1 Intro to the CMMI (Capability Maturity Model Integration) Management Overview.

Slides:



Advertisements
Similar presentations
Implementing CMMI® for Development Version 1.3
Advertisements

SPIN-BG Seminar 1.Overview of CMMI Model changes 3.SCAMPI method changes 4.Training changes 5.CMMI Architecture Author: Kiril Karaatanasov
Kai H. Chang COMP 6710 Course NotesSlide CMMI-1 Auburn University Computer Science and Software Engineering Capability Maturity Model Integration - CMMI.
National Cheng-Kung University
Copyright 2005 CMMI and ITIL Alison Adams & Kieran Doyle.
Copyright 2003 CMMI: Executive Briefing Presented by Kieran Doyle
CMMI Overview Dr. Korson Software Engineering. 2 Immature organizations can be successful on occasion, but ultimately run into difficulties because –Success.
Managing Software Quality Main issues:  Quality cannot be added as an afterthought  To measure is to know  Product quality vs process quality.
18 th International Forum on COCOMO and Software Cost Modeling October 2003 Use of Historical Data by High Maturity Organizations Rick Hefner, Ph.D.
SE 470 Software Development Processes James Nowotarski 12 May 2003.
Capability Maturity Model Integration (CMMI). CMMI Enterprise-wide process improvement framework Focuses on processes for improved product Process areas:
Software Quality Processes – Part II CSSE 376, Software Quality Assurance Rose-Hulman Institute of Technology March 19, 2007.
CMM Overview - 1 © Paul Sorenson CMPUT Software Engineering refs. IEEE Software, March 1988, 73-79, and IEEE Software, July 1993, (Capability.
Chapter 3 The Structure of the CMM
Lecture 11 CMM CSCI – 3350 Software Engineering II Fall 2014 Bill Pine.
Capability Maturity Model
CS 577b Software Engineering II -- Introduction
Chapter : Software Process
CMMI Course Summary CMMI course Module 9..
1 The Continuous Representation. 2 UNIT 2 Topics covered in this unit include Additional terminology Practices – The fundamental building blocks Process.
Copyright © 2009, Systems and Software Consortium, Inc. Introduction to an Integrated Lean Thinking, Six Sigma  and CMMI  Approach for Process Improvement.
8. CMMI Standards and Certifications
Integrated Capability Maturity Model (CMMI)
Training on “CMMI for Development – ver 1.2”
The Capability Maturity Model in Software Development Paul X. Harder, JD Government Micro Resources, Inc. September 14, 2004.
Model-Based Process Improvement Module 2. Module Objectives This module will enable students to recall information about the history of CMMI fundamentals.
Process Assessment Motivation SEI Capability Maturity Model
N By: Md Rezaul Huda Reza n
Systems Engineering Process Office PIE PIE Describing the CMM and the CMMI Objective: Examine the SEI’s Capability Maturity Model for Software.
1 The Continuous Representation. 2 UNIT 2 Topics covered in this unit include Additional terminology Practices – The fundamental building blocks Process.
CMMi What is CMMi? Basic terms Levels Common Features Assessment process List of KPAs for each level.
People First … Mission Always Capability Maturity Model Integration (CMMI ® ) Millee Sapp 2 Dec 08 Warner Robins Air Logistics Center.
Software Engineering Lecture # 17
NDIA Systems Engineering Supportability & Interoperability Conference October 2003 Using Six Sigma to Improve Systems Engineering Rick Hefner, Ph.D.
10/16/2015Bahill1 Organizational Innovation and Deployment Causal Analysis and Resolution 5 Optimizing 4 Quantitatively Managed 3 Defined 2 Managed Continuous.
Gary Natwick & Jim Cocci November 2003 Understanding the CMMI ® Validation Process Area CMMI ® Technology Conference & User Group 2003 assured.
Software Process Assessment and Improvement
Holistic Approach to Security
Capability Maturity Model CS3300 Fall The Problem Contractors over budget and late. Need a way to rank how likely a software company is to deliver.
1 ISO 9001:2000 ISO 9001 is the creation of the International Organisation for Standardisation (ISO), a Swiss-based federation of national standards bodies.ISO.
1 © Mahindra Satyam 2009 Mahindra Satyam Confidential Welcome To CMMI Introduction.
1 通信软件开发与管理 Course OD601 学时: 32 学分: 2 讲师:罗文彬. 2 Communication Overview System Architecture Overview Performance and Reliability Operation, Administration,
Managing Software Quality Main issues:  Quality cannot be added as an afterthought  To measure is to know  Product quality vs process quality ©2008.
IS Methodologies. Systems Development Life Cycle - SDLC Planning Planning define the system to be developed define the system to be developed Set the.
Software Engineering - I
Requirements Development in CMMI
January 2003 CMMI ® CMMI ® V1.1 Tutorial Sponsored by the U.S. Department of Defense © 2003 by Carnegie Mellon University SM CMM Integration and SCAMPI.
1 Agenda for measurement r1. CMMI r2. Other thrusts.
An Introduction. Objective - Understand the difference between CMM & CMMI - Understand the Structure of CMMI.
Copyright © | Trade secret and confidential Page 1 Innovative, Professional, Fact Based and Eustressed© Maruthi Quality Management Services Ptv. Ltd..,
SOFTWARE PROCESS IMPROVEMENT
Software Engineering (CSI 321) Software Process: A Generic View 1.
CMMI1 Capability Maturity Model Integration Eyal Ben-Ari 8/2006.
MSA Orientation – v203a 1 What’s RIGHT with the CMMI?!? Pat O’Toole
Project Management Strategies Hidden in the CMMI Rick Hefner, Northrop Grumman CMMI Technology Conference & User Group November.
CMMI Overview Quality Frameworks. Slide 2 of 146 Outline Introduction High level overview of CMMI Questions and comments.
© 2004 Tangram Hi-Tech Solutions Project Management According to the CMMI1 Project Management according to the Capability Maturity Model (CMMI)
CMMI for Services, Version 1.3
Certification: CMMI Emerson Murphy-Hill. Capability Maturity Model Integration (CMMI) Creation of the Software Engineering Institute (SEI) at Carnegie.
Figures – Chapter 26. Figure 26.1 Factors affecting software product quality.
A Comparison of CMMI & SPICE
Capability Maturity Model. What is CMM? n CMM: Capability Maturity Model n Developed by the Software Engineering Institute of the Carnegie Mellon University.
Overview of CMMI Global Certification Consultant is aiming to designed CMMI Presentation to share knowledge about CMMI,
Software Engineering (CSI 321)
Level - 3 Process Areas (CMMI-DEV)
CMMI – Staged Representation
Capability Maturity Model
Use of CMMI in an Acquisition Context Using CMMI for Process Improvement at USAF Space and Missile Systems Center (SMC) Dr. Jack R. Ferguson
Capability Maturity Model
Requirements Development in CMMI
Presentation transcript:

1 Intro to the CMMI (Capability Maturity Model Integration) Management Overview

JFR Consulting2 Speaker zJohn Ryskowski zof JFR Consulting z

JFR Consulting3 Purpose zTo gain some understanding of: yProcess Models, their history, assumptions yWhat’s in the CMMI and why yProject management across maturity levels yIn summary

JFR Consulting4 Why Focus on Process? zThe process management premise: yThe quality of a system is highly influenced by the quality of the process used to acquire, develop, and maintain it. zThis premise implies focus on processes as well as on product. yThis is a long-established practice in manufacturing. yBelief in this premise is visible worldwide in quality movements in manufacturing and service industries, e.g., ISO standards.

JFR Consulting5 A Little History SW-CMM V1.1 SW-CMM V2.0 Draft CMMIEIA 731 (SE) IPD CMM Why am I being pulled? Pulled, I was never used! I’m big, I’m beautiful, and you can’t hide! I could have been a contender if I had maturity levels. What?

JFR Consulting6 CMMI Parts zMaturity levels (or cultural state) yProcess Areas (PA) (or topics) xGoals (or general activities) Practices (or detailed activities)

JFR Consulting7 The CMMI

JFR Consulting8 Maturity Levels zThe maturity level of an organization provides a way to predict the future performance of that organization within a discipline or set of disciplines.

JFR Consulting9 Quick quiz 1) What is the first level where data from one project is easily available to other projects in the organization? 2) At what level are individual projects managed with little detailed organizational influence? 3) At what level are boundaries applied to project metrics measures as an indicator to take action? 4) At what level is the transition to new technologies routine? 5) What level relies heavily on the heroics of individuals for project success? Level 1 (Initial) Level 2 (Repeatable) Level 3 (Defined) Level 4 (Managed) Level 5 (Optimizing)

JFR Consulting10 Level 2 Process Areas Requirements Management Configuration Management Process & Product Quality Assurance Measurement & Analysis Supplier Agreement Management Project Monitoring & Control Project Planning

JFR Consulting11 Level 3 Process Areas Organizational Process Focus Validation Product Integration Verification Decision Analysis & Resolution Risk Management Organizational Training Organizational Process Definition Integrated Project Management Technical Solution Requirements Development

JFR Consulting12 Levels 4 and 5 Process Areas Causal Analysis & Resolution Organizational Innovation & DeploymentQuantitative Project Management Organizational Process Performance

JFR Consulting13 Some Goals (from Project Planning) zGoal 1 – Estimates of project planning parameters are established and maintained. zGoal 2- A project plan is established and maintained as the basis for managing the project. zGoal 3- Commitments to the project plan are established and maintained.

JFR Consulting14 Some Practices (from goal 2 of Project Planning) 1.Establish the budget and schedule 2.Identify project risks 3.Plan for data management 4.Plan for project resources 5.Plan for needed knowledge and skills 6.Plan stakeholder involvement 7.Establish the project plan

JFR Consulting15 Process Areas may also be grouped by topic zProject management zProcess management zEngineering zSupport Let’s take a look at the project management process areas across the maturity levels.

JFR Consulting16 Project Management Process Areas Supplier Agreement Management (SAM) Project Monitoring & Control (PMC) Project Planning (PP) Integrated Project Management (IPM) Risk Management (RSKM) Causal Analysis & Resolution (CAR) Quantitative Project Management (QPM) MATURITY LEVEL 2 MATURITY LEVEL 3 MATURITY LEVEL 4

JFR Consulting17 A model is an abstraction… zThe CMMI ycaptures industry/common sense best practices, yand documents them at the appropriate level of abstraction yso that there exist many ways to meet the model practices

JFR Consulting18 In Summary zThe CMMI brings yProject visibility yProject predictability

JFR Consulting19 For further study zMight want to start with these SEI web pages: ywww.sei.cmu.edu/cmmi/ xFor more about the CMMI ywww.sei.cmu.edu/sema/ xFor summaries of appraisal results

JFR Consulting20 In closing Thank you