Reno, NV December 18, 2013 1.  Agenda 1. Regulatory Filings Update 2. Integrated Resource Plan Update 3. SB 123- NVision 4. Stakeholder Input 2.

Slides:



Advertisements
Similar presentations
FPLs Request for Recovery of the Costs Associated with the Seabrook Transmission Substations Pool Transmission Facilities NEPOOL Participants Committee.
Advertisements

Sierra Subregional Planning Group 10-year Transmission Plan
The Midwest ISO from a Transmission Owner Perspective.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Public Service Company of New Mexico
1 Licensing in the Energy Sector Georgian National Energy And Water Supply Regulation Commission Nugzar Beridze June 27 – July 3, 2008.
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
9/22/00 1 Jerry W. Smith. 9/22/00 2 Jerry W. Smith.
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
1 1 Substation Asset Strategy Kevin Dasso, Senior Director Engineering and Operations IEEE/PES Annual Substations Committee Meeting April 7, 2008.
WECC PCC Meeting Salt Lake City, UT March 26, 2014.
Reno, NV June 26,  Agenda 1. Regulatory Filings Update 2. Integrated Resource Plan Update ◦ SB 123- NVision 3. Generator Interconnection Updates.
Sue Sheridan President and Chief Counsel Coalition for Fair Transmission Policy EEI Transmission and Distribution Conference April 2012 TRANSMISSION PLANNING.
1 American Electric Power Company Transmission Formula Rate AEP Appalachian Transmission Co., Inc. AEP Indiana Michigan Transmission Co., Inc. AEP Kentucky.
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
® Investor Meetings June 7-8, 2010 PG&E Corporation.
1 Voltage Stability and Reactive Power Planning Entergy Transmission Planning Summit New Orleans, LA July 8, 2004 Entergy Transmission Planning Summit.
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
111 TAG Meeting June 8, 2015 Teleconference / Webinar FINAL.
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
ISO Exhibit 13 Federal Energy Regulatory Commission Technical Conference on Connecticut Infrastructure Reliability and Operability Committee Update Hartford,
The Value of Electric Transmission NASUCA Mid-Year Meeting June 25, 2012.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
Regulatory Update Dennis Derricks May 5, 2010 Regulatory Update Dennis Derricks May 5, 2010.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
Arizona ACC Biennial Transmission Assessment Navajo Transmission Project Update May 22, 2008 Presentation by Ben Hoisington Project Administrator, DPA.
Lyndonville Electric Department Feasibility Analysis Review December 2,
Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.
Joint Outreach Team Implementation Plan July 12, :30-11:30 a.m.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
Proposed North – South Congestion Mitigation Plan Luminant Energy July 2008.
EPA’s Proposed Clean Power Plan House Committee on Natural Resources and Environment February 12, 2015 Tegan B. Treadaway Assistant Secretary Office of.
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
Updated 1/28/2011.
Queries raised by Director (Tariff) on ARR and Tariff Application of OPTCL for FY on
Standards Review Subcommittee Update August 17, 2010.
Midwest ISO Discussion February 5, 2009 Greg Levesque Manager – Regional Relations & Policy.
G&T Update – Western Farmers Electric Cooperative OAEC MR/PR Fall Meeting (2015)
Utah Geothermal Power Generation Workshop Regulatory Issues August 17, 2005 Presented by Becky Wilson Utility Economist Utah Public Service Commission.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting November 19, 2008.
Order 1000 Implementation in PJM – Challenges and Opportunities Jodi L. Moskowitz Senior Director – Transmission Development & Strategy October 13, 2015.
JACKSBORO TO WEST DENTON and WEST LEVEE TO NORWOOD 345-kV PROJECTS April 20, 2004 Transmission Services Operations.
Lauren Azar Senior Advisor to the Secretary U. S. Department of Energy May 31, 2013 – WI Public Utilities Institute 1 Transmission Planning – A National.
Transmission Capital Project Updates. Transmission Expansion Plan Sigurd to Red Butte 345 kV line in-service May, 2015 Permitting activities continue.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
PacifiCorp and CAISO Expanding Regional Energy Partnerships
California Energy Commission The Loading Order – How Are We Doing? Jackalyne Pfannenstiel Chairman California Energy Commission Independent Energy Producers.
FERC Order 1000 and its Potential Implications for BCCPG Transmission Providers BCCPG Steering Committee Meeting 20 September 2011.
AB 32 Update December 6, Outline Cap and Trade Program 2013 Update to Scoping Plan Looking ahead to
PJM© Market Efficiency RTEP Proposal Window PJM TEAC 1/9/2014 – Market Efficiency Presentation.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
2006 Preliminary Reliability Study Results Bryan Guy September 7, 2006.
RTO WEST Summary of RTO West 9/18/02 Declaratory Order Presentation to The Committee on Regional Electrical Power Cooperation (CREPC) by John Carr 10/1/02.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
LS Power LS Power is a power generation and transmission group
Alliance Update Illinois Commerce Commission Electric Policy Committee July 10, 2001.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
2016 Annual Attachment O Stakeholder Meeting Ameren Missouri
LNBA Subgroup: Avoided Transmission Value
Consolidated EIM Initiatives from 2017 Roadmap Issue Paper
BHP 2017 Projected Net Revenue Requirement Meeting
Rates & Regulatory Updates
BHP 2015 Formula Rate True-Up Meeting
BHP 2018 Projected Net Revenue Requirement Meeting
BHP 2017 Formula Rate True-Up Meeting
2014 Annual Attachment O Stakeholder Meeting Ameren Missouri
Presentation transcript:

Reno, NV December 18,

 Agenda 1. Regulatory Filings Update 2. Integrated Resource Plan Update 3. SB 123- NVision 4. Stakeholder Input 2

3 Regulatory Filings Update  One Company Filing  One Company Rate Case  Tariff Changes  NPC Rate Case Settlement  FERC Order 1000

 NVE filed an Application For Approval of Internal Reorganization May 31, 2013 ◦ Sierra Pacific to merge into Nevada Power. ◦ The surviving entity will be renamed NV Energy Operating Company. ◦ The transaction to be effective January 1, 2014 or the in-service date of ON Line. ◦ FERC issued an order on November 26, 2013 authorizing the transaction. 4

 NVE filed a combined rate case May 31, ◦ One set of rates for NV Energy Operating Company (the combined company) ◦ ON Line costs included  Expected completion – December 2013 ◦ Rates effective January 1, 2014 ◦ Transmission and NITS rate to be $3.57 per kW month ◦ ROE – 10.50% ◦ Loss for combined BAA updated 1.57% ◦ Updated rates for Sch. 1, 2, 3, 5, 6, 7, 8, 11 & NITS 5

 The case is currently in settlement proceedings at FERC.  Next settlement conference is scheduled for Thursday, January 16, 2014 at FERC. 6

 Tariff for NV Energy Operating Company requested to be effective Jan. 1, 2014  Tariff updated to reflect one BAA (SPPC / NEVP to be combined to NVE on 1/1/14) 7

 NPC filed a stand-alone rate case October 31,  On December 31, 2012 FERC accepted the filing and suspended the rates for five months to be effective June 1,  The December 31, 2012 order also established hearing and settlement judge proceedings.  Settlement was reached and NPC filed the settlement November 27,  On December 5, 2013 the Chief Judge granted a Motion for Interim Rate Relief effective November 1,

ScheduleDescriptionSettled RateMeasurement Rate Basic RateFirm Point to Point Service$1.88KW per month Basic RateNon-Firm Point to Point Service $1.88KW per month Basic RateNetwork Integration Transmission Service $1.88KW per month 1Scheduling$70.92MW per month 2Reactive Supply$292.00MW per month 3Regulation$7.25KW per month 5Spinning Reserve$7.25KW per month 6Supplemental Reserve$7.10KW per month 11Generator Regulation$7.25KW per month

 On July 21, 2011, the Federal Energy Regulatory Commission (“FERC”) issued Order No. 1000, Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities (“Order 1000”), which became effective on October 11, 2011  Four areas of reform: ◦ Regional transmission planning ◦ Interregional transmission planning coordination ◦ Right of First Refusal (ROFR) – N/A to Nevada ◦ Cost Allocation 10

 Public Utility Transmission Providers (“TPs”) required to participate in a regional planning process that satisfies Order 890 principles (coordination, openness, transparency, information exchange, comparability, dispute resolution and economic planning) and produces a regional transmission plan ◦ Each region to produce a regional plan reflecting solutions that meet the region’s needs more efficiently or cost effectively  Local and Regional transmission planning processes must consider transmission needs driven by “Public Policy Requirements” established by state or federal laws or regulations  TPs in each pair of neighboring planning regions must coordinate to determine if more efficient or cost-effective solutions are available 11

Order is process, not outcome, oriented FERC did not prescribe the exact manner for public utilities to develop the regional transmission planning process, but rather only set forth principles for public utilities, in consultation with stakeholders, to develop a transmission planning process for their regions (P157) FERC did not require that the regional transmission planning process create/establish obligations to build or commitments to construct transmission facilities – rather Order 1000 simply sets forth principles public utilities need to consider in developing a regional transmission planning process (P159) 12

 FERC concluded that the WestConnect filing partially complied with the requirements of Order No. 1000and directed further compliance filings:  State that WestConnect has an obligation to identify transmission solutions in the regional transmission planning process that more efficiently or cost-effectively meet transmission needs  Address Order No. 1000’s requirement to consider transmission needs driven by public policy requirements  Provide that regional cost allocations are binding on identified beneficiaries. 13

14 Integrated Resource Plan (IRP) Status

15 HOT WEATHER ENERGYPCTPEAKPCTPEAKPCT Year(GWH)GROWTH(MW)GROWTH(MW)GROWTH ,8565,5715, ,8890.2%5,6040.6%5,8410.6% ,0890.9%5,6560.9%5,8960.9% ,1440.3%5, %5, % ,3130.8%5,6540.4%5,8930.4% ,4920.8%5,7131.0%5,9551.1% ,8031.4%5,7951.4%6,0401.4% ,1291.4%5,8831.5%6,1321.5% ,4771.5%5,9631.4%6,2161.4% ,7141.0%6,0431.3%6,2991.3% ,9541.0%6,1081.1%6,3671.1% ,2271.1%6,1801.2%6,4421.2%

16 HOT WEATHER ENERGYPCTPEAKPCTPEAKPCT Year(GWH)GROWTH(MW)GROWTH(MW)GROWTH 20128,9491,6211, ,1792.6%1,6642.7%1,7282.7% 20149, %1, %1, % 20159,1390.2%1,6630.2%1,7230.0% 20169,2681.4%1, %1,7270.2% 20178, %1,6202.3%1, % 20189,0613.2%1,6511.9%1,6832.4% 20199,2742.4%1,6691.1%1,7151.9% 20209,3741.1%1,6840.9%1,7331.0% 20219,4741.1%1,6970.8%1,7490.9% 20229,4980.3%1,7030.4%1,7630.8% 20239,5000.0%1,7201.0%1,7690.3%

17 RECORDEDFORECAST Daily Temperatures 20-yr average Temps (MW)DateHourMaxMin(MW)MaxMin South5,8547/2/20135:00 PM115905, North1,7207/22/20135:00 PM101691,

IRP filed June 2012 (Docket ) 2. Planning period: 2013 – PUCN Final Order December 24, PUCN approval was not requested for any new transmission projects 18

ON Line Transmission Project 19

20

21 SCOPE ◦ 235-mile 500 kV transmission line Robinson-Harry Allen ◦ Robinson Summit 500/345 kV substation ◦ Falcon-Gonder Fold ◦ Series compensation on the existing Falcon – Gonder 345 kV line ◦ Harry Allen Terminal SPPC and NPC Balancing areas will be consolidated post ON- Line Budget revised from $510 million to $552 million In-service date of the project has been delayed to December 31, 2013

IRP filed July 1, 2013 (Docket ) 2. Planning period: 2014 – Requested approval for new transmission projects 22

Bordertown to Cal Sub 120 kV Line 1.The project was approved by the PUCN in 2007 and includes the construction of a 345/120 kV transformer at Bordertown Substation and a new 120 kV line from Bordertown substation to California Substation. 2.Project would provide additional transmission support to the West Reno transmission system for outages of a North Valley Road transformer and N-1-1 outages of the 120 kV transmission system. 3.To date Sierra has not obtained the required permits for this line and permitting work is continuing. The in-service date for this project has been moved from 2012 to

345 KV Voltage Support Project  Add 75 MVA 345 kV capacitor bank at North Valley Road substation and Mira Loma substation  Mira Loma in service date is December 2013  Valley Road in service date is February

Hycroft Mine Load Addition / Oreana 345/120 kV Substation  New 345/120 kV substation with a 280 MVA transformer  Expand existing Dun Glen Switching Station  Rebuild 119 & 162 lines to Bundled 954 ACSR for approx. 34 miles  Install approx. 48 miles of new Bundled 954 ACSR 120 kV line  Install a new 20 MVar Capacitor banks at Dun Glen and Hycroft 25

Carlin Trend Master Plan  Carlin Trend Under Voltage Load Shedding Scheme  Second Falcon 345/120 kV Transformer  Coyote Creek 120 kV Breaker Addition  Carlin Trend Transmission Additions 26

 “ Emission Reduction and Capacity Replacement Plan”  Requires NVE-South to retire or eliminate 800 MW of coal by 2019 (Reid Gardner 1,2&3 2014, Reid Gardner and Navajo 2019)  Requires NVE to replace coal with company owned 550 MW of generation either constructed or acquired ◦ Generation type not specified ◦ Receive cost recovery for decommissioning costs  Consumer protection, cap on rates at 5% 27

 Requires annual RFPs for 100 MW of new renewables in 2014, 15, 16 ◦ NVE can participate and compete in RFPs  Requires 50 MW of company-owned renewables to start construction by 2017  Expect to file a Resource Plan Amendment with the PUCN in the Spring of 2014 with plan to comply with SB123 and required resource additions.  New generation additions may require additional transmission including the addition of the Harry Allen 230/500 kV transformer. 28

29