Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.

Slides:



Advertisements
Similar presentations
RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Coll Eng E Doyle 1/18 LARP Phase II Secondary Collimator RC1 Prototype Engineering Status 6/21/06 Jaw-hub-shaft concept - continued Permanent.
Status of the MuCool Cavity Prototype Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 21, 2005.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
A. Bertarelli – A. DallocchioLHC Collimation Phase II – Specification Meeting – 7/11/2008 Phase II Collimators: design status, options and future outlook.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Beam LARP Rotatable Collimator Mechanical Engineering Discussion 03 October 2008 Phase II CERN ME Video Mtg. Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
MECHANICAL DESIGN OF TCSP COLLIMATORS Secondary Collimators Embedding BPMs L. GENTINI, A. Dallocchio, A. Bertarelli, F. Carra, M. Garlasche.
Office of Science Coupling Coil Status S. Gourlay August 1, 2012.
Summary of Accelerator Systems Collimation Parallel Session 19 October 2007 LARP CM#9 - SLAC Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator.
LHC Phase II Collimator teleconference - 4 March 2008LHC Rotatable Phase II Collimators 1 beam LARP Phase II collimator Progress and Plans 4 March 2008.
1 LARP Phase II Secondary Rotatable Collimator Evolution of design changes 3 rd March, 2010.
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 16 May 2006 No 1 /22 LARP Phase II Secondary Collimator RC1 Collimator Test Program Revised 5/15/06.
The SLAC Phase II Collimator Program 15 June 2005 CERN Team Visit Tom Markiewicz SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
SLAC RC Status Report 30 August 2010 LHC Collimation Working Group Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
SLAC R&D Mtg November 2007LHC Rotatable Phase II CollimatorsSlide # / 17 beam LARP Rotatable Collimators for LHC Phase II Collimation 12 November.
LARP LHC PHASE II COLL RC1 - S. Lundgren 1 April 2009 No 1 /6n LARP Phase II Secondary Collimator RC-1 Mechanical Design Review 01/04/09.
A. Bertarelli CERN TS – MME Group 1 CERN European Organization for Nuclear Research Actuating system of the LHC Collimators (Phase 1) Main Features.
1 Assembly and installation of TM0 in the Lab Assembly and installation of TM0 in the Lab F. Rossi September.
Beam Rotatable Collimators as a Possible US Contribution to the LHC Luminosity Upgrade Project 24 April 2008 LARP CM#10 Tom Markiewicz/SLAC BNL - FNAL-
Beam Rotatable Collimators as a Possible US Contribution to the LHC Luminosity Upgrade Project 20 June 2008 LARP DOE Review Tom Markiewicz/SLAC BNL - FNAL-
Task List for Phase II Rotatable Collimator Project at SLAC 30 January 2007 CERN/LARP Video Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
Collimation Overview 28 October 2008 LARP CM11, Fermilab Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program 1)Short Status.
LARP LHC PHASE II SECONDARY COLLIMATOR CD1 REVIEW. - E. Doyle 15 Dec /25 LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 Prototype Engineering.
LARP Rotatable Collimators for LHC Phase II Collimation 09 July 2007 SLAC R&D Status Meeting Gene Anzalone, Eric Doyle, Lew Keller, Steve Lundgren, & Tom.
LARP Rotatable Collimators 19 June 2006 ILC R&D Status Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 10 Dec 2007 No 1 /12 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
LARP LHC PHASE II COLL RC1 - S. Lundgren 21 Sep 2009 No 1/17 LARP Phase II Secondary Collimator RC-1 Collimator Development Status and Outlook Revised.
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
1 SLAC RC Status Report 19 July 2010 LHC Collimation Working Group Meeting Jeff Smith/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
HL-LHC LARP Accelerator Systems 17 February 2014 LARP DOE Review Fermilab T. Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
LARP Phase II Secondary Collimator Status Report SLAC ILC R&D Summary Meeting 24 April 2006 T. Markiewicz/SLAC.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
LCWS11 WG4 Fully featured accelerating structure engineering design
LARP Phase II Secondary Collimator RC1, ETC - Status 4/10/06
Status of material tests
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 RC1 Construction and Test Plan LARP LHC PHASE II COLL REVIEW – RC1.
LARP Phase II Secondary Collimator RC-1
SLAC RC Status Report US LHC Accelerator Research Program
Recommendations of 12/16/05 review committee & SLAC response
23 April 2012 Tom Markiewicz/SLAC
LARP Phase II Secondary Collimator RC1
Phase II Collimators : design status
LARP Phase II Secondary Rotatable Collimator
LARP Phase II Secondary Rotatable Collimator
LARP Phase II Secondary Rotatable Collimator
LARP Phase II Secondary Collimator RC-1
LARP Phase II Secondary Collimator RC-1
LARP Phase II Secondary Collimator RC-0 and RC-1
LARP Rotatable Collimators for LHC Phase II Collimation
LARP Phase II Secondary Collimator RC-1
LARP Phase II Secondary Collimator RC-0 and RC-1
BGC Collaboration Meeting –
Presentation transcript:

Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program 6 September 2013

Collimator Assembled 13-Mar-11 Mechanical & Resistance Tests Good LHC Collimation WG Mtg - 30 Sept 2013LARP RC Status - T. MarkiewiczSlide n° 2 / 18

Collimator Assembled 18-Sept-13 Mechanical & Resistance Tests Good LHC Collimation WG Mtg - 30 Sept 2013LARP RC Status - T. MarkiewiczSlide n° 3 / 18

Continuous 15m copper tube wrapped on copper mandrel Tube enters from far end of mandrel then begins spiral to provide ~1m free length that can twist to allow rotation 25mm thick Glidcop “jaw” brazed to mandrel 20 “20mm wide facets” 25um flat are the collimating surfaces Molybdenum shaft with 2mm “heat expansion gap” from mandrel Mandrel held at midpoint only by a brazed Glidcop “hub” Jaw Designed to Minimize Thermal Distortion 1 hour beam→12kW with 10 second transients x5→60kW LHC Collimation WG Mtg - 30 Sept 2013LARP RC Status - T. MarkiewiczSlide n° 4 / 18

New Bearing Restraint LHC Collimation WG Mtg - 30 Sept 2013LARP RC Status - T. Markiewicz “Naked” Hub Screwed to AxleBearing on HubSpacer Ring & Bearing in Housing Bearing RestraintRing, Bearing in Housing & ClipOversize Outer Housing w/ Flats that prevent rotation in jaw supports Slide n° 5 / 18

New RF Bearing Assembly LHC Collimation WG Mtg - 30 Sept 2013LARP RC Status - T. Markiewicz Ceramic bearing in race & the 2 rings that capture it Assembled bearing package that will hold the RF Foil Trapped bearing in ring that is fixed to the collimator jaw Attaching outer ring to collimatorCloseup of ridge where bearing rolls Before outer ring screwed on Slide n° 6 / 18

Final RF Bearing Installed LHC Collimation WG Mtg - 30 Sept 2013LARP RC Status - T. MarkiewiczSlide n° 7 / 18

BeCu Foils, Rhodium plate “wipers”, Clamps to keep RF Bearing Package from Dragging LHC Collimation WG Mtg - 30 Sept 2013LARP RC Status - T. Markiewicz Foils, wipers & clamps Thermistor/Foil/Wiper Holder Holder w/Wiper/Foil Attached Beam-side View View Behind Foil w/ Clamp ATtached Slide n° 8 / 18

Welding Flanges Attached to Tank Cover and Baseplate LHC Collimation WG Mtg - 30 Sept 2013LARP RC Status - T. MarkiewiczSlide n° 9 / 18

Dry Fit Cover to Baseplate & test Rotation w/Foils Attached LHC Collimation WG Mtg - 30 Sept 2013LARP RC Status - T. MarkiewiczSlide n° 10 / 18

Resistivity Test: 1 mOhm/side LHC Collimation WG Mtg - 30 Sept 2013LARP RC Status - T. MarkiewiczSlide n° 11 / 18

Jaw Alignment & CMM LHC Collimation WG Mtg - 30 Sept 2013LARP RC Status - T. MarkiewiczSlide n° 12 / 18

Final Adjustment of Actuator & Drive Wheel (relative to Inner Limit Switch) LHC Collimation WG Mtg - 30 Sept 2013LARP RC Status - T. Markiewicz Remember to play movie Slide n° 13 / 18

Leak Test Cooling Tubes (most recent) Pressure & Leak Rate LHC Collimation WG Mtg - 30 Sept 2013LARP RC Status - T. Markiewicz Left Jaw (AC)Right Jaw (BD) Slide n° 14 / 18

Prep & “CuSil” the Cooling Tube to the Bellows Feedthrough LHC Collimation WG Mtg - 30 Sept 2013LARP RC Status - T. MarkiewiczSlide n° 15 / 18

Need Today to Remove Spring to CuSil the Remaining Two Tubes LHC Collimation WG Mtg - 30 Sept 2013LARP RC Status - T. MarkiewiczSlide n° 16 / 18

Work List After that, wind 2 nd mandrel, then ………….. Prep with strips & braze coils and inner hub/shafts to mandrels (2 of 2 done) Machine assembly round & concentric to axis at diameter to accept Glidcop jaws Machine & Cu plate Glidcop jaws Prep and braze jaws to mandrels (2 nd done 8-Apr-13) Machine facets, end features (2 nd done 28-May-13) Install RF bearing housing Install shaft support bearings and rotation drives Test prior to installation in vacuum system Prep existing vacuum base plate to receive new collimators Mount, align & test Decide details of how vacuum cover will be attached to vacuum base plate & machine appropriately Mate cover & baseplate Test rotation after welding, pre and post vacuum Vacuum bakeout Test after bakeout Ship Begin 3-June-2-13 SLAC SLAC? LHC Collimation WG Mtg - 30 Sept 2013LARP RC Status - T. MarkiewiczSlide n° 17 / 18

At SLAC After CuSil test for tube integrity Clamp vacuum cover in place, attach foils & test rotate 1 facet Weld cover, vacuum test all welds & CuSil joints Final full facet test rotation in vacuum Solder metric water fittings, pressure test then dry & leak test tubes again Immobilize jaws & ship (in 2 weeks time?) At CERN Decide whether to open vacuum seal or not Off beam tests: Function, metrology, impedance, vacuum Bakeout (???) SPS tests (???) Hi Rad Mat Tests & Subsequent Analysis Suggested Plan That Needs More Discussion LHC Collimation WG Mtg - 30 Sept 2013LARP RC Status - T. MarkiewiczSlide n° 18 / 18