Variation 6 - Water Allocation What were we up against and what was achieved? - Irrigation perspective Dr Paul Le Mière Regional Policy Manager.

Slides:



Advertisements
Similar presentations
David Purkey, SEI Rob Lempert, RAND
Advertisements

1 AEP Perspectives on Development and Commercialization of CCS Technology for Natural Gas Power Generation Matt Usher, P.E. Director – New Technology Development.
Presentation to CSWS Darfield 2006 Irrigation and the Canterbury Economy Social and Economic Impacts Nick Brown Stuart Ford The AgriBusiness Group.
Environmental Performance Committee 12 March 2014.
University of South Australia – School of International Business Water Markets: Lessons From Australia Dr. Henning Bjornlund School of International Business.
Price Forecasting. Price Analysis Fundamental AnalysisTechnical Analysis Fundamental Analysis: involves the use of supply, demand and other economic factors.
Energy Consumption in U.S. Agriculture John A. Miranowski Professor of Economics Iowa State University.
Energy Development in China - From a View Point of Sustainable Development Yang Hongwei, Zhou Dadi Energy Research Institute, P. R. China
Event / date: West Balkan NFPs-EEA Coordination meeting / 21 Oct 2014 Author: Anita Künitzer (ETC/ICM) Event / date: West Balkan NFPs-EEA Coordination.
WATER ISSUES IN THE EASTERN EUROPE:
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
Dale Turner - A Hydro-Electric Future? 1 Thursday 24th February, 2005 Week 7 Hydro-Electricity UK Appraisal Until 2020 and 2030.
INKOMATI CATCHMENT MANAGEMENT AGENCY Science & Management.
Regional Plan Variation 5 Protecting Lake Taupo Natasha Hayward Programme Manager - On farm Consents.
Modeling Impacts of Policy Responses to Prolonged and Severe Drought in the Upper Rio Grande River Basin Dr. James F. Booker, Siena College Douglas T.
Planning appeals Peter Ford Head of Development Management Planning Committee Training – 30 th July 2015.
NZTA’s Proposed Changes to the Regional Freshwater Plan for the Wellington Region Part of a proposal of national significance Community Meeting 16 February.
Agricultural water use in New Zealand: should more be done to balance private property rights with greater public interest in an increasingly scarce resource?
Sustainable Dairying: Water Accord The Sustainable Dairying: Water Accord (the Accord) has been developed under the oversight of the Dairy Environment.
A State approach to ensuring the long term viability of irrigated farming areas of Victoria Bryony Grice Manager Sustainable Irrigation.
By: Kieshauna Walker….  It works by harnessing the potential energy of flowing water.  Hydroelectric and coal power plants produce electricity kind.
Legal developments in the Polish Power Sector Arkadiusz Krasnodębski.
1 Floodplain Management SESSION 21 Policy History: Rivers as a Legal Battleground Public Policy in the American Federal System – An Overview Prepared by.
Water Resource Management in North Carolina September 26, 2008 Mitch Peele Sr. Director of Public Policy NC Farm Bureau.
Waterpower By Michael Ostrode and Nico Sallay. Contents 1. What is waterpower ? 2. The first hydro power plant of the world 3. The first hydro power plant.
Hydro power 16.3 % Wind power 0.1 % Peat 6.9 % Other renewable 11.4 % Nuclear power 26.8 % Natural gas 10.3 % Coal 14.1 % Oil 1.9 % Net imports 12.2 %
Moray CPB Budget and Prevention Calum Elliot March 2013.
El Gallo Hydroelectricity Project PDD Analysis
Opportunities and Challenges of Water Resources Management in Lao PDR
Te Waihora/Ellesmere Catchment Regional Water Plan An Introduction for the Selwyn/Waihora Water Management Zone Committee Lynda Weastell Murchison Principal.
NATIONAL WATER RESOURCE STRATEGY SOUTH AFRICA’S WATER SITUATION AND STRATEGIES TO BALANCE SUPPLY AND DEMAND LOWER ORANGE WMA.
Secrets to Success for Implementing Hyperion Planning Erica Harris and Karen Botting Environment Waikato.
September 8, 2015 Update Housing Committee September 8, 2015 Neighborhood Revitalization Plan for Dallas.
GDC Strategy 2016 – 2019 Local Dental Committees 5 October 2015.
Agriculture and Rural Development Demonstrating compliance with article 46 of RDR for investments in irrigation Meeting of the Strategic Coordination Group.
Why do we need more housing? The East Midlands Regional Plan is still in force, which requires 510 houses to be built per annum between 2006 and 2026 Although.
A Presentation to the Kenya Water Towers, Forests and Green Economy National Dialogue; By: Eng. Philip J. Olum CEO- Water Resources Management Authority.
Richard McKey: Technical Specialist, Hydrology and Water Allocation 7 years in hydrology, experience of field hydrology, flood forecast modelling, low.
Orari, Opihi, Pareora Community Catchment Workshop 4 th November 2015 Mike Barton.
COOSA-NORTH GEORGIA REGIONAL WATER PLANNING COUNCIL Water Demand Forecasting: Energy Update May 4, 2016 NGWRP Meeting CH2M.
Overview of Surface Water Allocation in the NSR Watershed
James Palmer, HBRC The Future of Our Water; Community Symposium
Emergency Resiliency Fund (ERF)
Tourism Growth Partnership – Round 5
Irrigation Development and Financing in Nepal
Economic Joint Venture model: summary of progress
Road Manager Module National Heavy Vehicle Regulator
FlorenceForum November 2008
Key messages The AHDB is restructuring to look, feel and behave more like one organisation We will make smarter use of our skilled workforce, increase.
Presentation of the case in Japan for Technical Committee K - Integrated Operation of Hydropower Stations and Reservoirs- Centers for Civil Engineering.
Freshwater Futures Update (including update on catchment modelling & scenarios) Rangitāiki River Forum 29 September 2017.
SCG Meeting Brussels, 9 February 2017
Freshwater Futures Update Rangitāiki River Forum 21 March 2017
Mitigation and aquifer recharge opportunities in the Clark Fork Basin
The Updated Margin Protection Plan–2018
Georgia Agricultural Metering Program
Other renewable energy sources
2018 Kern County Water Summit
WESTAR Fall Meeting October 2, 2008
SOCIAL DIALOGUE TIMELINE
Emergency Resiliency Fund (ERF)
Road Manager Module National Heavy Vehicle Regulator
PARCA Timeline.
Crop Marketing Winnebago County Grain Marketing Thompson, Iowa
IEEE P Wireless RANs Date:
EGC’s 6th Report to the Nation
XRN 4954 – MiR Drop 5 - Status Update
XRN 4927 – MiR Drop 4 - Status Update
Waikato Economic Joint Venture Project Overview
Indiana Finance Authority (IFA)
Presentation transcript:

Variation 6 - Water Allocation What were we up against and what was achieved? - Irrigation perspective Dr Paul Le Mière Regional Policy Manager

Contents Background What we were up against Inter primary sector tensions Achievements Lessons Emerging issues

What is Variation 6? WRC attempt at a set of rules on Water allocation for Waikato Brought about due to large upper Waikato irrigators applying for large volumes of water and growth of municipal demand. WRC allowed catchments to go over allocated for last twenty years. Used % of Q5 (one in 5 year low flow) as measure of allocation (up to 30% of Q5)

What were we up against - Variation 6- Rules prioritised consents at common expiry dates. –existing municipal user, then –new municipal users, –then existing industrial users (inc. farmers, irrigators) –then new industrial users. Even if existing, at 100% allocation farm takes were Non Complying. All takes, even minor, had to be metered and reported on Hydro-electricity generation was prioritised above Karapiro. (RE NPS). Philosophical stance to give 96.4% of Q5 to hydro (>99% of flow) Water harvesting not enabled. MRP advocated a no spill hydro system! Fresh Water NPS not in force until EC hearing stage. Council very intransigent and refused to Mediate. Many large players protecting their interests: - Municipal, MRP, Agriculture & Horticulture, CHH, etc

Tensions within PP sector Council allowed many catchments to go over allocated over last couple of decades. Majority of Dairy farmers (95%) unwittingly did not have the dairy shed washdown consents they technically should of. Thus tension between legitimising existing dairy activities and protecting consented activities such as irrigation and Milk factories takes. Compounded by lack of information of water efficiencies and economic importance of takes.

Paiko catchment ( % overallocated)

What would it have meant? All Dairy farmers in over-allocated catchments would have had to apply for very expensive and onerous consents (non- complying) and most of these would not have been granted. Other catchments still a discretionary consent for existing takes. Most of the rest facing cost increases for water. No Dairy increase in upper Waikato and issues for those converted since Consented Irrigators (Ag/Hort) up for renewal became non complying

Timelines Developed by regional council. Oct 2006 Variation Notified Dec 2007 – Mar 2008 Hearings – Extensive evidence by AWG Oct 2008 Decisions Version Jan 2009 Parties Appeal to EC Mar Early 2010 ‘Meetings’. NO mediations. Aug 2010 WRC evidence received Sept 2010 New WRC version - Major changes Oct 2010 All appellants evidence in (>50 documents) Dec Feb 2011 EC Hearings start Apr – June 2011 Expert witness caucusing (many changes) July 2011 Closing Legal arguments from appellants Dec 2011Environment Court decision released Jan 2012Variation 6 has full legal effect Apr 2012WRC formally adopts Variation 6 Millions of dollars spent especially at EC. Now in implementation stage, >4000 consents by end 2014

Outcomes Achieved Asked forFinal Version Changes Acknowledgement of primary production Explicit statements of importance of Primary production in Issues and Objectives Delete Order of priority Policy Deleted Protect existing dairy water takes Controlled rule (15 years) to ’grandparent’ existing dairy takes esp. in overallocated catchments Increase allocable % above Karapiro Increase to 5% given from 3.6%. Important for irrigation. Worth $150m to $200m. Less metering requirements Only require metering above certain pump size Increased priority for dairy water Now dairy shed washdown same as drinking water and 2 nd best priority.

Lessons Learned All Primary production sectors needed to work together sooner and better. Information was lacking on Ag primary sector water use and economics. Information on water use efficiency lacking Early effort into mediation needed and collaboration paramount. WRC now trying collaborative governance model ! Need rules before you are over allocated.

Emerging issues WRC needing major help and resources for primary industry to help obtain >4000 consents by end of 2014 Watercare consent for Auckland for up to 200,000m 3 a day lodged (2% of Q5 at take). Any potential clawback from Watercare over allocating whole of river very unclear.

Wairakei Thank You Questions ?

Above Karapiro evidence WRC set above Karapiro at 3.6% of Q5 –Based on Oct 2006 useage – rest for MRP –<1% of river flow Scenario A – Increase to 4% Q5 –Need for existing growth since Oct 2006 –Max 120,000 Ha converted to Dairy (Drinking + dairy shed) Value farm gate 09/10 payout Scenario B – Increase to 5.8% of Q5 –Scenario A plus –10 years future irrigation Demand (4,000 Ha) Scenario C – Increase to 7.5% of Q5 –Scenario A plus –20 years future irrigation Demand (8,000 Ha)

Cost of MRP Complicated as modeled per dam per week. Lost Generation Cost to MRP : –Scenario A - $160,000 p.a. –Scenario B - $840,000 p.a. –Scenario C - $1,500,000 p.a. Overall Very minor under A and B No material impact on wider NZ electricity industry –Easily replaced by renewable coming online –And industry own savings –Scenario A – replaced by 5-6 turbines !

Conditions around grandparenting takes To secure existing Dairy shed takes under controlled activity: Need to lodge application by 1 Jan 2015 Net Amount needs to be same or less than 15 Oct 2008 (prev 2006) Stock need to be fenced 3m from river water is taken from (Completed 3 years from consent given) Riparian planting to take place along water body from which take occurs. –3m wide –If no planting exist then 2500 stems Ha / 80% native. –To take place progressively over term of consent (normally 15 years)

Conditions around grandparenting takes To secure existing Dairy shed takes under controlled activity: Need to lodge application by 1 Jan 2015 Net Amount needs to be same or less than 15 Oct 2008 (prev 2006) Stock need to be fenced 3m from river water is taken from (Completed 3 years from consent given) Riparian planting to take place along water body from which take occurs. –3m wide –If no planting exist then 2500 stems Ha / 80% native. –To take place progressively over term of consent (normally 15 years)

Stock Water – Surface Takes Existing Takes Catchment allocation Appealed version Final Version < 15m 3 =>100%DiscretionaryAllowed < 100%Allowed > 15m 3 =>100%DiscretionaryAllowed < 100%Allowed New TakesCatchment allocation Appealed version Final Version < 15m 3 =>100%Discretionary < 100%Allowed > 15m 3 =>100%Discretionary < 100%Allowed

Dairy shed - Surface Takes Existing Takes Catchment allocation Appealed Version Final Version < 15m 3 =>100%DiscretionaryPermitted < 100%Permitted > 15m 3 =>100%Non- Complying Controlled* < 100%ControlledControlled* New TakesCatchment allocation Appealed version Final Version < 15m 3 =>100%Discretionary < 100%Permitted > 15m 3 =>100%Non-Complying < 100%R Disc. / Cont