Magnet Measurement Device for MICE F. Garnier, P-A. Giudici, F.Bergsma CERN MICE Collaboration Meeting No. 30 6-9 July 2011 Oxford technical drawings by.

Slides:



Advertisements
Similar presentations
MICE- AFC Unit Mechanical Design of the Cold Mass Support System Oxford University Rohan Senanayake.
Advertisements

Stephan Haensel - 7th SiLC Meeting - CERN Combined test beam with LCTPC - an update on present status and schedule S. Haensel 1, T. Bergauer 1, M. Dragicevic.
Vacuum Vessel Production Readiness Review
CM-18 June The Measurement and Monitoring of the Field from the MICE Magnets Michael A Green Lawrence Berkeley Laboratory, Berkeley, USA Frank Filthaut.
MICO167 Status MICE mapper  B-sensors have arrived from NIKHEF  Read-out tested and ok  Pneumatic turning over 5 degrees in one-direction (“re-load”
A simple clamping device for the Solid absorber Wing Lau, Oxford.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Tracker Solenoid Module Design Update Steve VirostekStephanie Yang Mike GreenWing Lau Lawrence Berkeley National LabOxford Physics MICE Collaboration Meeting.
MICE COLLABORATION MEETING CERN March 29-April 1, 2004 Detector/Focus Coil module interface details P. Fabbricatore INFN-Genova Detector/Focus Coil module.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
06 Apr 09Target Prototype Metting1 Positron Target Prototype – Hardware Status Leo Jenner (T-25)
MICE Collaboration Meeting March 29 - April 1, CERN MICE Integration Edgar Black/IIT March Room.
MICE Installation and Commissioning meeting RAL, 12 June 2007 Diffuser Oxford University.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
12 March 2006NFMCC Meeting, IIT, Chicago1 Progress on the MICE Cooling Channel and Tracker Magnets Michael A. Green Lawrence Berkeley Laboratory.
MICE Collaboration Meeting Harbin, China 13 – 17 January 2009 Integration Issues By Wing Lau, Oxford University.
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
Solenoid Magnetic Field Mapping Paul S Miyagawa University of Manchester Introduction Mapper machine Mapper software - Simulation - Corrections - Fitting.
MICE magnetic measurements Sequence of events and MICE hall movements Alain Blondel – 10-April 2012 revision from 13 December 2012.
US CMS DOE/NSF Review: May 8-10, Endcap Alignment Dick Loveless DOE/NSF Review 9 May 2001.
MUON_EDR-06 (Alignment) Enrique Calvo Alamillo February 28-March 1, 2002 Link Mechanics: Status.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Ciemat Mechanical Structure Proposal for a DHCAL m 3 Prototype. Enrique Calvo Alamillo Paris
MARS 2 Design Review-Optomechanical Review 07 Nov 2002 GLW1 MARS 2 Mechanical Design Review.
TIB-TID insertion test into the CMS Tracker cylinder ________________________________________________________ Tracker week july 04
ATLAS Inner Detector Magnetic Field I am responsible for providing the magnetic field map for the ATLAS Inner Detector.  6m long x 2m diameter cylindrical.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
Some Thoughts on Magnetic Measurements for MICE Michael A. Green Lawrence Berkeley Laboratory Berkeley CA 94720, USA.
MICE magnetic measurements: AFC considerations Alain Blondel see a previous discussion for reference in CM35 (Feb 2013 slides by V. Blackmore, A. Blondel.
F. Garnier, P-A. Giudici, F.Bergsma CERN MICE Collaboration Meeting No. 28 Absorber Systems & MICE Magnets Session 6 October 2010 technical drawings by.
Magnet Measurement Device for MICE F. Garnier, P-A. Giudici, F.Bergsma CERN MICE Collaboration Meeting No. 29 RAL technical drawings by O.Jamet.
PRY Implementation - Contents l Fit with Experimental Devices (& services connections) l Fit with Tracker Cryo l Fit with Floor & Trench l Fit with Mezzanine.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
CM25 Engineering 1 4 Nov 2009 DIFFUSER Carousel (~50kg) Driven by air motors – 3 separate ‘actions’ 1.Carousel rotation 2.“30 degree rotation’’ Transfers.
ATF2 Magnets etc. 1. Magnets 2. Power supplies 3. Magnetic field measurement 4. Movers and supports R. Sugahara May 30, 2005.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
A simple clamping device for the Solid absorber Wing Lau, Oxford.
1 Modular Coil Assembly Fixture (MCAF) Information Meeting February 23, 2005.
1 Status of infrastructure MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation.
Redesign of LumiCal mechanical structure W.Daniluk, E.Kielar, J.Kotula, K.Oliwa, Wojciech Wierba, L.Zawiejski Institute of Nuclear Physics PAN Cracow,
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
IMMW15 FNAL USA AUGUST 21-24, 2007 Pneumatic motor Gear system Operation in magnetic field Control Performance The ATLAS pneumatic solenoid mapper F. Bergsma,
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
LumiCal High density compact calorimeter at the ILC Wojciech Wierba Institute of Nuclear Physics PAS Cracow, Poland.
1 MICE CM25 Engineering Session Summary Contents: Infrastructure Diffuser Coupling Coils Radiation Shutter AFC module EMR Andy Nichols, STFC, 4-7 th November.
Integration of the Spectrometer Solenoid Magnets
NEW UPGRADE TO THE APS MAGNETIC FIELD INTEGRAL MEASUREMENT SYSTEM
“CENTRAL SUPPORT FRAME” -
Mechanical Design Review February 25, 2008 Université de Montréal
Test Beam Request for the Semi-Digital Hadronic Calorimeter
Mechanical Design Review February 25, 2008 Université de Montréal
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Hybrid Engine Test Stand
RD51-WG X June test beam experience: useful information for October
MICE CM29 Magnets Summary
Ongoing and to do work M.Lenti.
Controls & Monitoring in MICE
Integration and IR Hall
Magnetic measurements at ambient temperature on the MQXFBP1
Presentation transcript:

Magnet Measurement Device for MICE F. Garnier, P-A. Giudici, F.Bergsma CERN MICE Collaboration Meeting No July 2011 Oxford technical drawings by O.Jamet

Layout CM29 Servo motor with encoder Trolley with B-sensors Rails Cradles ¼ pipe of aluminum Tooth belt Service module

supports No support inside magnet independent of magnet shape Layout CM29 Revolving disc step size 5 degree

5 m 2 m 400 mm cradles Cradles need rectification

sticks out stays inside 400 mm diameter Non-conducting materials used against eddy currents

sticks out not inside 400 mm diam. gearbox 1/12 no clearance

target support for survey disk for spectrometer solenoid disk for AFC

removable extension plate

detachable service module NMR test stand for B-sensors Check on B-sensor calibration For details on calibration see IMMW15 workshop

Rotation in steps of 45 deg. over two axes NMR

5m version for spectrometer solenoids 2m version for focus absorber solenoids. Extension disk to by-pass internal flange AFC Need to measure from both sides 2m version could be used to measure eventually coupling coils Extension disk for AFC dismountable This flange cannot be removed and cannot be surpassed by rail support

Mounting of B-sensors main disk

extension disk Mounting of B-sensors

Measurement grid Disk can be rotated in steps of 5 degree 180 mm sensor has to be removed for this region /R140

Strategy mechanics: 1 build 5 m version, test precision with laser tracker 2 if precision insufficient add encoder and rack and/or foresee laser tracker during measurements etc 3 build 2 m version DAQ: Build simple read-out for 7 B-sensors Anticipate to have interface outside high field region Accuracy: < 0.5 mm longitudinal +/- 0.5mm radial Theta +/- 1 mrad Bx,By,Bz +/- 2 mT Check in situ with NMR on service module very unlikely

Status Rail support send to company to rectify Will come back this week => bench ready for final assembly Motion: motor with gearbox tested in vertical bench with 2.5 kgf load and 7.5 kg mass. Works fine, clearance within limits B-sensors ready and calibrated Read-out: basics exist ( used in calibrator with 4 cards), parts exist duplicate electronics board Ready at August 2011 for AFC (small version) should be send to CERN !