MPID 223 (Failure to Follow Synchronising Instruction) JGCRP 12 th November 2014 (Anne Trotter)

Slides:



Advertisements
Similar presentations
INTRA-DAY TRADING: Conference Call COD for Interconnector Units in WD1 Ending Overlap Optimisation Period (EOOP) 29 November 2011.
Advertisements

Background T&SC V9.0: The Market Operator shall not grant the status of Under Test for the purposes of this Code to Autonomous Generator Units, Pumped.
03/11/2013 MARKETS COMMITTEE Aleks Mitreski MARKET DEVELOPMENT (413) Overview of Market Rule revisions.
ERGEG Advice Comitology Guidelines on Fundamental Electricity Data Transparency Florence Forum 13 December 2010 Bente Danielsen.
Ramping and CMSC (Congestion Management Settlement Credit) payments.
DS3 Programme Status Update JGCRP 12/11/2014 Robbie Aherne.
F Irish Implementation of Art. 16 of the Renewable Energy Directive – a long road to where? Joanne Finn Head of EU, Competition & Regulated Markets Thursday,
Joint Grid Code Review Panel POR Working Group Meeting 2 27 th March 2015 Chairperson : Michael Preston.
Wind Power in Ireland: Treatment of wind in the Single Electricity Market APEx Conference, Paris 16 th October 2007.
Utah Schedule 37 Update June 25, Schedule 37 Background Schedule 37 – Published rates for standard power purchase agreements with qualifying facilities.
INTERNATIONAL DRAFT ESBI Workshop on OC October 9th-10th 2000 Presenters John Kennedy & Meadhbh Flynn.
DSU Commissioning and Testing Process
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
Short Term Testing Mod 65_08 Modification Committee 25 th November 2010.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
Energy Balancing Credit Proposals Transmission Work Stream 6th November 2008 Mark Cockayne.
(C) NordPool1 The Nordic Power Market Zonal Pricing Jan Vidar Thoresen Managing Director Nord Pool Consulting AS.
ENTSO-E Network Codes Development Plan GCRP/JGCRP Belfast 20 th February 2013.
NSRS deployment April John Adams ROS – May 12, 2005.
Peak RCCo Performance Metrics Draft –November 2013.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
Proposed CMSC Amendments - Imports & Exports Intertie Trading Sub-committee November 24, 2003 PUBLIC.
Planning and Community Development Department Housing Element City Council February 03, 2014.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
DSU Modifications Séamus Power 12 November 2014 – EirGrid GCRP Meeting.
Market Evolution Program Day Ahead Market Project How the DSO Calculates Nodal Prices DAMWG October 20, 2003.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Hour Ahead Dispatchable Loads Applicable Updates to Procedures Presentation to the Market Operations Standing Committee April 23, 2003
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Review of SONI Power System Operations Alex Baird Grid Operations Manager Real Time.
Northern Europe Electricity Regional Initiative 5th Stakeholder Group Meeting Transparency in the region 26. May 2010, Copenhagen Jan-Welf Selke Bundesnetzagentur.
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
2013 Wind Conference. Congestion Management & Communication Processes CJ Brown.
C O U P L E D NWE Day Ahead Price Coupling Handling of losses in the algorithm IG meeting, December 5 th, 2012, DERA premises, Copenhagen.
Impact of Increasing Meter Errors on the SEM Modifications Committee Meeting 65 3 rd December 2015.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
Fair Go Rates System Dr Ron Ben-David Chairperson MAV Rate Capping Forum 26 November 2015.
T&SC Modification Proposal: Clarification of Outturn Availability
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Intraday Trading March RAs raised a Modification (18_10) in March 2010, proposing the implementation of “intra-day trading” in the SEM. The Modifications.
Business Case NPRR 351 Floyd Trefny Amtec Consulting Brenda Crockett Champion Energy Services.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
Demand Side Working Group March 5, 2010 Mary Anne Brelinsky EDF Trading North America.
Jul 23, 2003Market Operations Standing Committee of the IMO1 Market Pricing Issues Update John MacKenzie.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
Protocol Revision Subcommittee
Fair Go Rates System Dr Ron Ben-David Chairperson
Change Management V.N.Bhaskar Rao Engineering & Construction Director Amec Foster Wheeler India Operations.
Grid Code Development Forum – 6 September 2017
Flexible Forward Contracts for Renewable Energy Generators
Fair Go Rates System Dr Ron Ben-David Chairperson
Nordic Winter Power Balance
Changes to Reserve Level Declaration Guidelines
Update to Unit Under Test Process
Transmission Planning Code Review
Summary Issue Modification Aim Effect of the mod Impacts
Use of Technical Offer Data in Instruction Profiling / QBOA Version 2
Richard Fairholme Transmission Workstream 4th September 2008
Entry Overrun Calculation
Options for the Development of a Demand Side Response Mechanism
Information Provision for Transitional Exit Capacity
Mod 09_19 - Removal of locational constraints from Imbalance Pricing
Market Pricing Initiatives Update September 9th, 2003
JGCRP WG on Heat States and the Impact on Notification Times
Market Pricing Issues: Update
Presentation transcript:

MPID 223 (Failure to Follow Synchronising Instruction) JGCRP 12 th November 2014 (Anne Trotter)

Background Grid Code Modification Proposal MPID 223 was presented by EirGrid and SONI at the Joint Grid Code Review Panel on 23rd February 2012 in Belfast, relating to changes to the Scheduling and Dispatch Code (SDC) that arose as a result of clarifications needed to the “Failure to Follow Notice to Synchronise”. Proposals for amendments to the Grid Codes needed as a result of the above were discussed at Joint Grid Code Review Panel Meetings on 23rd February and 24th May 2012 and were consulted upon from 23rd May 2012 until 28th June 2012.

Background cont. On 28th September 2012 EirGrid and SONI (the TSOs) issued a joint response to the consultation, which was published on the EirGrid and SONI websites In this response the TSOs addressed the points raised by the respondents to the consultation On 28th September 2012, the TSOs sought the approval of: –The Commission for Energy Regulation for the specified changes to the EirGrid Grid Code –The Northern Ireland Authority for Utility Regulation for the specified changes to the SONI Grid Code In May 2013 CER and UREGNI wrote to EirGrid and SONI and UREGNI requesting the TSOs consider a number of specific points for discussion with the Grid Code Review Panels prior to resubmitting the modification proposals

Background cont.(1) On 10 th June 2014, EirGrid and SONI responded to CER and UREGNI with a report: _to_Synchronise.pdfhttp:// _to_Synchronise.pdf showing that there is no evidence to suggest a negative or positive impact on the cost of consumption, as a result of implementation of MPID 223. At the JGCRP meeting on 11 th June 2014, it was noted that the TSOs had issued this report, on Failure to Follow Synchronising Instruction, to the Regulators. The CER requested that this item (MPID 223) be brought forward to the November 2014 JGCRP/GCRP for final discussion.

Change Being Proposed OC (EirGrid Grid Code) allows the generator 10 minutes to rectify a non-compliance. –If a strict monitoring process was to be applied the Generator would be deemed to have failed to comply with an instruction if it had not synchronised the unit within 5 minutes of the original instructed time. The generator would then have another 10 minutes to rectify the situation (i.e synchronise) or else they have failed to comply with the instruction and must declare the unit unavailable. A 15 minute window is consistent with SDC and it is the TSOs view that this built in the above timings but removed the need for formal Testing/Monitoring to trigger a re-declaration Considering the above, the TSOs consider it pragmatic to allow 15 minutes before issuing a Failure to Follow Synchronising Instruction and when issued the unit must be declared to 0 MW.

Other changes It has also been agreed with Generators as part of the business process development that the TSO can request a unit to synchronise earlier than its Notice to Synchronise time but that the instruction to the generator would reflect the Notice to Synchronise time and only be amended if the unit synchronised earlier. In the interest of completeness the TSOs believe this should be included in the Grid Code

MO and TSO Initial Analysis of the Impact of Modification Proposal MPID 223 – June 2014 A total of 7 cases of potential fail to sync events in 2013 were analysed. While maintaining the original and actual Market conditions on the trading day in question (i.e. no change to wind or system load) the availabilities of the units were changed in the Unconstrained Unit Commitment (UUC) market engine and compared to a Basecase, run for the day in question to give an indication of the change in Production Cost for the trading day and any change in average System Marginal Price (SMP). The same process was carried out in the Reserve Constrained Unit Commitment (RCUC) engine. The results indicated no real change in SMP and show both increases and decreases in production costs in both the UUC and in the RCUC.

MO and TSO Initial Analysis of the Impact of Modification Proposal MPID 223 – June 2014 The market engine is designed to optimise the most economic dispatch to meet the schedule demand. In real time the TSOs need to schedule reserve and invariably there are differences in the forecast demand and the actual demand and in the forecasted generation from wind and actual generation from wind. Units which are synchronising (and therefore potentially failing to synchronise) can be more expensive units and therefore there is a higher probability that such unit(s) will not have been scheduled in the economic dispatch in the UUC market engine.

MO and TSO Initial Analysis of the Impact of Modification Proposal MPID 223 – June 2014 In the case where a unit fails to synchronise, the TSOs review the demand, wind forecast, interconnector flows, and performance of other units and make a decision to: 1.Operate the system with the increased cost of holding the required amount of reserve. (If there is a greater unreliability of units synchronising, long term this could increase the amount of reserve TSOs need to hold which increases reserve costs directly impacting the consumer). or 2.Start another more expensive unit (or perhaps a cheaper unit, as the unit failing to synchronise may be part of a Transmission Constraint Group)

MO and TSO Initial Analysis of the Impact of Modification Proposal MPID 223 – June 2014 Transmission Constraints exist in both Transmission System Operators (TSOs) in Ireland and Northern Ireland. This means Generation Units, which are not run in the market, need to be constrained on for system security reasons. If any of these “constrained on” units subsequently fail to synchronise, the production cost is reduced as cheaper units are run. However there may be an increased risk due to system security being reduced. It must be noted the TSOs continue to operate the power system prudently within an acceptable level of technical operating parameters.

Implication of not Implementing MPID 223 Potential ongoing confusion in the interpretation of the obligations of Generators with regard to ‘Failure to Follow Notice to Synchronise’ Potential for different implementation of Failure to Follow Notice to Synchronise in Ireland and Northern Ireland.