Managing Project Scope

Slides:



Advertisements
Similar presentations
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Advertisements

CHAPTER 5: Identifying and Selecting Systems Development Projects
Initiating and Planning Systems Development Projects
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Chapter 6 Initiating and Planning Systems Development Projects 6.1.
Project Estimation Describe project scope, alternatives, feasibility.
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Copyright 2002 Prentice-Hall, Inc. Chapter 5 Identifying and Selecting Systems Development Projects 5.1 Modern Systems Analysis and Design Third Edition.
Modern Systems Analysis and Design Third Edition
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
© 2008 by Prentice Hall 1 Chapter 2. © 2008 by Prentice Hall 2 Project – a planned undertaking of related activities to reach an objective that has a.
Chapter 4 Determining Feasibility and Managing Analysis and Design Activities Systems Analysis and Design Kendall & Kendall Sixth Edition.
Feasibility By Garrett Jones and Ryan Butler. All projects are feasible given unlimited resources and infinite time. Unfortunately, most projects must.
Chapter 5 Initiating and Planning Systems Development Projects
Copyright 2002 Prentice-Hall, Inc. Chapter 5 Identifying and Selecting Systems Development Projects 5.1 Modern Systems Analysis and Design Third Edition.
Introduction to Project Management Chapter 5 Managing Project Scope
Initiating and Planning Systems Development projects
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Chapter 5 Initiating and Planning Systems Development Projects
© 2006 ITT Educational Services Inc. SE350 System Analysis for Software Engineers: Unit 6 Slide 1 Chapter 5 Initiating and Planning Systems Development.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 6 Initiating.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 4.1.
Chapter 4 Identifying and Selecting Systems Development Projects
© 2006 ITT Educational Services Inc. SE350 System Analysis for Software Engineers: Unit 3 Slide 1 Chapter 4 Identifying and Selecting Systems Development.
© 2005 by Prentice Hall Chapter 4 Identifying and Selecting Systems Development Projects Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer.
Copyright 2002 Prentice-Hall, Inc. Lecture 5 Identifying and Selecting Systems Development Projects 5.1 COSC4406: Software Engineering.
1 Identifying and selecting system Development project Chapter-4.
MBI 630: Class 3 9/12/2009 OUTLINE OF CLASS Discussion –Identifying and Selecting IS Development Projects –Initiating and Planning System Development Projects.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 4.1.
Chapter 4 Identifying and Selecting Systems Development Projects
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 6 Initiating.
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Chapter 5 Initiating and Planning Systems Development Projects Modern Systems Analysis and Design.
Chapter 5 : Initiating and Planning Systems Development Projects.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 3 Systems Planning and Selection 3.1.
© 2005 by Prentice Hall Chapter 5 Initiating and Planning Systems Development Projects Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer.
McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 3 Identification and Selection of Development Projects.
4-1 © Prentice Hall, 2007 Chapter 4: Selecting and Planning Projects Object-Oriented Systems Analysis and Design Joey F. George, Dinesh Batra, Joseph S.
Lecture 5. Review of Lecture 4 - Communication – definition - Communication processes: - Communication Planning -Information Distribution -Performance.
Ch 4 - Learning Objectives Scope Management You should be able to: n Discuss the relationship between scope and project failure n Describe how strategic.
Information Systems System Analysis 421 Class Three Initiating and Planning Systems Development Projects.
Chapter 5 Initiating and Planning Systems Development Projects MIS 215 System Analysis And Design.
Chapter 5 Initiating and Planning Systems Development Projects Modern Systems Analysis and Design Sixth Edition Jeffrey A. Hoffer Joey F. George Joseph.
BIS 360 – Lecture Four Ch. 5: Identifying and Selecting Projects
Cis339 Chapter 4 Identifying and Selecting Systems Development Projects 4.1 Modern Systems Analysis and Design Fifth Edition.
Cis339 Modern Systems Analysis and Design Fifth Edition Chapter 5 Initiating and Planning Systems Development Projects 5.1.
Chapter 5 Initiating and Planning Systems Development Projects Modern Systems Analysis and Design Fifth Edition Jeffrey A. Hoffer Joey F. George Joseph.
NURHALIMA 1. Describe steps involved in the project initiation and planning process Explain the need for and the contents of a Statement of Work and Baseline.
Chapter 4 Identifying and Selecting Systems Development Projects Modern Systems Analysis and Design Sixth Edition Jeffrey A. Hoffer Joey F. George Joseph.
© 2008 Prentice Hall5-1 Introduction to Project Management Chapter 5 Managing Project Scope Information Systems Project Management: A Process and Team.
Chapter 4 Identifying and Selecting Systems Development Projects Modern Systems Analysis and Design Sixth Edition Jeffrey A. Hoffer Joey F. George Joseph.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Essentials of Systems Analysis and Design Fourth Edition Joseph S. Valacich Joey F.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 6 Initiating.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 4.1.
Project Estimation Describe project scope, alternatives, feasibility.
Chapter 5 Initiating and Planning Systems Development Projects
Modern Systems Analysis and Design Third Edition
Modern Systems Analysis and Design Third Edition
Chapter 6 Initiating and Planning Systems Development Projects
Business System Development
Chapter 3 Managing the Information Systems Project
Chapter 4 Systems Planning and Selection
Chapter 4 Systems Planning and Selection
Systems Planning: Project Feasibility
Chapter 4 Systems Planning and Selection
Chapter 5 Initiating and Planning Systems Development Projects
Lecture 6 Initiating and Planning Systems Development Projects
Modern Systems Analysis and Design Third Edition
Chapter 5 Initiating and Planning Systems Development Projects
Chapter 6 Initiating and Planning Systems Development Projects
Presentation transcript:

Managing Project Scope

Five Process Phases of Project Management Initiate Plan Execute Monitor and Control Close

Project Initiation The process of authorizing a new or continuing an existing project Four initiation activities: Identifying projects Classifying and ranking projects Selecting projects Establishing the project charter

1. Identifying Information Systems Development Projects Identification can be made by: Top management or chief executive officer Strategic focus Steering committee Cross-functional focus User department(s) Tactical focus IT development group or IT management System integration focus

Two Basic Project Planning Approaches Isolated – attempts to solve individual organizational problems What procedure (application program, technology, process) is required to solve this particular problem as it exists today? Dependent on current organizational infrastructure

Two Basic Project Planning Approaches (cont.) Planned – systematic identification of project that will provide solutions today and into the future What will satisfy the decision-making needs or business processes of the enterprise today and well into the future? Independent of current infrastructure constraints

Corporate Strategic Planning An ongoing process that defines the mission, objectives, and strategies of an organization Required if project selection is going to be successful Three-step process The current organization must be reviewed and understood Management decides on future direction Strategic plan is developed for transition from current to future state

Strategic Planning Requirements: Mission Statement Statement that makes it clear what business the company is in Objective statements Series of statements that express an organization’s qualitative and quantitative goals for reaching a desired future position Sometimes call Critical Success Factors or Corporate Values Competitive Strategy Method by which an organization attempts to achieve its mission and objectives

Generic Competitive Strategy Description Low-Cost Producer This strategy reflects competing in an industry on the basis of product or service cost to the consumer. For example, in the automobile industry, the South Korea-produced Kia is a product line that competes on the basis of low cost. Product Differentiation This strategy reflects capitalizing on a key product criterion requested by the market (e.g., high quality, style, performance, roominess). In the automobile industry, many manufactures are trying to differentiate their products on the basis of quality (e.g., “At Ford, quality is job one.”). Product Focus or Niche This strategy is similar to both the low-cost and differentiation strategies, but with a much narrower market focus. For example, a niche market in the automobile industry is the convertible sports car market. Within this market, some manufactures may employ a low-cost strategy while others may employ a differentiation strategy based on performance or style.

Planning An orderly means of assessing the needs of an organization and defining the systems and technologies that will best satisfy those needs

Planning Methods Top-Down Bottom-Up Generic information systems planning methodology that attempts to gain a broad understanding of the information system needs of the entire organization Bottom-Up Generic information systems planning methodology that identifies and defines information systems development projects based upon solving operational business problems or taking advantage of some business opportunities

Classifying And Ranking Projects Completed by top management, steering committee, business units, or information systems development groups Criteria varies among organizations

Possible Evaluation Criteria When Classifying And Ranking Projects Description Value Chain Analysis Extent to which activities add value and costs when developing products and/or services Strategic Alignment Extent to which the project is viewed as helping the organization achieve its strategic objectives and long-term goals Potential Benefits Extent to which the project is viewed as improving profits, customer service, and so forth and the duration of these benefits Resource Availability Amount and type of resources the project requires and their availability Project Size / Duration Number of individuals and the length of time needed to complete the project Technical Difficulty / Risks Level of technical difficulty to successfully complete the project within given time and resource constraints

Business Case Justification that presents the economic, technical, operational, schedule, legal and contractual, and political factors influencing a proposed information systems project

Selected Feasibility Factors Economic Technical Operational Schedule Legal and contractual Political

Economic Feasibility Identify the financial benefits and costs associated with a development project Benefits Tangible or intangible Costs

Benefits Tangible – benefit derived from the creation of a project that can be measured in dollars and with certainty Cost reduction and avoidance; error reduction; increased flexibility; increased speed of activity; improvement of management planning and control; opening new markets and increasing sales opportunities Intangible – benefit derived from the creation of a project that cannot be easily measured in dollars or with certainty Competitive necessity; increased organizational flexibility; increased employee morale; promotion of organizational learning and understanding; more timely information

Cost Types Tangible cost Intangible cost Recurring cost One-Time cost Cost associated with an information system that can be measured in dollars and with certainty Intangible cost Cost associated with an information system that cannot be easily measured in terms of dollars or with certainty Recurring cost Cost resulting from the ongoing evolution and use of a system One-Time cost Cost associated with project start-up and development or system start-up

Cost-Benefit Analysis The use of a variety of analysis techniques for determining the financial feasibility of a project Present Value Discount Rate Net Present Value Break-even Analysis

Technical Feasibility Process of assessing the development organization's ability to construct a proposed system

Technical Project Risk Assessment Factors Project Size Project Structure Development Group User Group

Risk Assessment Matrix

Potential Technical Risks Failure to attain expected benefits from the project Inaccurate project cost estimates Inaccurate project duration estimates Failure to achieve adequate system performance levels Failure to adequately integrate the new system with existing hardware, software, or organizational procedures

Operational Feasibility Process of assessing the degree to which a proposed system will solve business problems or takes advantage of business opportunities What impact will the proposed system have on the organization’s structures and procedures?

Schedule Feasibility Process of assessing the degree to which the potential time frame and completion dates for all major activities within a project meet organizational deadlines and constraints for affecting change

Legal and Contractual Feasibility Process of assessing potential legal and contractual ramifications due to the construction of a system

Political Feasibility Process of evaluating how key stakeholders within the organization view the proposed system

Project Selection

Popular Selection Methods Value Chain Analysis The process of analyzing an organization's activities to determine where value is added to products and/or services and the costs incurred for doing so Multi-Criteria Analysis A project selection method that uses weighted scoring for a variety of criteria to contrast alternative projects or system features

Value Chain Analysis

Multi-Criteria Analysis

Establish a Project Charter A short document prepared for the customer during project initiation that describes what the project will deliver and outlines generally at a high level all work required to complete the project Typically contains: Project title and date of authorization Project manager name and contact information Customer name and contact information Projected start and completion dates Key stakeholders, project roles, and responsibilities Project objectives and description Key assumptions or approach Signature section for key stakeholders

Project Scope Planning Process of progressively elaborating and documenting the project work plan in order to effectively manage a project Occurs once a project has been formally selected for development

Project Scope Planning Activities Project workbook created Project scope statement written Baseline project plan is developed

Project Workbook Serves as the central repository for all project-related documents and information Contains all project correspondence, inputs, outputs, deliverables, procedures, and standards established by the project team Workbook can be paper or electronic

Project Scope Statement Document prepared for the customer that describes what the project will deliver and outlines generally at a high level all work required to complete the project Addresses: What problem or opportunity does the project address? What are the quantifiable results to be achieved? What needs to be done? How will success be measured? How will the end of the project be identified?

Baseline Project Plan Documents the best estimate of a project's scope, benefits, costs, risks, and resource requirements Four sections: Introduction System Description Feasibility Assessment Management Issues

Baseline Project Plan Introduction Provides a brief overview of the entire document and outlines a recommended course of action for the project

Baseline Project Plan System Description Documents possible alternative solutions in addition to the one deemed most appropriate for the given situation

Baseline Project Plan Feasibility Assessment Project costs and benefits, technical difficulties, and other such concerns are outlined Gantt charts and network diagrams illustrate high-level project schedules

Baseline Project Plan Management Issues Documents management concerns related to the project Typical issues include: Team configuration and management Communication plan Project standards and procedures Other project-specific topics

Project Scope Definition Process of subdividing the major project deliverables – as identified in the project scope statement – into smaller, more manageable activities in order to make more accurate cost, task duration, and resource estimates

Project Scope Verification Process of obtaining formal acceptance of a project’s scope from the project stakeholders

Project Scope Change Control Formal process for assuring that only agreed- upon changes are made to the project’s scope Submitted change request should address: Project specifications Project schedules Budgets Resources

Scope Creep Progressive, uncontrolled increase in project scope

Questions?