Joint Operations Prepared & Published Monthly by EH&S, F&S Group JO EHS Bulletin AUG 2010 No. of Recordable Injuries since 2003 Safety Stand Down Day Injury.

Slides:



Advertisements
Similar presentations
Cleveland Construction Safety Initiative Introductions Purpose of a 3SP Overview of Sections of a 3SP Pat McMillen – Gilbane Building Company Dave.
Advertisements

Gulf Petrochemical Industries Co. Turnaround Contractors – Ensuring the safety of our Manpower GPIC Bader Al-Mansoori Planning Superintendent.
L1 TRA Transition Training HITRA Transition and Communication Pack 4
Pre-stressed Concrete Initiative By Ken Logan. Pre-stressed Concrete Initiative Background Examination of standards within the industry Production of.
CONTRACTOR KILLED IN FALL FROM ROOF WORKING AT HEIGHT Work at height is work in any place at, above or below, ground level, where a person could be injured,
Job Loss Analysis Overview
Drill ICAM-preliminary information For information purposes only. Managers & Supervisors should evaluate this information to determine if it can be applied.
Safety and Health Management Program
© Business Review - Arabian Peninsula January 24, 2010 / Slide 1 ABB Contractors Business Partners John Hartnett May, 2010.
SIEP HSE Management System
1 The task: Salvaging Operation. Included cutting and removal of equipment from site WELDER FATALITY August 2003.
Contractor Safety Management
1. 2 Safety work-stoppage PDO & its contractors have suffered THREE high potential incidents involving cold cutting in the last TWO months.
Permit to Work Procedure Document Number: KOC.SA.004
M. Scharfenstein - ES&H Coordinator 8 June 2009
1 Well Engineering has suffered an alarming and increasing number of incidents of injuries resulting from the use of Hand Tools ! Using the wrong Hand.
UK’s CDM Regulations 2007 and its Applications in Singapore
Risk Assessment – An Essential Standard
Key changes from OHSAS 18001:1999
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 July 2010.
Joint Operations Prepared & Published Monthly by EH&S, F&S Group JO EHS Bulletin Dec 2010 Open & Closed Hazard Reports Accident & Lessons LearnedKOTC Management.
“Incident Free Starts With ME”
Barriers in Improving HSE Culture
Elkhorn Construction Inc..  A BJSA is a tool in which we plan our work, identify hazards, mitigate the hazards, and assign the responsible people. 
Job Safety Analysis (JSA)
Risk Management and PINs Why risk management is so important Why HSRs should be “qualified” to issue PINs 1 Training & Safety Consultants.
BG Group Communication Pack Learning the lessons ELNG Construction Site Train 2, Idku Egypt - Fatal Incident on 21st March 2005.
Elements of Effective Behavior Based Safety Programs
Grader and Pick up Incident June 30 th, Incident Overview 2  On September 20 th,2011 at approximately 2:30am Dan had just finished filling 3 of.
Safety Stand Down – Together We Will Make the Difference.
Main contractor name – LTI# - Date of incident Workplace Safety Engagement Pack Volume 2014 Edition 1 Working at Heights.
A guide to... Safe Systems of Work.
Program Implementation MM.DD.YY. To comply with the OHSA and regulations To demonstrate management's commitment to health and safety To show employees.
Safety Observations & SIP Safety Observations & SIP.
Oil & Gas Industry Workgroup focused 100% on dropped object prevention
GUPCO Kamose Fatality Incident Toolbox Talk Lessons pack Presenter’s Name Title Department Prepared By Dave Goodwill for Dave Blevins.
Hosted by: Your CCC HSE Group General Falls Confined space JSTI
Safe Systems of Work. Legislation w HSWA Section 2 (2) (a): Provide and maintain plant and systems of work that are, so far as is reasonably practicable,
ASPEC January 2015 Incidents –0 incidents, 0 near misses Hours 27/12/14-30/01/15 13% Site, 1% Travel, 86% Office ASPEC QSHR January 2015 Minutes.
Permit to Work System TDI-Brooks International December 2014.
HSE Officer Nov Who is the HSE Officer? SOP-GEN-2014C The First Mate is the designated HSE Officer on TDI-Brooks vessels.
JOB SAFETY ANALYSIS Presentation. ANY New Job/ Activity Recognize the Hazards Plan the work Protect the people Before starting ANY new job/ activity,
TDI-Brooks International Nov 2015
Global OE Focus Week 6 – 10 February 2011 “Incident Free Starts With Me”
BSP/Contractor fatality Incident Investigation Slide: 1 Time Out For Safety BSP/BLNG 25 th August 2004 BSRC Ball room.
W LTI Final report Shipyard Mokpo Korea / 2013 Steel Plate Dropped Incident Investigation.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
CNOOC SES Ltd. VQHSE MS Vendor QHSE Management System
Cessco Fabrication & Engineering Ltd.
Indiana University of Pennsylvania Safety Sciences Department
Injury: Fall from height
PTW – Permit To Work. What is PTW? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific time.
High Potential Near Miss
What is Safety Stand Down?
SHE Monthly Communication Deck
INCIDENT: A 50 T crane was lifting pressure equipment skid (2.5 ton) from the wash bay area to wellhead equipment area. The crane was positioned in between.
PetroSpect Inspection Services, Ltd. Best Practice
Safety is part of our culture at Halliburton
What is Safety Stand Down?
Working from Height over 3m Approved Contractor
MONTHLY DRILL OF AL YAMAMA ENGINEERING COMPANY
IPLOCA SAFETY WORKSHOP GENEVA, SWITZERLAND July 1st 2015
M. Scharfenstein - ES&H Coordinator 14 May 2009
Ensure safety devices are working prior to starting work
Observers of the Month July 2013 Restricted.
Effective communication prevents incidents
CLICK TO SHOW ANIMATION
Welcome back to 2016 Memory Jogger – Mobil Retail M&R Activities
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Permit to Work Process​ HSE GROUP RULE (CR-GR-HSE-402)
Presentation transcript:

Joint Operations Prepared & Published Monthly by EH&S, F&S Group JO EHS Bulletin AUG 2010 No. of Recordable Injuries since 2003 Safety Stand Down Day Injury Incident & Lessons LearnedStatus of Hazard Reports – 2010 (YTD) 2009 Recognizing Best Practices KPI President’s Visit One foreman and two workers were replacing a 3” valve on the separator in Sub centre 16. They were wearing Self Contained Breathing Apparatus (SCBA). Shortly after starting the work the foreman went out of the scaffold platform on to the separator top and fell down (approx.7 meters) to the ground. He suffered fractures on his spine and neck. Select only trained and competent people to perform work requiring specialized breathing apparatus An airline/cascade breathing system must be used for work when it is known H2S is present. Use SCBA for emergency/rescue situations only. Do not allow anyone except yourself to adjust air valves on the breathing apparatus Inspect the work site to observe and verify permit conditions before approving and signing the work permit When the scope of work changes hold a meeting with involved parties to prepare and agree on a plan that addresses job hazards and steps to mitigate risk Do not attempt to repair or remove valves under pressure Activate Stop Work Authority until a job is adequately planned and clearly communicated, pre-job risk assessment understood, workers sufficiently trained, and vessel depressurized. Take time to develop a comprehensive JSA that has been reviewed and understood by all parties involved Lessons Learned IP last position Before falling Work Platfor m IP Fell here IP Position On the ground JO held safety stand-down day on 2 nd June, All JO and contractors employees participated in a number of meetings and discussed detail about performing Job Safety Analysis, how to use JSA and its importance. Meetings were held in English, Arabic and Hindi languages. Contractors actively participated in the safety stand- down day by displaying banners, distributing fliers etc. These numbers include all job related injuries and fatalities, excluding first aid injuries IMCO conducted a Behavior Based Safety (BBS) Campaign by reporting and recognizing the best practices among their workforce. As part of this campaign best practices of workers were identified and reviewed by JO – PGP representatives and BBS Adviser. Some of the employees were selected for recognition based on the review of best practices. Awards were distributed in presence of JO representatives on 19 th July, Mr. Hussain E. Ismail, President of Kuwait Petroleum International Ltd., visited Joint Operations. He was accompanied by Mr. Khalid Al- Quraini, Head of HSE – KGOC. He toured LSP plant where LSP Operations Specialist Mr. Keith Ronk and Sr. Safety Engineer Mr. Mohammed Abbas explained the process and JO EHS and OE programs and procedures. What Went Wrong The foreman attended SCBA training 2 years before using it for this job. He sought the help of co-worker, who was not formally trained in use of SCBA, to open the air supply valve on his SCBA. A wrong valve was opened which did not allow air flow to face piece. The vessel (Separator) contained crude oil and was not fully depressurized. Gas/H2S was released while workers removed the valve. Communication between asset owner and job executing group was not clear; job planning, preparation and risk assessment was inadequate. JSA was not detailed enough and not discussed with workers performing the job. Work permit was issued without site inspection and checking the vessel’s condition