Implementation of Pinyon-Juniper Woodland Treatment Elements of the BLM’s Ely RMP/EIS: Opportunities for Public-Private Partnerships to Secure Environmental.

Slides:



Advertisements
Similar presentations
FARM BILL UPDATE. LAST FARM BILL: A LOT ACCOMPLISHED ON WORKING LANDS.
Advertisements

Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
Roles for Commodity Production in Sustaining Forests & Rangelands J. Keith Gilless Professor of Forest Economics UC Berkeley.
2011 ADC WINTER FORUM | PAGE 1 Developing Renewable Energy Projects on DoD Land Mr. Alan D. King Assistant Secretary of the Army for Installations, Energy.
Bureau of Land Management Regulations Washington State Association of Counties Cooperating Agency & Coordination Training November 22, 2013 – Vancouver,
LOCAL REGULATION AND CLIMATE CHANGE QUICK TELECONFERENCE American Bar Association Section of Environment, Energy, and Resources Climate Change, Sustainable.
Beyond Federal Standards Nevada Mercury Air Emission Control Program Leo M. Drozdoff, P.E. Administrator Nevada Division of Environmental Protection December.
Western States Energy & Environment Symposium October 27, 2009.
Engineering Technology Division
The Potential for Increased Cooperation on Offshore Wind among the Northeast States Warren Leon, Executive Director.
Genesis Solar Module Brochure ™
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Financing Urban Public Infrastructure
WETLANDS and LOCAL PROGRAMS Environmental Services Oregon Department of Transportation.
ACC Open Meeting – November 18, 2010 Four Corners Power Plant 1.
1 Cooperating Agency and Coordination Training Washington State Association of Counties Friday, November 22, 2013 Victoria Barr, Oregon/Washington State.
Regulatory Flexibility Committee Competitive Procurement September 18 th Joe Kerecman Director Government and Regulatory Affairs
Quyumta Community Sustainability Report Meeting Nelson Island.
Tourism Planning Lecture 3.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
Oregon Renewable Energy Action Plan April 2005 with Geothermal Energy highlights by Carel DeWinkel Senior Policy Analyst.
UPPER MONUMENT CREEK LANDSCAPE RESTORATION Allan Hahn – District Ranger Mike Picard – ID Team Leader.
Utilities Committee Review Illinois Board of Higher Education June 5, 2007 The Energy Resources Center College of Engineering University of Illinois at.
Water Supply Planning Initiative State Water Commission November 22, 2004.
State Permitting Issues for Wind Developments Southeast and Mid-Atlantic Regional Wind Summit 19 September 2005 Jennifer A. DeCesaro Energy Policy Specialist.
Port Everglades Master / Vision Plan Status Broward County Board of County Commissioners May 4 th, 2010.
LONG TERM ELECTRICAL SUPPLY PLAN STAFF RESPONSE TO QUESTIONS, ISSUES, AND RECOMMENDATIONS MADE IN NOVEMBER 2004 Presentation to the Gainesville City Commission.
Sacramento Local Agency Formation Commission (LAFCo) Final Environmental Impact Report Amendment of SMUD’s Sphere of Influence and SMUD Yolo Annexation.
Engaging Communities in Developing a Sustainable Wood Products and Biomass Energy Industry By Gerry Gray Vice President for Policy American Forests.
KEC MGA Committee, 2/21/2008 Midwestern Governor’s Association (MGA) Energy Security and Climate Stewardship Platform and Midwestern GHG Accord.
Everglades Land Acquisition Project Carol Ann Wehle SFWMD Executive Director.
Integrating Other Laws into BLM Planning. Objectives Integrate legal requirements into the planning process. Discuss laws with review and consultation.
Public-Public Partnerships February 27, ADC WINTER FORUM | PAGE 2 Public – Public Partnerships Boot camp for Defense Communities Craig Zgabay.
Senate Select Committee on Climate Change and AB 32 Implementation December 3, 2013.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Forestry in the 2008 Farm Bill and Associated Federal Acts Craig McKinley NREM, OSU-Stillwater.
1.What is the standard relicensing process in the U.S. and what is the ALP (Alternative Licensing Process) ? 2.How did we convince FERC to agree to an.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
Locally Administered Federal-Aid Project Initiation Workshop Prospectus Part 3 and NEPA Requirements Presenter: Howard Postovit; ODOT Region 5 Region Environmental.
BUILDING STRONG SM Northwestern Division Presented by Lori Rux Chief, Program Support Division June 11, 2009 BPA Direct Funding for Corps Hydropower Projects.
CALIFORNIA ENERGY COMMISSION California Bioenergy Action Plan Southern California Emerging Waste Technologies Forum Los Angeles, California July 27, 2006.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Shasta County Board of Supervisors March 4, 2008.
1 Sunrise Powerlink Project Update Orange County Business Council March 10, 2009.
Cooperating Agency Status Presented by Horst Greczmiel Associate Director, NEPA Oversight Council on Environmental Quality Washington, DC September 14,
Outdoor Heritage Fund. Established on August 1, 2013 by the Legislature. Continuing Appropriation of $20,000,000 annually from oil and gas taxes. Outdoor.
Bob Cupit Manager, Energy Facility Permitting Minnesota Public Utilities Commission.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
Non-Federal Development at Reclamation Facilities.
BUILDING STRONG ® PLANNING SMART ® US Army Corps of Engineers BUILDING STRONG ® Partnering Opportunities for Water Supply and Distribution Planning Beverley.
United States Department of Interior Bureau of Land Management Winnemucca District Draft Resource Management Plan and Draft Environmental Impact Statement.
1 Water Cooperative of Central Florida Utilities Department Orange County Board of County Commissioners July 26, 2011.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Update to Proposition 1E – Early Implementation Project (EIP) Application and Local Share Reclamation Board Sub-Committee Meeting September 11, 2007.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
AB 32 Update December 6, Outline Cap and Trade Program 2013 Update to Scoping Plan Looking ahead to
Neighborhood Planning Process Lacoochee/Trilby Neighborhoods.
Public Participation in Sustainability Planning and Socio-Economic Impact Assessment in Canada.
Town of Bethlehem DG Bethlehem Solar, LLC Zoning Board of Appeals Wednesday, October 1, 2014 David Albrecht, P.E., PV Engineers, D.P.C. Virginia Cook,
The Regional Conservation Partnership Program (RCPP) promotes coordination between NRCS and its partners to deliver conservation assistance to producers.
Lecturer: Lina Vladimirovna Zhornyak, Associate Professor.
Community Choice Aggregation Demonstration Project Marin County Base Case Feasibility Analyses Overview April 5, 2005.
USING STEWARDSHIP AUTHORITY TO ADVANCE RESTORATION Mae Lee Hafer Regional Stewardship Coordinator Collaborative Restoration.
1 Guidance on Renewable Energy in Federal Facilities under EO and EPACT 05 June 5, 2007 Anne Sprunt Crawley Federal Energy Management Program Energy.
Municipal Class Environmental Assessment
Water Reclamation Plant Feasibility Study Update May 28, 2014
Santa Ana River Conservation and Conjunctive Use Program Update
Final Environmental Impact Report
Chicago to Council Bluffs-Omaha
SWAC – Agenda 10/23/18 Chapter 6 – Alternative Technology – Draft Findings 2. Chapter 7 – Draft Landfill Disposal Existing Disposal System Disposal Options.
Presentation transcript:

Implementation of Pinyon-Juniper Woodland Treatment Elements of the BLM’s Ely RMP/EIS: Opportunities for Public-Private Partnerships to Secure Environmental and Economic Benefits in Lincoln County, Nevada Mike L. Baughman, Ph.D., CEcD Contract Executive Director Lincoln County Regional Development Authority December 8, 2010

BLM’s Ely RMP/EIS: A Roadmap for Environmental Stewardship and Multiple-Use for Public Land in Lincoln County, Nevada Final in November 2007, the Ely RMP/EIS resulted from nearly five years of planning and analysis Extensive public involvement – Scoping meetings throughout Nevada – 650 comment letters on the Draft Ely RMP/EIS Three federal agencies, four state agencies, four tribal governments and three local governments formally participated as cooperating agencies in preparation of the Ely RMP/EIS Science-based analyses 20-year plan Implementation-ready Tiering to EIS for individual treatment project EAs

Pinyon-Juniper Woodland Treatment Elements of the Ely RMP/EIS Pinyon-Juniper woodland acreage Ely District-wide – Mature woodlands 324,000 acres – Over-mature woodlands 2.9 million acres – Other woodlands 370,000 acres 2.7 million acres of Pinyon-Juniper in need of treatment Pinyon-Juniper treatment benefits – Increased mosaic of multiple-aged shrubs, forbs, and perennial grasses – Maintenance of soil stability – Cycling of energy, nutrients and water – Reduced risk of catastrophic wild fire – Enhanced wildlife habitat including for sage grouse

Impediments to Implementation of BLM Ely RMP/EIS Pinyon- Juniper Woodland Elements Funding – Program management/resource specialist staffing (planning; monitoring) – Professional contracts (NEPA, Section 106, ESA compliance) – Woodland treatment Disposal of biomass

Public/Private Partnership Opportunities to Address Impediments to Implementation of Pinyon-Juniper Elements of BLM’s Ely RMP/EIS Stewardship End Result Contracting – BLM/private parties – BLM/public entities – To perform PJ woodland treatment services to achieve environmental benefits – Encourage community involvement – Provide local economic/fiscal benefits Industrial Utilization of Treatment Related Biomass – Energy generation thermal electrical – building materials – bedding materials/mulch – Other Avoided costs to BLM for treatment of PJ woodlands

Lincoln County, Nevada Pinyon-Juniper Biomass Electrical Energy Generation Feasibility Study Board of Lincoln County Commissioners desire full implementation of BLM Ely RMP/EIS pinyon-juniper woodland treatment elements to achieve related environmental and wild fire risk reduction benefits A-Power Energy Generation Systems, Ltd. desires to develop a 10 MW pinyon-juniper biomass fired electrical generation project Lincoln County Power District No. 1 has identified two existing substations at which up to 10 MW of new generation can be added to existing transmission in the vicinity of Pioche (northern Lincoln County) September 2010 Board of Lincoln County Commissioners and A-Power Energy Generation Systems, Ltd. enter into Memorandum of Agreement to jointly fund pinyon-juniper biomass electrical energy generation feasibility study

Board of Lincoln County Commissioners/A-Power Energy Generation Systems, Ltd. Memorandum of Agreement County and A-Power each contribute $47,500 to fund feasibility study Scope of Work and Request for Proposal developed and issued The Beck Group (Portland, Oregon) retained to complete study Draft study due by mid-December 2010 Final study due by late-December 2010 Lincoln County to work with BLM to develop Stewardship Contract A-Power Energy Generation Systems, Ltd. to have first right of refusal to pinyon-juniper biomass covered by possible BLM /Lincoln County Stewardship Contract Decision by A-Power whether to proceed with project anticipated by mid- 2011

Lincoln County, Nevada Pinyon-Juniper Biomass Fired Electrical Generation Project Feasibility Study Outline Feasibility Study Outline – Biomass Fuel Supply Assessment (Chapter 5) – Assessment of Potential Plants Sites (Chapter 6) – Review of Alternative Markets and Products (Chapter 7) – Identification of Thermal Energy Uses in Lincoln County (Chapter 8) – Review of Power Transmission Infrastructure (Chapter 9) – Market Analysis of Power Sales (Chapter 10) – Evaluation of Optimal Facility Scale (Chapter 11) – Environmental Permitting & Regulatory Requirements (Chapter 12) – Evaluation of Energy Production Technology (Chapter 13) – Incentive Programs (Chapter 14) – Selection of Preferred Site for Biomass Power Generation Facility (Chapter 15) – Financial Analysis of Biomass Power Generation Facility at the Preferred Site (Chapter 16 )

Lincoln County, Nevada Pinyon-Juniper Biomass Fired Electrical Generation Project Feasibility Study Preliminary Results 10 MW biomass electrical generation project will require 66,000 bone dry tons (BDT) of fuel (woodchips) per year 30 year supply of biomass resulting from anticipated BLM treatment of PJ woodlands within 30 miles of alternative power plant sites Mechanized treatment of PJ woodlands may cost between approximately $45 and $80 per BDT depending upon stand density (lower cost for higher density stands) Transportation of biomass may cost between approximately $12 and $62 per BDT depending upon distance from treatment area to power plant site Biomass fuel resulting from BLM PJ woodland treatment within 30 miles of alternative power plant sites may cost approximately $60 per BDT

Factors Affecting the Feasibility of a Lincoln County, Nevada Pinyon-Juniper Biomass Electrical Generation Plant Price of electricity obtained through Power Purchase Agreement Rate of interest on construction and long term financing Amount of equity required to secure project financing Availability of sizeable customer for thermal energy by-product Facility scale Cost of treatment of PJ woodlands Cost of transportation of PJ biomass Extent of contribution by BLM to cost of planning, permitting and implementing PJ woodland treatment Availability of year Stewardship Contract

For Additional Information Contact: Mike Baughman, Ph.D., CEcD Contract Executive Director Lincoln County Regional Development Authority (775)