Village of Nyack Memorial Park Gazebo Submitted by: Quennell Rothschild & Partners, LLP 03/16/15 Schematic Options.

Slides:



Advertisements
Similar presentations
Edit the text with your own short phrases. The animation is already done for you; just copy and paste the slide into your existing presentation. architectural.
Advertisements

Construction Method, Material Selection & Building Services
Client: Northwest Regional Airport Society Architect: Ulrick Laska Architectural Corporation Project: Expansion to airport terminal building including.
WBS-Construction of House (Example) WBS Dictionary
Readyville Mill Restoring the Readyville Mill. March 2006 Forgotten and Neglected for 40 years.
Module Reading Plans and Elevations
Shelters, Gazebos & Pergolas. Specializes in the manufacturing of shelters, gazebos, pergolas and other park structures Litchfield offers a complete line.
Headquarters 565 Electric Road, Salem, VA TEL (540) FAX (540) California Office 8665 Argent.
Innovative New Technologies in Building & Construction.
Caskets Cap Openings.
ASPHALT & CONCRETE FOR INDOOR FACILITIES Presented by Tom DeRosa.
Headquarters 565 Electric Road, Salem, VA TEL (540) FAX (540) California Office 8665 Argent.
City of Palm Beach Gardens ARTISTIC BUS SHELTERS ARTISTIC BUS SHELTERS ITB PW ITB PW.
EXTERIORS FOR WOOD LIGHT FRAME CONSTRUCTION
 First and possibly the more difficult of the two to deal with is the situations concerning existing illegal carports.  Secondly, we must address what.
The Dirt Lot Initiative This proposed project was part of last year’s Capital Project Improvement Plan There has been an obvious risk associated with its.
On-line Sorting Technology for CCA-Treated Wood. Funding Received from Sarasota County through the Florida Department of Environmental Protection Innovative.
Estimating Waste Week 3 CTC-415. What is waste Waste is material that needs to be supplied but may not be used All material items except steel beams and.
Scale Modelling in Architectural Design B. de Vries.
Capítulo 10 Instalaciones básicas programadas Instalaciones eléctricas interiores.
Interior Lifestyles Pvt. Ltd Welcome to our six step process for Interior designing of your commercial space. 6 6.
Rectangular framed structures
PHOTO. NO.DATE: 06/11/13 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P MAJOR MAINTENANCE FY 14.
IOWA STATE UNIVERSITY Department of Civil, Construction and Environmental Engineering Cost Estimate for Different Wind Turbine Technologies Bin Cai Wind.
Proposed Ballot Issues Bannockburn HOA Covenants.
Author name here for Edited books chapter 6 Facility Construction 6 chapter.
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
Meg Thornton/IMPC-FWA-PWE/(907) 11/04/2008 UNCLASSIFIED 1 OF 18 Army Cost Analysis for Stabilization and Demolition of.
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 10 Slide 1 Unit 10 Commercial Construction.
ROOFING MATERIALS, INSULATION, AND HOUSING SYSTEMS.
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
Syllabus Faculty of Applied Engineering and Urban Planning Civil Engineering Department Lecture - Week 1 2 nd Semester 2007/2008 UP Copyrights 2007 Introduction.
WRIGHT ENGINEERING BY: CHAMPION HEIGHTS COMMERCIAL BUILDING ERIC BEALS RYAN KRAUSE CAMERON MILLER RANDY RODRIGUEZ HORACIO MONTEJANO.
1 What is Precast Concrete? Precast concrete consists of a mixture of cement, water, aggregates and admixtures. This mixture is cast into a specific shape.
First Baptist Church of Doylestown Senior Thesis Structural Emphasis James Chester Preliminary Phase II Design.
Post- Consumer Shingle Recycling Rooftop Recycling Boxborough, MA.
Chapter 46 Commercial Construction Projects. 2 Links for Chapter 46 Types of Drawings Floor Plans Elevations Site Plans.
2014 construction bond planning Needs assessment- what are we missing Site visits- in and out of district Safety concerns Life cycle evaluations- where.
THIS IS WITH CARLIN BRIGHT Miscellaneous Orthographic Views Which Drawing Is It? Which Drawing Is It? II Past Units
TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4,
American Architecture Jorge López My Noteworthy Buildings.
CONSTRUCTION SYSTEMS. What Is Construction? Our Constructed World shelter travel.
June 5, 2007 BCC Public Hearing on BZA # VA , 4/5/07 Applicant/Appellant: Hazael Munoz.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
The proposed trailer will have the capability to be pulled by a GSA pick-up and LMTV. The new trailer will also be wired with the proper type of electrical.
CITY COUNCIL OCTOBER 18, 2011 Central Park Gazebo Replacement.
How Our Earth Sheltered Homes are Constructed Earthlog ® Equity Group, Inc. The American Dream … The Future is Now
206 THIRD STREET DR/TRP Appeal of. Planning Commission Hearing March 12, 2014, P/C approved a Design Review Permit: - Demolition of the existing.
A REPORT ON PRACTICAL TRAINING CONDUCTED AT PUBLIC WORK DEPARTMENT(PWD),KOTA FROM 15/6/2011 TO 14/7/2011 Submitted to: Mr. Rajneesh Sharma HOD {Civil Dep.}
Perfect Solar Contractor Companies in Orange County
Siding, Gutters, and Windows
Parks & Recreation 2016 Bond Referendum Project Information.
Framing Vocabulary Stud: upright beams in the framework of a building
An-Najah National University
How Completed Interiors Are Achieved: Designing & Building
Residential Wall Systems
SC Railing Company Overview
Kiosk Discussion May 23, 2017.
Design of a Commercial Shopping Center
Multistory Office Building
Capital Improvements Presentation
INDOOR BASEBALL / SOFTBALL FACILITY
Commercial Construction Projects
BUILDING INSPECTION Amy Link, Assistant Director of Development Services Ken “KC” Crow, Building Official Lisa Mann, Office Manager.
Minuteman Vocational Technical Regional High School Progress
1 Semester Project Design A Multi Story Office Building
Residential Wall Systems
House Construction Budget Plan
Chapter 8 Framing Systems.
Harp Place & Grindstone Pavilion Options
Presentation transcript:

Village of Nyack Memorial Park Gazebo Submitted by: Quennell Rothschild & Partners, LLP 03/16/15 Schematic Options

Nyack Memorial Park Gazebo Schematic Options 03/16/15 Submitted by: Quennell Rothschild & Partners, LLP Existing Gazebo

Existing Gazebo and concrete base Nyack Memorial Park Gazebo Schematic Options 03/16/15 Submitted by: Quennell Rothschild & Partners, LLP

Nyack Memorial Park Gazebo Schematic Options 03/16/15 Submitted by: Quennell Rothschild & Partners, LLP Existing Gazebo Wood Interior

Nyack Memorial Park Gazebo Schematic Options 03/16/15 Submitted by: Quennell Rothschild & Partners, LLP Existing Gazebo Dimensions

Nyack Memorial Park Gazebo Schematic Options 03/16/15 Submitted by: Quennell Rothschild & Partners, LLP Consensus Plan

Replace with new slide Nyack Memorial Park Gazebo Schematic Options 03/16/15 Submitted by: Quennell Rothschild & Partners, LLP Consensus Plan Gazebo Enlargement

Nyack Memorial Park Gazebo Schematic Options 03/16/15 Submitted by: Quennell Rothschild & Partners, LLP Proposed Gazebo OPTION A

Nyack Memorial Park Gazebo Schematic Options 03/16/15 Submitted by: Quennell Rothschild & Partners, LLP Proposed Gazebo OPTION B

Nyack Memorial Park Gazebo Schematic Options 03/16/15 Submitted by: Quennell Rothschild & Partners, LLP Gazebo Precedent: Simple octagon, single, shingle roof with finial

Nyack Memorial Park Gazebo Schematic Options 03/16/15 Submitted by: Quennell Rothschild & Partners, LLP Gazebo Precedent: Simple octagon, single, metal roof with finial

Nyack Memorial Park Gazebo Schematic Options 03/16/15 Submitted by: Quennell Rothschild & Partners, LLP Gazebo Precedent: (Carmel) Octagon, double shingle roof, clerestory, cupola, ornamentation

Nyack Memorial Park Gazebo Schematic Options 03/16/15 Submitted by: Quennell Rothschild & Partners, LLP Gazebo Precedent: Night view with clerestory

Nyack Memorial Park Gazebo Schematic Options 03/16/15 Submitted by: Quennell Rothschild & Partners, LLP Gazebo Precedent: (Mackinac) Elongated octagon, double roof, lower profile, ornamentation

Nyack Memorial Park Gazebo Schematic Options 03/16/15 Submitted by: Quennell Rothschild & Partners, LLP Order of Magnitude Cost Estimate Polygon 28' Octagonal Shelter$33,795* 1 clerestory/custom ornamentation Asphalt shingle roof tongue and groove interior Steel columns-round/extra post height electrical outlets standard stain and paint colors stamped engineering drawings for code delivery to site Installation $15, % of structure cost Total$91,745*** * Additional$1500 more for the elongated octagon ** Additional $5000 for the elongated octagon *** Excludes permitting fees, consultant fees, lighting Foundation$42,200** from Brooker Eng. Icon 28' Octagonal Shelter$32,408* 1 clerestory/standard ornamentation Cedar shingle roof tongue and groove interior Steel columns-square standard electrical outlets standard stain and paint colors stamped engineering drawings for code delivery to site * Additional fee for custom ornamentation, height and columns ** No elongated octagon, standard *** Excludes permitting fees, consultant fees, lighting Foundation$42,200** from Brooker Eng. Total$90,358*** Installation $15, % of structure cost

End