Chevron’s Power Performance Monitoring Solution

Slides:



Advertisements
Similar presentations
Gas Plant Operation and Maintenance Overview Presented by Geoff Vail.
Advertisements

Total Productive Maintenance
This document and any attachments contain proprietary information and are the sole and exclusive property of Mitsubishi Power Systems Americas, Inc., MPSA.
KPI Familiarisation.
Helping Customers Lower TCO through Flowserves Technology Advantage Helping Customers Lower TCO through Flowserves Technology Advantage Web Portal Web.
Water Purification with Complete Remote Monitoring System.
SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department.
PSE&G Condition-Based Maintenance
Plant Operations. Throughput & Waste Types 2 Process Trains equating to 40,000 tonnes pa Expansion to 3 Trains will give 60,000 tonnes pa Hazardous and.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. CCGT Plant Optimisation using Real Time Data Regional Seminar Series.
© AberdeenGroup 2009 Energy Management: Driving Value in the Industrial Environments Mehul Shah Research Analyst Matthew Littlefield Sr. Research Analyst.
The power of three - realize the potential
© 2008 OSIsoft, Inc. | Company Confidential ROMPETROL’S REAL TIME INFORMATION SYSTEM: a road from PLANT OPERATIONS FIELD DATA to MANAGERIAL DECISIONS.
1 OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential OCEANIA TECHNOLOGY SEMINAR 2008 How PI Notifications ensures that SmartSignal’s.
What is a Good SmartSignal Model?
COMBINED HEAT & POWER J.R. Simplot Mountain Home, Idaho.
COMPANY PROFILE PYRAMID ENGINEERING PRIVATE LTD. THE COMPANY The Company was established in 2007, with a small group to provide Plant Maintenance, Small.
Responsible CarE® Employee health and Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Empowering Business in Real Time. © Copyright 2009, OSIsoft, LLC. All rights Reserved. Regional Seminar Series Houston October 28, 2009 Flowserve’s Technology.
1 © 2006 OSIsoft, Inc. – Company Confidential Enterprise Agreement (EA) Offering And Benefits May 2007 Value Now, Value Over Time.
Engineering Technology Division
© ABB Group August 13, 2015 | Slide 1 Power Generation Service Life Cycle Management for Power Plants Daniel Looser, Power Gen Europe in Amsterdam, June.
Organizational Structure ENERGY UTILITIES (Regulated) 2012 Statistics  $4,362M Revenue  $15 B Assets  $372M Earnings  9,800 Employees TECHNOLOGYSTRUCTURES.
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
The Maintenance and Engineering Organization
Overview of Distributed Generation Technologies June 16, 2003 Harrisburg, PA Joel Bluestein Energy and Environmental Analysis, Inc.
ADDED VALUE APPLICATIONS ~ ENABLED THROUGH PI Jerry Weber, Thermal Performance Specialist Frank Borth, Performance & Data Engineer Wayne Benedeck, Thermal.
COMBINED HEAT & POWER J.R. Simplot Mountain Home, Idaho.
Server Virtualization: Navy Network Operations Centers
Empowering Business in Real Time. © Copyright 2010, OSIsoft,LLC. All rights Reserved. Portal Visualization: Using Microsoft SharePoint and OSIsoft’s PI.
By: Gatut Widianoko Weatherford Artificial Lift Systems
Fleet Performance and Reliability in Generation Utilities
Remote Visual Inspection
Current Job Components Information Technology Department Network Systems Administration Telecommunications Database Design and Administration.
Jeff Ray, EIT Project Engineer, Treatment & Recycle Engineering Broadband Access Points & Programmable Logic Controllers Replacement – Phase 1 Project.
2 © 2005 OSIsoft, Inc. – Company Confidential Paul Ireland Manager – Information Engineering, RWE npower Technology Services P I.
1 © 2008 OSIsoft, Inc. | Company Confidential Edison Mission Energy: PI for the Next Generation (of Generation) OSI Regional User Conference 10/09/08 Jerry.
© 2009 IBM Corporation Let’s Build a Smarter Planet Thongchai Watanasoponwong – Country Manager Power Systems, STG September 15 th, 2009 Green IT เทคโนโลยีสีเขียวเพื่อสิ่งแวดล้อม.
PI – An Enterprise Integration Tool Mark Brown – Calpine Corporation Mark Bowles – Calpine Corporation Sam Jenkins – Calpine Corporation.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. The Use of PI at International Power Regional Seminar Series Lee.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. ROMPETROL’S REAL TIME INFORMATION SYSTEM a road from PLANT OPERATIONS.
SCSC 311 Information Systems: hardware and software.
Empowering Business in Real Time. © Copyright 2009, OSIsoft, LLC. All rights Reserved. Value of Partnerships and Collaboration for World Class Performance.
Biomass CHP Project at Pilgrim Hospital Boston United Lincolnshire Hospitals NHS Trust.
Copyright © 2007 OSIsoft, Inc. All rights reserved. Ekho - MES Applications that leverages AF 2.0 Yannick Galipeau Inexcon Technologies Patrick Ramsey.
Real Time Financial Analysis in Process Plants (Energy and Performance Information System)
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
Convert Gas Pneumatic Controls to Instrument Air Lessons Learned from Natural Gas STAR Partners EPA’s Natural Gas STAR Program, Pioneer Natural Resources.
The MIT/QA Plan Issue W. Reiersen. Terminology 1 Product specification: A document generated by the customer identifying requirements and the inspections.
Life cycle services for automation products
Real Time at TransAlta Presented by: Keith Christianson March 4 th, 2002 Monterey, California.
EAS Lessons Learned Summary Lessons Learned Published in June 2014.
International Atomic Energy Agency 1 Grid, Industrial involvement and procurement Akira OMOTO DIR, NENP.
PI in a Modern Power Plant – American National Power, Inc. PI User Conference ‘03 Presented by: Brian M. Wood, American National Power, Inc More Uses Than.
CM Tools Data Management Trends Wednesday, June 4, 2008 Laurent Perkins Enterprise Informatics.
Cho Nai Cheung Accidental Release Prevention Engineer, Supervisor Hazardous Materials Programs June 14 th, 2012.
Evolution of PI in an Expanding Utility’s Strategy John L. Ragone KeySpan.
"... To design the control system that effectively matches the plant requires an understanding of the plant rivaling that of the plant's designers, operators,
Risk-informed On-Line Maintenance at Cofrentes NPP IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA.
Putting Performance in Context Keys to Closing The Performance Gap Maureen Coveney, OSIsoft Todd Spencer, SmartSignal Michael Saucier, Transpara.
1 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group via LiveMeeting June 18, 2008 Transmission & Distribution Webinar PI for Asset Model and.
Presented by The Emerging Role of the PI System in Caterpillar’s Condition Monitoring Service David Krenek – Global Petroleum Market Professional.
CLN emission reduction for non-DLE LM gas turbines Agenda 1.Introduction to VBR Turbine Partners 2.Two options to reduce emission levels of non-DLE LM.
Engineering Services Predictive Maintenance. Página Web Página Web
California Refinery Overview and Fuel Use Transportation Fuel Supply Reliability Due to Reduced Natural Gas Availability San Pedro, CA June 17, 2016 Gordon.
Presented by Jon Pastuszynski, Lead M&D Engineer
Performance indicators Unplanned unavailability
UMCP Learning Objectives
Regional Seminar Series Southern California
KPI Familiarisation
Presentation transcript:

Chevron’s Power Performance Monitoring Solution Presented by: Ken Yoss Roy Blanco

Agenda Power Support Center Overview PSC Performance Monitoring Solution PSC Workflow Process El Segundo Refinery CHP Overview Case Studies Q&A

Power Support Center Capabilities Monitoring & Diagnostics Center Power Solutions Network Business planning support Operations philosophy and tools Maintenance philosophy and tools Engineering and technical solutions Performance monitoring/trip analysis Training/OC development Equipment modifications and upgrades

Power Support Center Organization Central PSC Office Turbine Parts QA/QC Management: Turbine Metallurgist Expertise Equipment Assessment & Upgrades Major Inspection Management O&M Philosophy & Tools: OE Compatible Refineries Performance Monitoring & Diagnostics Engineering Analysis Oil & Gas Operations Project Management PI Administration YOSS: Upstream and downstream power facilities are STAFFED AS POWER IS NOT AN INHERENT SKILL SET CORE TO UPSTREAM AND DOWNSTREAM BU’S. Generally with SHORT ROTATIONS, new hires and LITTLE POWER EXPERIENCE PSC: ME’S EE/I&C’S METALLURGISTS ENG ASSIST CGP SITE EXPERTISE IN DEVELOPMENT AND TROUBLESHOOTING EMERGENCIES AND SPECIAL PROJECTS ETC/CES SITE STAFF AND OPERATORS/TECHNICIANS The PSC SUPPORT MODEL is designed TO FILL GAPS, and provide an EXTRA SET OF EYES for site staff supporting sustained power reliability performance. The PSC provides all the skill sets found at the most reliable power utility power plants which would make no sense to develop at each upstream or downstream facility. PSC will spread these skill sets as shared resources to all upstream and downstream power facilities. There will be one designated PSC Operations Engineer working out of Houston responsible as the primary contact point continuously analyzing and supporting his/her site while also connecting the variety of PSC power skill sets on appropriate projects and initiatives at there upstream or downstream site. KPI Tracking Business Plan Development

PSC Performance Monitoring Solution OSIsoft EA for data infrastructure ProcessBook Datalink To come: MD RT Webparts via SharePoint AF2.0 & Notifications Etc. SmartSignal for predictive analytics SmartSignal EPI*Center SmartSignal participates in the performance monitoring portion of the weekly PSC/ES teleconference. Transition to Chevron hosted, monitored and maintained instance of EPI*Center. Develop process displays to represent operational data. The purpose of the displays is two-fold; to provide the engineer a means of tracking plant operation and performance, to provide a means of presenting data to users with other disciplines in an efficient and constructive format.   The initial displays are standard presentations of the following power or steam plant; Combustion turbine Steam turbine Heat recovery boiler Boiler systems Cooling tower and condenser systems Switchyard status Fuel systems Boiler feed water systems Wind turbine data The displays will provide links to subsystem displays based on level of detail required. Inlet and exhaust data Steam data Etc in sub-displays, statistical representation of key process variables. Alarm values for process variables with graphical display elements Ad-hoc trending at every display level The RTWebparts applications carry over to a hyper threaded interface (internet style) the features of processbook and datalink. Web based application does not require user to install PI applications on machine Provide a robust development environment with potential for numerous third party applications with features and applications Ease of linking data on network cloud to portable devices without requiring an specific OS on device Generally an easier to support, but harder to develop, modular database The modular data is used to provide data that is not provided by typical tag database Modular data can be used in displays that appear data source independent Modular data can be used with alias tag names to provide generically named process variables such as HP Steam Pressure, as opposed to a specific point name field and separate tag description field Modular database lends itself to a modular design of graphic displays and data analysis Unit display can link to multiple units’ process values Process tuning parameters, set point values, alarm ranges etc. can be graphically represented dynamically Engineering drawing, process control sheets, P&ID’s references and other static data can be made available within displays as requested by user’s selection of a menu brought up by a right hand mouse click. As a result, documents and other knowledge based links that may be required for troubleshooting are listed in context. ProcessBook can use P&ID’s and other drawings to graphically display contextual operational data.

El Segundo Refinery CHP Overview Located on the Pacific coast in El Segundo, CA just south of LAX. 3 - Cogeneration Trains (GE Frame 6Bs, dual pressure HRSGs), + 170,000 hrs. 1 - Steam Turbine Generator 1 - Auxiliary Boiler 2 - Sets of BFWPs http://www.laalmanac.com/weather/we19.htm (weather data) http://los-angeles-lax.airports-guides.com/lax_climate.html

Case Study: High Steam Drum Conductivity

Case Study: High Steam Drum Conductivity

Case Study: High Steam Drum Conductivity

Case Study: High Steam Drum Conductivity

Case Study: High Steam Drum Conductivity

Case Study: High Steam Drum Conductivity Value delivered: Long term reliability Confirmation of equipment issues

PSC Performance Monitoring Workflow Weekly Calls Email Direct Calls APC Plant Engineer Chevron Power Facilities PSC Ops Engineer PSC Ops Engineer SmartTracking Portal & Log Summary Reports OSIsoft EA

Case Study: NH3 Over Injection 11/7/2008: PSC received phone call from SmartSignal APC informing of a NH3/air ratio High Rule posting on the WatchList.

Case Study: NH3 Over Injection

Case Study: NH3 Over Injection 16 Note: Identified in SmartSignal – Trended in PI for visual aid. 16

Case Study: NH3 Over Injection Value delivered: Decrease in NH3 release to atmosphere $ decrease in NH3 purchases Operational procedures/training modified 17 Note: Identified in SmartSignal – Trended in PI for visual aid. 17

PSC Performance Monitoring Workflow Weekly Calls Email Direct Calls APC Plant Engineer Chevron Power Facilities PSC Ops Engineer PSC Ops Engineer SmartTracking Portal & Log Summary Reports OSIsoft EA

Case Study: NH3 Control Valve

Case Study: NH3 Control Valve

Case Study: NH3 Control Valve

Case Study: NH3 Control Valve

Case Study: NH3 Control Valve Path forward: Find optimal NOx ppm setpoint for SCR efficiency and operability Upgrade the SCR system

PSC Performance Monitoring Workflow Weekly Calls Email Direct Calls APC Plant Engineer Chevron Power Facilities PSC Ops Engineer PSC Ops Engineer SmartTracking Portal & Log Summary Reports OSIsoft EA

Performance Monitoring Value PI (1 year) Confirmed – 3 trip avoidances Potential – 6 trip avoidances Equipment Abnormalities – Over 70 abnormalities monitored - - - > long term reliability SmartSignal (3 months) Equipment Abnormalities - 14 identified that either returned to normal or communications to plant lead to corrective actions. - - - > long term reliability Instrumentation Issues – Over 35 identified resulting in a potential increase of plant reliability. - - - > long term reliability Efficiency - 2 efficiency catches resulting in the scheduling of a water wash and NH3 injection reduction. Culture Change PSC has noticed plant personnel are more cognizant of equipment abnormalities that are not yet urgent. Operational procedures have been modified to prevent less than optimal operational conditions. The PI implementation is off the shelf and only consists of trending, no advanced calculations or alerts currently exists. The SmartSignal implementation was performed by the APC

& Q A