MAINTENANCE PART 2. Inlet free of obstructions Inlet free of obstructions Adequate scour protection provided.

Slides:



Advertisements
Similar presentations
Maintaining the Lawn.
Advertisements

DAY ONE - STEP ONE - Preparation Pure Crete is added to a water truck with a spray bar located at the rear of the truck at a ratio of one gallon to 2000.
Soil Mechanics - II Practical Portion.
Objectives Be able to use basic volume weight equations
Using CFB Ash As A Substitute For Portland Cement In Full Depth Reclamation Presented By Steve Dixon, Civil & Environmental Consultants, Inc. Jim Panaro,
ENGINEERING MATERIAL PROPERTIES (CE1303)
Sandbagging Techniques
Earthwork Operations & Equipments
Chemical Stabilization of Subgrades Section Engineers ’ Meeting Lake Cumberland State Resort Park March 5-7, 2013.
Soil Sampling For Home Landscape and Garden Developed by: Dr. Teri Hamlin Georgia Department of Education.
Soil Cultivation. Introduction By cultivation we mean the preparation of the soil for sowing or planting by digging, rotavating or ploughing. In a domestic.
Trenching and Excavating Safety. Asphyxiation Each time a breath is exhaled the weight of the load restricts inhalation of the next breath. Slow suffocation.
Earth and Rockfill Dams
Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.
PAVEMENT MAINTENANCE II Part 1b: Chip Seal Construction Idaho Roads Scholar Program.
SOIL MECHANICS & TESTING
Chapter 3 Compaction. To improve the density and other properties of soil Increases the solid density improves strength Lowers its permeability Reduces.
HOW TO DO Soil Sampling. Purpose Determining the fertility level of a soil through a soil test is the first step in planning a sound lime and fertilization.
Chapter 33 Foundation Systems.
Foundation Systems.
ROOF MATE Step-By-Step Application Over MODIFIED BITUMEN ROOFING Master Guide Specifications List of materials: ROOF MATE WHITE ROOF MATE BASECOAT ROOF.
Dr. Sophia Hassiotis.  Laboratory set up  Personal Protective equipment  Directions for mixing  Slump test  Cylinder casting  Cleaning up your station.
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
Proctor Compaction Test for Maximum Dry Density
Canola Harvesting BY Derek Thoms. What can be used to harvest canola This is a grain head which is used to harvest small grain products like canola. This.
Erosion is the process by which the land surface is worn away by the action of wind, water, ice, or gravity - it is the process where soil particles are.
Earthwork: Use of Fine Grained & Granular Material.
Vegetation Establishment. Exposed soil occurs on all construction sites.
7. Soil Compaction (Das, chapter 6)
Rocks, Weathering, and Soil Information
CONSOLIDATION OF SOILS and HYDROCOMPACTION
Lecture 11 Advance Design of RC Structure Retaining walls
CONSTRUCTING A FIVE CABIN LATRINE
FOUNDATION.
Placing Quality Concrete
Cultivation & Layering Information courtesy of Texas A&M University Turf Grass
Horticulture CD Unit C 4-2: Nursery, Landscaping, and Gardening.
Annual & Perennial Bed Preparation Herbaceous Plants.
The sand filter has to be moved from this location. The embankment cross section used in the slope stability analysis did not include the sand filter.
Eng. Malek Abuwarda Lecture 11 P1P1 Construction Methods Lecture 11 Compaction Equipment and Procedures.
Excavation Instructional Goal: through class participation and discussion, the participant will identify the issues and hazards related to trenching and.
Excavation Below Subgrade (EBS)
RFB MANDATORY PRE-BID CONFERENCE * The material contained herein is for informational purposes only 1.
Compaction and Stabilization Equipment
ROOF MATE Step-By-Step Application Over CONCRETE ROOFING
. Introduction Rice crop is sensitive to water stress causing reduction in quality and quantity of yield. Therefore management of irrigation is of uttermost.
Planning for Earthwork Construction
Preparing Foundations for Cylinders & ASME Tanks
UNIT: CONCRETE/MASONARY
Soil Compaction Topic I Topic I.
Horticulture II - Landscape Unit C Landscape Installation and Maintenance.
Soil and Rock Soil and rock are the principle components of many construction projects. Knowledge of their properties, characteristics, and behavior is.
Horticulture II - Landscape UNIT C LANDSCAPE INSTALLATION AND MAINTENANCE.
Unit 7: Tillage & Seeding
Soil Sampling for Fertilizer and Lime Recommendations.
Mrs. Halkiades CCCHS Fall Lawns  Major part of most home landscapes 1. Add beauty 2. Play areas 3. Cover to control soil erosion.
BUILDING CONSTRUCTION ( ). 1. BHOL SUFIYAN [ ] 2. CHAVDA KRUNAL [ ] YEAR: 2 ND SEM: 3 RD CIVIL ENGINEERING DEPARTMENT PRESENTED.
Soil mechanics and foundation engineering-III (CE-434)
Riprap Installation Construction Inspection for Field Office Activities Will use Riprap Gradation and Riprap Subgrade Problems from Class Problem Section.
Quantity Calculations Module 3. Quantity Calculations  Specifications  Post Bid Quantity Calculations  Production Quantity Calculations –Checking Yield.
Road making chemical Environmentally friendly
SOIL COMPACTION GEOLOGY AND APPLIDE GEOLOGY -:Prepared By:- GEC,GODHRA
Types of Protection Introduce the module. Trenching & Excavations Continuing Education Third Quarter 2017 Session 2.
Flood: Build a Stronger Plinth
إختبار وتقييم المنشآت الخرسانية
How to install pavers..
Stability of Slopes By: Alka Shah Civil Engineering Department
Soil Formation Soil – The loose, weathered material on Earth’s surface in which plants can grow. How is soil formed? Mechanical and chemical weathering.
Earth and Rock fill Dams
Presentation transcript:

MAINTENANCE PART 2

Inlet free of obstructions

Inlet free of obstructions Adequate scour protection provided

Positive Seal on Flap Gate Adequate Scour Protection Provided

Tree growth next to levee toe

CATTLE WALK DAMAGE BULL RUB

CATTLE WALK AND BULL RUB DAMAGE

LEVEE SLIDE

TECHNICAL PROVISIONS FOR FULL BLEND LEVEE REPAIRS Levee Excavations : Approximately 6 to 12 inches of topsoil shall be removed from the slide area and stockpiled for re-use. The excavation line must extend at least (1 ft ) below the failure slide plane. At the toe of the excavated slope, a key approximately (3 ft. ) deep and of minimum width to be compacted by conventional equipment shall be excavated. The end slopes of the levee excavation shall be ( 1 ft. ) vertical on (3 ft. ) horizontal to allow for access and proper compaction. The stockpiled soil shall not exceed (6 ft ) in height if placed on the existing levee slope. Preparation of Foundation: All trees, brush, sod, vegetation, decayed organic matter, stumps and debris of every description shall be removed from the foundation surfaces. Also, grubbing may be required but is uncommon for these foundations. The entire earth surface on or against which levee fill is to be placed, shall be thoroughly broken to a depth of 6 inches. If for any cause, this broken surface becomes compacted a plane of seepage or weakness might be induced, therefore it shall again be adequately scarified before depositing material thereon. Soil Processing Areas: When the size of the slide being repaired permits, and it is practical, the lime-soil mixture can be processed in lifts in the embankment and then compacted. Lift thickness shall not exceed 6 to 8 inches. If a processing area is needed to process material removed from the slide, 4 to 6 inches of topsoil shall be removed from the area and stockpiled for re-use. The processing area shall be large enough to mix a minimum of on truck load of lime (approx 24 tons) and be located riverward of the existing levee.

Spreading and Mixing Lime: After the excavated soil to be treated with lime is placed in the processing area in 6 to 8 inch layer, checks should be made to ensure proper moisture content. The dry unit weight of 80 lbs per cubic foot will be used for the soil to compute the required rate of application of lime by weight. Approx 4.8 lbs of lime per cubic ft of material should be used. In highly plastic clays a double application of lime will be required to achieve satisfactory pulverization. Six percent of more lime will require the double application method. The first application of lime, which will be one-half the total recommended percentage, shall be mixed by at least one pass with a rotary pulverizer and sealed to maintain moisture and allowed to cure for a minimum of 48 hrs. After the 48 hour curing time the remainder of the lime shall be added. After application of lime a liberal amount of water shall be applied over the surface to prevent dusting and achieve good distribution of the lime. Water shall be added even if the moisture content is above the optimum moisture content for compaction. A high speed rotary pulverizer shall be used to mix the soil and lime. Several passes of the rotary pulverizer may be required. After final mixing of lime with soil, the mixture shall be placed in the embankment and compacted as soon as possible. When moving the soil – lime mixture from the processing area precautions shall be taken to avoid unmixed material. Any lime that has been exposed to the open air for a period in excess of 6 hours, and lime lost or damaged before soil incorporation due to rain, wind or other cause should not be used.

Embankment. The lime-soil mixture shall be placed in the levee embankment by conventional methods. The moisture content of the lime- soil mixture, to be compacted, shall be within a specified range. Lift thicknesses will be limited to 6 to 8 inches. The soil-lime mixture shall be benched into the existing embankment in a stair stepped pattern at approximately 1-foot intervals. Each lift shall be compacted by at least three passes of a crawler type dozer weighing at least 20,000 pounds and exerting a unit tread pressure of at least 6 pounds per square inch or other compacting equipment which will attain comparable compaction. A pass shall consist of one complete coverage of the surface of a layer by the treads of a dozer or other compacting equipment. Turfing. After completion of the reconstruction operation, the previously removed top soils shall be returned and distributed over their primary locations, and the portions of the levee and berms where the new fill has been placed shall be fertilized and seeded.

Fertilizing. Prior to seeding, all processing areas, the entire surface of the repaired portions of the levees, berms, and all areas distributed shall be fertilized. Fertilizer shall be applied at the rate of 60 lbs per acre of commercial fertilizer. Fertilizer shall be uniformly distributed over the surface and worked into the top 2 to 4 inches of the soil by light disking or harrowing. Seeding. After completion of the fertilizing operation, all processing areas, the entire surface of the repaired portions of the levees, berms, and all areas disturbed shall be seeded. Compaction. After completion of the seeding, the areas of the levees and berms shall be compacted by making one complete pass over the entire surface. A pass shall consist of one complete coverage of the surface by compacting equipment.

TOP SOIL REMVOVED FROM SLIDE AREA

Processing lime/soil mixture