Regional Transportation Commission, Washoe County Lee Gibson, Executive Director Roger Hanson, Senior Planner.

Slides:



Advertisements
Similar presentations
Division Avenue Bus Rapid Transit Project August 2012.
Advertisements

Mid Ohio Development Exchange (MODE) Presentation January 16, 2014.
TBITE 05/15/ Heather Sobush, Senior Planner Christopher Cochran, Senior Planner
HART Transit Development Plan June 20, Overview TDP Purpose Plan Elements – Vision Plan – Status Quo Plan – Action Program Next Steps.
SR 50/UCF Connector Alternatives Analysis Orange County Board of County Commissioners January 13, 2015.
What is Coordinated Services? Common Goals Increase ridership Minimize expenses Maximize Revenues Build Partnerships Share Resources Reduce duplication.
Community Transit Solutions for the Suburbs APTA Annual Meeting September 30, 2013.
Dr Lina Shbeeb Minister of Transport. Jordan
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
Goal: 10,000 interactions in 2015 –Extensive civic engagement Goal: To develop a great regional transit system –Update every five years –All options considered.
Short Range Transit Improvement Plan CITY OF HIGHPOINT Sounding Board Meeting Service Recommendations September 9, 2014.
Public Transit in Sacramento
Rapid Transit Investment Plan David Armijo, CEO March 19, 2010.
Trends in Urban Transit in the U.S. – Some Comparisons Edd Hauser, P.E., PhD Nicholas J. Swartz, MPA Center for Transportation Policy Studies UNC Charlotte.
Transportation & Aging Senior and Disabled Riders Transportation Summit December 6, 2013.
TRB Transportation Planning Applications Conference Houston, Texas May 2009 Ann Arbor Transportation Plan Update-- Connecting the Land Use & Transportation.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Greater Mankato Transit Redesign Study Study Overview and Initial Existing Conditions September 2011 In association with: LSA Design and Public Solutions.
A M O T I A A N N U A L M E E T I N G 2 3 S E P T E M B E R N A S H V I L L E, T N 1 A View from the State DOTs Joung H. Lee Associate Director.
Mark Phillips BSDA/Metro Long-Range Planner. The Foundation: Moving Transit Forward.
Overland Park Public Works Committee – Transit Update June 24, 2015.
Green Transport Dr Lina Shbeeb Minister of Transport. Jordan.
Transportation Program Status Orange County Transportation OCBC Infrastructure Committee Meeting April 14, 2009 Kia Mortazavi, OCTA, Executive Director,
TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? the Best Option? 1:30 – 2:40 p.m. Paul Larrousse Director, National Transit Institute.
Presentation to ***(group) on ***(date) 1.  Cities - 11  Highway districts – 3  Ada and Canyon Counties  School districts – 2  Valley Regional Transit.
May 9, 2011 RLS & Associates, Inc. Kent County Transit Needs Assessment Draft Findings and Recommendations.
Metro Cities Transportation Policy Committee August 10, 2015 Overview of Minnesota Highway and Transit Finance.
EFFECTS OF RISING GAS PRICES ON BUS RIDERSHIP FOR SMALL URBAN AND RURAL TRANSIT SYSTEMS Jeremy Mattson 18 th National Conference on Rural Public and Intercity.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 16, 2009.
Valley Transit Fixed Route and ADA Paratransit Transportation.
Innovations in Transit Planning and Financing Presentation to the 2003 MPO Conference, Muncie IN October 16, 2003.
NEW STRATEGY FOR TRANSPORT GOVERNANCE IN MONTREAL March EMTA Meeting, Madrid.
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
West Phoenix / Central Glendale Transit Corridor Study Public Meetings May 2013.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 15, 2009.
Morgan County Transit Discussion UTA Corporate Staff Presentation November 19, 2013.
Metro’s Capital Improvement Needs Presented to the National Capital Region Transportation Planning Board By Tom Harrington, Director of Long Range Planning.
Challenges and Choices San Francisco Bay Area Long Range Plan Therese W. McMillan Deputy Executive Director, Policy Metropolitan Transportation Commission.
UC San Diego Transit and Shuttle Funding Issues Fall Quarter 2009.
TRB/APTA 2004 Bus Rapid Transit Conference Implementing a BRT Project: The Preliminary Steps 8:30 – 9:50 a.m. Frank SpielbergBMI-SG Incoming Chair, TRB.
1 Mountain Metropolitan Transit Sustainability Committee March 20, 2009 Presented By: Sherre Ritenour & Tim McKinney.
Steve Heminger Executive Director, MTC AMPO Annual Conference Washington, D.C. – October 23, 2003 Playing in Traffic: A New Look at Management and Operations.
Transportation Planning: A Field in Flux Steve Heminger, Executive Director Metropolitan Transportation Commission April 2004.
Downtown Shuttle (D-Link) Interlocal Agreement Transportation and Trinity River Project Committee October 26, 2015.
Regional Transportation Council Mobility Plan Workshop North Central Texas Council of Governments November 12, 2015.
Gastonia Transit Expansion Study City Council/Planning Commission Joint Transportation Workshop September 13, 2007.
Small Budget Campaigns CFTE Conference Austin TX June 12, 2007.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
Valley Metro Update Open House and Public Hearing March 9, 2007.
Transportation Fee FY2016 January 16, Services Provided by Transportation Stinger Buses - Three routes with 10 buses operating weekdays and two.
The Reno Streetcar March 8, 2016 RTC 2040 Regional Transportation Plan Economic Development Forum.
Indianapolis Public Public Hearing – Proposed 2014 Budget Thursday, August 15, 2013 Transportation Corporation.
Regional Transportation Plan Draft Hybrid Scenario Transportation Policy Committee 7/22/03.
DESTINATION 2030 Regional Local Personal Adopted May 24, 2001.
The Gauteng Economic Indaba Transport and Logistics Mr Piet Sebola Group Executive Strategic Asset Development Date: 09 th June 2016.
Multi Agency Exchange May 16, 2017.
A Presentation to: River to Sea TPO Board October 26, 2016.
APTA Sustainability and Public Transportation Workshop Benjamin Smith
A Presentation to: River to Sea TPO BPAC November 9, 2016.
River to Sea TPO - CAC/TCC
Bus Rapid Transit (BRT) ACEC Presentation May 25, 2017
Votran Transit Development Plan (TDP)
Annual Operating & Capital Budget
Status Report on Rochester’s DMC Transportation Plan
Technology In Action Session: An On-Demand Sunday Transit Application
April 23, 2018.
VIRGINIA RAILWAY EXPRESS
Annual Operating & Capital Budget
RTC RIDE Service Improvement Recommendations
FY2020 Tentative HART Budget – Revenue Overview
Presentation transcript:

Regional Transportation Commission, Washoe County Lee Gibson, Executive Director Roger Hanson, Senior Planner

Presentation Outline  Transit System Facts  Economic Challenges in the Truckee Meadows  RTC Transit Funding Trends  Why BRT and Why Virginia Street  RAPID Operating Concept  RAPID Results  Going Forward

Transit System Facts  Annual Ridership Fixed Route = 5.2 million  Annual Ridership Paratransit= 600,000  Revenue Vehicle Hours Fixed Route = 252,000  Revenue Vehicle Hours Paratransit = 77,000  Fixed Route Operating Budget FY 12 = $25 million  Paratransit Operating Budget FY 12 = $ 7 million  Fleet  70 Fixed Route  8 BRT Articulated Hybrids  68 Forty-foot length

Transit System Facts: RIDE  7.7 million rides in FY 2011  30.5 passengers per service hour  100% wheelchair ADA accessible Getting People to Work: 46% of transit trips are to or from work

RTC INTERCITY  Connects Reno and Carson City  Weekday Commuter Service  Links with Carson & Tahoe transit service  35,000 passengers in FY 2011

RTC SIERRA SPIRIT  Free circulator service between UNR and downtown Reno  15 minute headways  261,000 passengers in FY 2011

RTC ACCESS Required by federal law to provide “complimentary” ADA door-to-door, demand-response service within ¾ mile of all fixed routes. Service provided 24/7 Service split into ADA and non-ADA zones Two fares: – ADA Service Area = $3.00 – Non-ADA = $6.00 Non ADA Zone ADA Zone No Service

Transit System Facts

Economic Challenges in Northern Nevada  Nevada Economy  Unemployment  Foreclosures  Public Finances  Sales Tax – FY 2006 high of $26.5 million to $19.4 million in FY 2011; 27% difference  Political Changes  Public employment  Transparency/responsiveness/accountability  Consolidation

Economic Challenges in Northern Nevada Unemployment Rates Building Permits

RTC Transit Funding Trends

Great Recession

RTC Transit Funding Trends 1.3 service hours per capita in 1993 (highest achieved at 265,000 RVH) Since 1993-Population: +48.5% RVH: -7.2% At 1993 ratio, 394,000 RVH but operating 251,000 RVH Transit funding in the Reno economy is not sustainable

RTC Transit Funding Trends

RTC Motor Vehicle Fuel Tax Revenue RTC 5 Fuel Tax Indexing went into effect in April 2010

Why BRT and Why Virginia Street  Operational challenges Long queue to board the bus Route 1 Bus in Mixed-Flow Traffic Crowded Bus Heavy Peak Traffic on Virginia Street

Supportive Land Uses UNR Regional Center Plan Downtown Reno Regional Center Plan South Virginia Street TOD Convention Center/Meadowood Regional Center Plan Reno City Limits Virginia Street City of Reno Master Plan Elements Transit Oriented Developments / Regional Centers

Core Ridership Trends

Loss of Sales Tax Revenues Shift revenue to non-sales tax sources

RAPID Operating Concept Develop express and short haul feeder service –Operate a higher level of service –10-minute headways between 5:30 AM and 8:00 PM. –New 30-minute local service, CONNECT –Feed RAPID express –Provide 24-hour service Save $5.0M annually in local sales tax funds to offset remaining service cuts

RAPID Operating Concept Capital Costs: $11,640,000 –8 New Flyer Buses – $7,400,000 –14 Stations – $4,200,000 –RIDE rebranding – $40,000 Open 4 th Street Station –Downtown Reno transit center Complete construction of 14 RAPID Stations Implement Transit Signal Priority & Queue Jump/Queue Bypass

RAPID Operating Concept Operating cost: $4,787,000 – RTC RAPID – $3,307,000 (34,244 service hours) – RAPID LOCAL – $1,480,000 (15,330 service hours) Service began October 11 th 2009

RAPID Performance

Rapid Performance

Funding: Public Transportation Expenses

RAPID Performance: Public Transportation Revenues

Assessment  Operational challenges overcome  Productivity and ridership increased  Stations reinforce supportive land uses and compliment TOD efforts of the City of Reno  Cost cutting measures have helped but revenue is still going down  CMAQ funding helped bridge the deepest part of the Great Recession; yet  Funding challenges still exist

Going Forward: RTP Update Develop community-based vision to address changing needs  Economic development and diversification  Safe and healthy communities  Sustainability  Increased travel choices

Expand RAPID to UNR, Legends & Sierra Summit/Redfield Going Forward: RAPID Extensions

Going Forward: 4 th Street/Prater Way RAPID type service between 4 th STREET STATION & CENTENNIAL PLAZA Next Phase of RAPID Expansion

Going Forward: New Technology Proterra vehicles present the first opportunity for Reno to deploy an advanced technology vehicle. With a 24 mpg equivalent, the vehicles may hold an opportunity to substantially reduce RTC’s fuel bill Proterra floor height is close to BRT station platform height