Status Update on Mechanical Prototype in Rome November 6, 2013 1.

Slides:



Advertisements
Similar presentations
Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Advertisements

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
1 Short update Itzhak Tserruya HBD meeting BNL, April 11, 2006.
sTGC for ATLAS Small Wheel upgrade
Status of the ATLAS MM project
2005 LAT-COLLABORATION MEETING Gamma-ray Large Area Space Telescope A walk through the LAT Tracker towers alignment Nicola Omodei INFN-Pisa.
ATLAS-NSW CERN MMM workshop assembly of the module (quadruplet)
The Intermediate Silicon Layers detector OUTLINE ISL inside CDFII Why the ISL? Conceptual Design Ladders and Spaceframe Rasnik Online Alignment System.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
MM mechanical prototype Work progress at CERN MicroMegas General Meeting, CERN, 5-6 November
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
Production of precise large PCB’s Introduction to the problem Achievement in collaborating with industry (Print Electronics in IL and MDT in Italy). Conclusions.
CERN PH/DT 12/05/13 Jordan Degrange / Francisco Perez Gomez CERN PH/DT.
CERN PH/DT 30/01/14 Francisco Perez Gomez CERN PH/DT.
MM mechanical prototype Work progress at CERN MMM Rome, 15/07/20131.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
EC front unit status. Outline Conclusions from mechanical prototype and actions taken Status of electrical prototype KIT’s work for TA Dev plan (tests)
Status Report of activities in LNF Soldering procedure 1.Status of soldering machine 2.Measurement of wire position Chamber prototypes 1.Construction of.
Basic concept The NSW chambers are assemblies of Micromegas monolayers, TGC’s and spacer/stiffeners. In order to simplify the assembly procedures we propose.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
News from the lab Large size Micromegas chambers Saclay, April Givi Sekhniaidze / Joerg Wotschack.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
A.Ostaptchouk AMS Meeting at CERN, 16 July Measurements of Octagon Walls with 3D CMM Characteristics of 3D CMM Measurement program Results of insert.
TOP counter overview and issues K. Inami (Nagoya university) 2008/7/3-4 2 nd open meeting for proto-collaboration - Overview - Design - Performance - Prototype.
Update on SBS Back Tracker UVa K. Gnanvo, N. Liyanage, V Nelyubin, K. Saenboonruang, Seth Saher, Nikolai Pillip (visiting from Univ. Tel Aviv, Israel)
Performance of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger,
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
MM detector construction One or several modules per sector considerations.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 StaveMarco Kraan Paul Kuijer.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
M. Bianco On behalf of the ATLAS Collaboration
G. PassalevaRoma - July 28, 2004 Status of MWPC production site in Florence G. Passaleva.
Structure Update Installation & Building Update Revisions Outlined Costs Revisited (since given to Gina) Jeff Nelson Fermilab.
Givi Sekhniaidze1 CERN, 25 March Givi Sekhniaidze2 The angles for the chambers are: LM1 – ° LM2 – 7.224° SM1 – ° SM2 – ° Do we.
WP6 status report A. Di Mauro (CERN) ITS plenary meeting
Itzhak Tserruya, July 7,  Towards HBD Proposal  Ongoing activities and plans for the next two months Itzhak Tserruya HBD meeting at BNL, September.
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group Interface Workshops for ESS Warm-Linac: ISrc - LEBT.
TOF code status report : raw data data visualization geometry A. De Caro for the TOF group.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Precision Drift Chambers for the ATLAS Muon Spectrometer
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
SiD Hcal structure & 1m² Micromegas chamber prototype CALICE 2009 – LYON – 2009, septembre 17 th.
RICH2 support and cooling mechanics status update Massimo Benettoni July 30,
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
VEA’s proposal of automated assembly system WP6 meeting, 16/01/14.
Irfu.cea.fr ATLAS-NSW 4 TH MMM WORKSHOP SELECTION CRITERIA FOR THE DECISION ON THE MM CONSTRUCTION SCHEME of June 2013 Patrick PONSOT for the CEA-Saclay-Irfu.
Grid Pix Field Simulations and precision needed for a module Peter Kluit, Jan Timmermans Prepared 16 May 2016.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
“CENTRAL SUPPORT FRAME” -
Update on Pavia MM mechanical prototype
Planar distortions for SCT Barrel Modules
Grid Pix Field Simulations and precision needed for a module
Development of a low material endplate for LP1 and ILD
News from Saclay F. Bauer, M. Boyer, D. Desforges, E. Ferrer-Ribas, W. Gamache, A. Giganon, P.F. Giraud, P. Graffin, S. Herlant, S. Hervé, F. Jeanneau,
Equipment for Assembly – UK Experiences
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
Presentation transcript:

Status Update on Mechanical Prototype in Rome November 6,

Introduction We have built the mechanical M2 quadruplet prototype: – Assembly of the 5 panels with the “vacuum bag” technique (with some variants); – Assembly of the quadruplet. Outline of the talk: – Description of the method used for the assembly of the last 2 panels (two-steps gluing technique); – M2 panels: structure and components – Results of planarity measurements of the last 2 panels; – Quadruplet assembly; – Conclusions. 2

Method of construction - I Vacuum bag technique. Vacuum bag operated with an underpressure of 50 ÷ 100 mbar. 3

Method of construction - II First 3 panels (see july workshop presentation) : – Single-step vacuum bag gluing: PCB-1 on the granite table, PCB-2 on the honeycomb “pushed” by the bag. Glue is put on both PCBs;  asymmetric planarities obtained (*) ≈ 10 ÷ 20  m (bottom side) ≈ 30 ÷ 50  m (top side) Last 2 panels: – Two-steps vacuum bag gluing: PCB-1 glued as above. After a time  t the panel is turned and glued to PCB-2 standing on the granite table. –  t = 24 or 5 hrs (glue curing time ≈ o ) (*) Module 2 built with segmented honeycomb has larger RMSs 4

Test of two-step gluing method Aim of the method: reach a good planarity on both sides of the panel. We have done several tests to validate the two-step method, both with  t=5 and  t=24 hrs. 100x60 cm 2 panel  planarity below 20  m on both sides  thickness value -26  m wrt nominal  t = 24 hrs SIDE 1  t = 24 hrs SIDE 2 frame points frames were not rectified in this test 5

M2 panels – general structure mm 916 mm mm Aluminium rectified frames: 40 mm the outer frame 20 mm the inner bar

M2 panels - components PCB foilsHoneycomb NOMEX Aluminum frame nominal thickness (mm) effective average thickness (mm) (G10 foils) planarity RMS (  m) ≈ 20 ÷ 30≈ 25 PCB measurements done by PV group on sucking plane. Honeycomb measurements done using the LNF laser tracker with a gauge block above it. Frame thickness and planarity checked with Mitutoyo. Glue Araldite 2011: the glue is rolled to give a uniform layer of ≈ 60  m thickness. Nominal thickness=2x0.40+2x = ( panel 2) mm 7

Methods of planarity measurement - I Laser LNF ≈2500 points with few  m accuracy 8

Methods of planarity measurement - II CMM INFN Pisa (points are in a 4 cm spacing lattice) ≈700 points with 2  m nominal precision 9

Analysis of planarity measurements  A list of 3D points wrt a plane defined by the machine itself (obtained by measuring the granite table). Our analysis: – Raw distribution of heights of the points   RAW – Fit of the “best plane” ,  X,  Y – Distribution of heights wrt fitted plane   FIT All these infos are given in the following. LNF laser tracker is our baseline measurement, comparison with CMM will be shown. 10

Comparison between planarity measurements: LNF (laser tracker) vs. Pisa (CMM machine) – panel 5 side 1 11

Comparison between planarity measurements: LNF (laser tracker) vs. Pisa (CMM machine) – panel 5 side 2 12

Angles of fitted planes Panel  X (LNF)  X (Pisa)  Y (LNF)  Y (Pisa) 4_ _ _ _ RMS(LNF) = 25  rad RMS(Pisa) = 16  rad Correlation LNF-Pisa: Some correlation is present. 13  X,Y (Pisa)  X,Y (LNF)

Results: panel 4 (  t = 24 hrs) side 1 14  RAW (RMS) = 24.4 (28.6)  m  FIT (RMS) = 26.2 (27.0)  m removing the frames:  FIT = 21.7  m

Results: panel 4 (  t = 24 hrs) side 2 15  RAW (RMS) = 29.0 (30.7)  m  FIT (RMS) = 28.1 (27.9)  m removing the frames:  FIT = 22.9  m

Results: panel 5 (  t = 5 hrs) side 1 16  RAW (RMS) = 36.5 (39.1)  m  FIT (RMS) = 35.7 (35.7)  m “depression” on external frame removing the frames:  FIT = 22.8  m

Results: panel 5 (  t = 5 hrs) side 2 17  RAW (RMS) = 39.2 (41.2)  m  FIT (RMS) = 35.2 (38.8)  m “depression” on external frame removing the frames:  FIT = 21.5  m

Summary - I Panel #construction  (  m) (1) overall  (  m) (2) no frame Thickness (3) (mm) 1One-step gluing (-12) CMM machine 2One-step gluing (segmented hc) (-34) CMM machine (not to be considered) 3One-step gluing (+3) CMM machine 4Two-step gluing (  t = 24 hrs) (-33) Laser tracker 5Two-step gluing (  t = 5 hrs) (-1) Laser tracker (1)Sigma obtained after plane fitting  FIT (2)The measurement is performed removing all points within 10 cm from the frame (3)Thickness measured with side 1 in the table. In () difference in  m wrt nominal. 18

Summary - II Planarities: – Two-steps method with  t = 24 hrs turns out to be the best option with overall planarities RMS well below 30  m on both faces. – Improvements expected by a better “definition” of the frame  20  m planarities can be reached. Panel thickness wrt nominal (assuming 2x60  m glue thickness) : – In average -15  m with an RMS of 17  m. – Improvements expected by a better control of the glue amount. Methods of measurement – CMM machine and Laser-tracker give results in good agreement. 19

Quadruplet assembly - I Assembly scheme: Panels are glued to drift gap frames (5 mm thick Al not rectified, 20 mm wide) No vacuum bag used, gluing by gravity all panels in a single step. 20

Quadruplet assembly - II 21

Quadruplet assembly - III Precision pins Connecting the two “strip panels”. 22

Status of quadruplet Mechanical properties still to be measured. Probably a “sag” effect on the top side, to be quantified. We plan to make holes along the frame to allow mounting on the spacer. 23

Conclusions M2 dummy quadruplet ready to be mounted (only holes are still missing). Vacuum bag technique (with two-steps gluing option) allows to get: – Overall planarities below 30  m on both sides; – Average thickness reproducibility better than 20  m; – Space for improvements from better frame structure and glue amount control. Plan to build a full-size SM1 drift panel using the two-step method with  t = 24 hrs 24

Backup 25

26

27

28