meeting, 18 April 2008.
02/06/20141 WHAT ITEM IS COMPOSED OF ? INTEGRATION MODEL DETAIL MODEL SKELETON 3D ENVELOP PART 1 PART 2 PART XXX… EQUIPMENT ITEM INTEGRATION OFFICE RESPONSIBILITY.
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
LHeC Workshop Chavanne-de-Bogis, 20/21 January 2014 Herwig Schopper.
4th Phase : 4th Phase : CONTROL Why is control necessary? Because:  People make mistakes  External factors can have impact on the project  Requirements,
Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.
HL-LHC WP2 Brainstorming Meeting 1 Purpose of this meeting:  Introduce the main objectives of the new HL-LHC project: Prepare technical proposal by 2013.
NSW SG 19 Nov Nov 2014 S. Zimmermann, NSW SG 1.
Report on the Damping Ring Meeting at CERN, Nov , 2005 J. Gao IHEP, Beijing, China Nov. 24, 2005, ILC-Asia Meeting.
Advanced VIRGO WG1: Status VIRGO, Cascina Andreas Freise University of Birmingham.
HHH network Activity for the next 18 months Walter Scandale CERN CARE 06 Frascati, 16 November 2006.
D. Angal-KalininEUROTeV Annual Meeting, DESY WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, STFC, Daresbury Laboratory 4 th EUROTeV Annual.
WP: Parameters and design. Plans from IFIC, Valencia Javier Resta López on behalf of the IFIC accelerator group ( IFIC (CSIC-UV),
Paris 5 September 2005 HHH Status progress W. Scandale CERN Accelerator Technology Department CARE-HHH Network: coordinators: F. Ruggiero and W. Scandale.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Patrick Janot News and Organization  Major events since last coordination meeting (30 April 2014) u 7 th FCC-ee (TLEP) Physics Workshop (19-21 June 2014)
CLIC Beam Physics Working Group D. Schulte
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
E. GschwendtnerMDI, 18 Feb Post-Collision Line and Dumps Working Group The PCLD Working Group shall co-ordinate the design and experimental work.
WG3 status and plans Interaction Region design Andrei A. Seryi, John Adams Institute On behalf of IR design team: JAI, CI, INFN, EPFL, CERN EuroCirCol.
Mid Term Review Meeting, 26 September 2012J. MONTAÑO1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 WP5 “XBEAM”
Review of FCC-hh optics & beam dynamics IPNO, Orsay, Paris November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann.
BDS Lattice Design : EDR plans GWP03 Meeting 04/12/2007.
Introdcution to Workpackage/Activity Reflection D. Schulte.
HIGHLIGHTS OF LAST MONTHS OF HSS ACTIVITIES AN EXCITING AND HECTIC PERIOD WITH THE LHC BACK IN OPERATION… ABP General Group meeting - HSS1.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
1 Task particle simulations studies: progress report M. Giovannozzi Objectives To study the field quality tolerances for new magnetic elements for.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
WP2: Beam dynamics and optics Workflow between Work Packages 1 O. Brüning – BE-ABP WP2 HL-LHC meeting 17. November 2011.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Beam Physics News D. S. for the beam physics team June 1 rst, 2011.
Mid Term Review Meeting, 26 September 2012A. Shornikov 1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
High Luminosity LHC Robustness & tolerances Catia Milardi HL LHC Task 2.2, September 19 th 2012.
H.-G. Moser Max-Planck-Institut für Physik 2nd DEPFET workshop 3-6 May 2009 Open Issues Readout cycle: 10 µs or 20 µs ? Advantages of 20 µs: - smaller.
Layout and Arcs lattice design A. Chancé, B. Dalena, J. Payet, CEA R. Alemany, B. Holzer, D. Schulte CERN.
29 October 2015 B. Di Girolamo. B. Di Girolamo – Collider-Experiments Day – 5 th HiLumi Annual Meeting 2 Collider-Experiments Interactions There is a.
Towards Snowmass Jul. 13, 2005 Y.Sugimoto. Charge for Detector WGs Charge for Concept Groups: work towards a baseline design define performance criteria.
First evaluation of Dynamic Aperture at injection for FCC-hh
1 April 1 st, 2003 O. Napoly, ECFA-DESY Amsterdam Design of a new Final Focus System with l* = 4,5 m J. Payet, O. Napoly CEA/Saclay.
CERN, 11th November 2011 Hi-lumi meeting
FCC-ee Interaction Region design
M. Sullivan Apr 27, 2017 MDI meeting
WP11 – ANAC Report on First Semester
Some input to the discussion for the design requirements of the GridPixel Tracker and L1thack trigger. Here are some thoughts about possible detector layout.
UK Feedback Feedback from Prof John Womersley, Chief Executive of Science and Technology Facilities Council (STFC), UK at the Cockcroft Institute Board.
WP3 status Interaction Region design
Experimental Interaction Region – updates and coordination
19th Hadron Synchrotron Incoherent effects section meeting
Tuning and Alignment of the ATF2
CLIC Study Aim Conceptual design report in 2010
CLIC BDS tuning and luminosity signal
CLIC-ILC BDS & MDI work.
STFC Contributions to the FCC Study
Alternative design of the matching section for crab-cavity operation
HL LHC WP3 (magnets) TASK 2 ADVANCEMENT
M. Pivi PAC09 Vancouver, Canada 4-8 May 2009
Task 2.3 Particle simulations studies
High Energy High Intensity Hadron Beams
Triplet corrector layout and strength specifications
SR Update for JLEIC June 8, 2017
Presentation transcript:

WP-2-2: Optics & Lattice Layout

HL-LHC Collaborators: Optics & Lattice Layout List Riccardo de MariaLenny Rivkin... ? Rogelio TomasVladimir Shiltsev... ? Stephane Fartoukh BJH Angeles Faus-Golfe Valencia Javier Resta Andy Wolski Cockcroft Inst. Rob Appleby Kai Hock Maxim Korostelev Olivier Napoli CEA Jacques Payet Barbara Dalena Catia Milardi INFN

GOAL: End of Spring: have a first layout for different lattices to define input for the magnet R & D colleagues End of Summer: Fine Tuning of different Layout Options to get a clear picture of achievable luminosity input for the tracking friends be prepared for iteration with magnet R & D

Main Topics of the Optics & Lattice Club... this is work in PROGRES

Main Topics of the Optics & Lattice Club example:

Collaboration with other Tasks WP-2-3: Tracking & Magnet Quality Specification -- direct impact & iteration needed --- WP-2-5: Beam Beam studies WP-2-6: General Parameter Optimisation Outside WP-2: Magnet R & D Vacuum Specs including beam screen & thungsten layers Machine Detector Interference: Background, Lumi, Beam Pipe Layout etc

Organisation of Meetings & Information Flow to start with: regular meetings at CERN: 2 x per month interchanging with the LCU meeting (i.e. Tue Morning, 10:00h)  input please Once per month: organise as EVO meeting / Telephone conference to include status reports from the collaborators Strong Hope: longer visits of external collaborators at CERN to discuss and (re-) define the party line (LHeC like ?) Summaris the basic information on a WEB site