ATMES Spring Meeting April 26-27, 2012 Myrtle Beach, South Carolina International Projects.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
Construction Engineering 221
1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
Bob Smith, P.E. Region 1 Benjamin Acimovic, P.E., Region 1
CO-OPERATION IN CONSTRUCTION SECTOR CONSTRUCTION CONTRACTS Dr. Judit Gyulay – Dr. Zoltán András Vattai BUTE Department of Construction Technology & Management.
Lessons Learned: CM at Risk & Design Build
Vergabeformen Building Procurement – Contract strategy Procurement Systems – an initial overview Proper choice of delivery system can help to reduce conflicts.
Project Procurement & Contract Administration Jiwei Ma
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
TH 55 Mill and Overlay Design-Build Project S.P
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
4 th ANNUAL JOINT CSU/UC PSSOA CONFERENCE March 25-26, 2003 “Emerging Construction Methodologies in CSU – What Public Works Contract Specialists Should.
1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
SURETY BONDS Managing the Risk of Contractor Default.
Alternative Project Delivery
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
EPC & EPCM contracting.
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Software Development Contracts and Legal Issues Cost plus Fixed price Combined.
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
ESTIMATING By Laith Jacob.
Rethinking Construction Review of traditional construction models and a comparison of product development processes with other industries School of Architecture.
EM15 – Contractors COST MANAGEMENT
Prof Awad S. Hanna C HANGING P ROJECT D ELIVERY S YSTEMS by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison Department of Civil and Environmental.
Procurement Systems ARBE121 – PROCUREMENT OPTIONS “The organisational structure adopted by the client for the management of the design and construction.
1 Construction Estimating PART 1 "ACCURACY" - First and foremost, your ability to achieve success at a targeted,
FIDIC CONFERENCE 2005, BEIJING Workshop 13 Design & Build - Role of Consulting Engineers in the Tender Process Tse Yau Shing.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
CMR Contract Documents Jon Walden Manager of Contracts & Compliance Ohio School Facilities Commission Lisa Conomy Construction Counsel The Ohio State University.
Rural Intersection Conflict Warning System (RICWS) Design-Build Project.
Surety Bonds Managing the Risk of Contractor Default.
Design–Build Contracts G. Hardy Acree Director of Airports Sacramento County Airport System Advantages of of During Turbulent Times.
Construction Contracts and Project Delivery Methods
TYPES OF CONTRACTS.
1 Essa G. Al-Ansari 2nd PMI AGC Energy Forum DMS Debates DMS Debates Project owners should increasingly adopt the Cost Plus Model over LSTK.
1 CS 501 Spring 2003 CS 501: Software Engineering Lecture 7 Business Aspects of Software Engineering.
Presented by Keith J. Platte, P.E. Construction Contracting The Rollercoaster Construction Contracting The Rollercoaster R. W. Beck, Inc. IPED COAL POWER.
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
Project Procurement Management
FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING SPRING SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.
Project Delivery Methods CM CONSTRUCTION DOCUMENTS Kevin A. Delorey 11 Feb 2010.
1 Business Aspects of Software Engineering SWE 513.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
Measurement and Payment
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
Construction Management At Risk Process
CONSTRUCTING WEST MIDLANDS Question & Answer Session 22 nd March 2011 LOT 7 – CAPITAL WORKS.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
CHANGING PROJECT DELIVERY SYSTEMS
Nepal administrative staff college
What Small and Emerging Contractors Need to Know Introduction to Project Delivery Methods © Copyright 2017 NASBP.
PROJECT DELIVERY METHODS
An-Najah National University
Types of contract selection based upon following:
CHANGING PROJECT DELIVERY SYSTEMS
Nepal administrative staff college
Design-Build Process Utilizing Negotiated Selection
PROJECT DELIVERY METHODS
Definitions EPC EPCM Design/Build Contract Lump Sum
Construction Contracts
Design-Build Acquisition and Contract Incentives May 9, 2019
Delivering Successful Outcomes
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

ATMES Spring Meeting April 26-27, 2012 Myrtle Beach, South Carolina International Projects

Finding the Right Project Delivery Model

Company History | Singapore | Shanghai | Portland, OR | Greenville, SC | Acquisition of | exp. China | C3 Eco Hospitality Design

Project Delivery Conventional Contract (Design / Bid / Build) EPC / Design & Build Management Contract EPCM – Engineering, Procurement & Construction Management (Agency – Not at Risk) EPCM with Guaranteed Maximum Price (GMP) (At Risk) Project Delivery Options / Terminology

Project Delivery Safety Cost Certainty Quality Schedule / Program Delivery Balance of Risk Key Drivers for Choice Project Delivery

Project Delivery – Option 1 Option 1 – Conventional Contract - Design / Bid / Build Sub Contractors Suppliers Client Main Contractor Design Consultant (Full Design) Project Delivery Experience

Project Delivery – Option 1 - Experience Location Shanghai, China Role IP Protection Engineering Review Cost Estimation Procurement General Contractor Project Size Confidential

Project Delivery – Option 1 - Experience Location Xi’an, China Role Site Selection Engineering Management Procurement Construction Management Equipment Installation Project Size FA: 40,000 sqm R&D Test Center

Project Delivery – Option 1 - Experience Location Shanghai, China Role Design & Build Contractor Project Size 350sqm Innovation Center

Project Delivery – Option 1 - Experience Location Zhangjiagang, China Role Site Selection Engineering Procurement Construction Management Equipment Relocation & Installation Project Size 37,000 sqm

Project Delivery – Option 1 - Experience Location Changzhou, China Role Site Selection Engineering Procurement Construction Management Project Size 12,000 sqm

Project Delivery – Option 1 Option 1 – Conventional Contract - Design / Bid / Build Client directly employs consultants Client directly employs the main contractor Main contractor employs subcontractors and suppliers Main contractor has no design responsibility Main contractor has a start and finish date Main contractor provides a lump sum bid Design must be complete before the main contractor tenders

Project Delivery – Option 1 Option 1 – Conventional Contract - Design / Bid / Build Advantages – Fixed lump sum offer (but not cost certainty) – Cost overruns are borne by contractor – Client controls his design Disadvantages – Contractor prices full risk premium – Contractor will mark-up subcontractor/supplier prices – Client must clearly define scope – Changes are expensive for the client – Client at risk for disputes over claims and variations – Safety and quality may be compromised – Schedule is elongated due to tender process for main contractor – Client must provide a full team to manage the contract and main contractor

Project Delivery – Option 2 Option 2 – Design & Build / EPC - (Fixed Price Lump Sum) Sub Contractors Suppliers Client D&B/EPC Contractor Design Consultant (Concept Only) Project Delivery Experience Design Team

Project Delivery – Option 2 - Experience Location Shenyang, China Role Project Management Construction Management Engineering Coordination Procurement Support Project Size FA: 600,000 sqm SA: 2.2 Sak

Project Delivery – Option 2 - Experience Location Suzhou, China Role EHS Management QA/QC Jianli Project Size 10,500 sqm

Project Delivery – Option 2 - Experience Location Shanghai, China Role Project Management Project Size FA: 37,000 sqm X2 Semiconductor Assembly

Project Delivery – Option 2 Option 2 – Design & Build / EPC - (Fixed Price Lump Sum) Client directly employs consultants for concept Client directly employs the main D&B contractor D&B contractor employs design team, subcontractors and suppliers Main contractor has design responsibility Main contractor has a start and finish date Main contractor provides a lump sum bid Concept design must be complete before the main contractor tenders

Project Delivery – Option 2 Option 2 – Design & Build / EPC - (Fixed Price Lump Sum) Advantages – Fixed lump sum offer – One party (contractor) with overall cost and schedule Disadvantages – Contractor prices full risk premium – Contractor will mark-up subcontractor/supplier prices – Risk of scope gaps if Client is not able to clearly define scope – Client has no visibility on design – Changes are expensive for the Client – Client at risk for disputes over claims and variations – Safety and quality may be compromised – Client must provide a full team to manage the contract and main contractor

Project Delivery – Option 3 Option 3 – Management Contract Sub Contractor Suppliers Management Contractor Design Consultant Client Project Delivery Experience

Project Delivery – Option 3 - Experience Location Jining, China Role Engineering Review Procurement Construction Management Jianli Project Size 20,000 sqm

Project Delivery – Option 3 - Experience Location Yangzhou, China Role Engineering Review Procurement Support Construction Management Project Size 7,500 sqm

Project Delivery – Option 3 - Experience Location Shanghai, China Role IP Protection Engineering Review Cost Estimation Procurement General Contractor Project Size Confidential

Project Delivery – Option 3 Option 3 – Management Contract Client directly employs consultants Client directly employs the management contractor Management contractor employs subcontractors and suppliers Management contractor has no design responsibility Management contractor provides a detailed schedule Management contractor provides a fixed fee for Indirects (staff, general conditions / preliminaries) together with mark-up % on packages Design and construction can be overlapped to reduce the schedule

Project Delivery – Option 3 Option 3 – Management Contract Advantages – Client controls the design – Fixed fee on Contractors indirect (staff, GC’s, mark-up) Disadvantages – Contractor prices risk premium on subcontractors performance – No incentive for contractor to keep costs down as he is paid a mark-up on subcontract packages – Client is responsible for scope gaps – Client is responsible for design deficiencies – Client is responsible for variations / claims etc. – No cost certainty until all packages are bought out – Changes are expensive for the Client

Project Delivery – Option 4 Option 4 – EPCM (Agency) Client Sub Contractors Suppliers EPCM Contractor Project Delivery Experience

Project Delivery – Option 4 - Experience Location Wuhan, China Role Site Selection Engineering Procurement Construction Equipment Installation Contractor Project Size 4,500 sqm (Phase 1) 350,000 sqm (Phase 2)

Project Delivery – Option 4 - Experience Location Meizhou, China Role Engineering Construction Management Equipment Relocation Equipment Installation Contractor Project Size 17,000 sqm

Project Delivery – Option 4 Option 4 – EPCM (Agency) Client directly employs consultant for Concept / Basic Design Client directly employs the Engineering / Construction Manager Client employs subcontractors and suppliers EPCM contractor has design responsibility EPCM contractor prepares a detailed schedule Design and construction can be overlapped to reduce the program

Project Delivery – Option 4 Option 4 – EPCM (Agency) Advantages – Client is engaged in the design at concept and detailed phases – Maximum overlap between engineering design, procurement & construction – Ability to make scope changes without penalty – Client may supplement his team resources through EPCM contractor – Client can control fee budget on EPCM contractors personnel – GC’s are pass through cost to client – EPCM contractor is responsible for schedule – Procurement is open book – Cost of risk is borne by client (no premium by contractor) – Client can control “design to budget” (note 1) – Non-adversarial team approach Disadvantages – No cost certainty until all packages are bought out (but see note 1) – Client has risk on subcontractor performance – Client retains risk for disputes, variations and claims

Project Delivery – Option 5 Option 5 - EPCM (At Risk) - With Guaranteed Maximum Price EPCM Contractor Technical Consultant (Concept) Client Suppliers Sub Contractors Project Delivery Experience

Project Delivery – Option 5 - Experience Location Changshu, China Role Engineering Construction Management MEP Contractor Project Size 10,000 sqm

Project Delivery – Option 5 - Experience Location Chongqing, China Rayong, Thailand Role Construction Management EPCM Project Size 11,000 sqm 10,000 sqm

Project Delivery – Option 5 Option 5 - EPCM (At Risk) - With Guaranteed Maximum Price Client directly employs consultant for Concept / Basic Design Client directly employs the Engineering / Construction Manager Client employs subcontractors and suppliers EPCM contractor has design responsibility EPCM contractor prepares a detailed schedule EPCM contractor provides a fixed fee for staff, overheads and profit Design and construction can be overlapped to reduce the program Client agrees GMP with EPCM contractor at an agreed point during design / procurement phase EPCM contractor takes responsibility for cost overrun on agreed formula Client and contractor agree split on savings to agreed formula

Project Delivery – Option 5 Option 5 - EPCM (At Risk) - With Guaranteed Maximum Price Advantages – Client is engaged in the design at concept and detailed phase – Maximum overlap between engineering design, procurement & construction – GC’s are normally subject to mark-up or fixed lump sum – EPCM contractor is responsible for schedule Disadvantages – No cost certainty until GMP is agreed – Risk of not being able to agree GMP – Client must fully define scope prior to agreement of GMP – Contractor will build risk premium into GMP – Post GMP changes may be expensive – Client at risk for disputes over claims and variations post GMP

Project Delivery Options

Century 3 Inc. One Century Place, Greer, S.C USA Phone: 1 (864) I Fax: 1 (864)