PROJECT OVERVIEW FM Budget21 589 225€ Total contracted 16 214 784.16 € –EU Grant 12 532 983.41€ –National Co-financing 3 681 801.05 –Total contracted /

Slides:



Advertisements
Similar presentations
Central Office for Development Strategy and Coordination of EU Funds ABSORPTION CAPACITY FOR IPA COMPONENTS III AND IV IN CROATIA 19 October 2009 Zvonimir.
Advertisements

Bulgaria’s strategic road infrastructure challenges.
2000/BG/16/P/PE/002 “Set of 5 regional waste disposal sites located in Montana, Ruse, Sevlievo, Silistra and Sozopol”
ISPA Measure 2000 BG 16 P PE 001 Integrated water project – City of Sofia Performance 100%
Arrangements regarding ECP 2014–2020 implementation 1.Implementation of the Republic of Slovenia Budget Act Specific section for the period:
Development of the Wastewater Collection and Treatment System in Szombathely County Town Implementation of sewage-sludge Composting Plant 2003/HU/16/P/PE/021.
„Extension and modernization of water and wastewater infrastructure in Arad County”
Solid Waste Grant Program Congratulations! Your project has been approved for funding…. What now?
Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2001 BG 16 P PE 004 FGD Plants at Units 5&6 of TPP Maritsa East 2.
Audits of pre-accession funds in the State Audit Office of the Republic of Latvia 2000/2001 Uldis Kremers Auditor of the Audit Department of the State.
Financial reporting Elise Oukka, Head of Finance, FMO Riga.
MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REG 1164/94) Tenth Cohesion Fund (Regulation 1164/94) Monitoring.
Implementation Section Romania-Bulgaria Cross-Border Cooperation Operational Programme Joint Approval Committee, Bucharest, 3 April 2007.
Options for CBP Agreement and EC Membership For Principals’ Staff Committee Consideration March, 2013.
STEPS FOR FUNDING ELI-NP March 11 st 2011 Dan Cutoiu.
Proposed SAHA Fiscal Year Consolidated Budget.
LOS OSOS WASTEWATER PROJECT UPDATE March 4, 2008.
OP Entrepreneurship and Innovations Launching Event in Latvia – 25 September 2007 Ms. Sanda Rieksta EU Funds Managing Authority.
Environmental Investment Centre (EIC) ISPA Unit Rävala pst 8, TALLINN Tel: Fax:
Road infrastructure in Bulgaria 1 Slovene – Bulgarian Business Forum, 12 th May 2010 Vasilka Kostadinova Director of Directorate “Implementation of EU.
8th Cohesion Fund Monitoring Committee 11 April 2008 Technical Assistance for the Cohesion Fund Management in Latvia No.2005/LV/16/C/PA/001.
Balchik Integrated Water Project in Bulgaria ISPA Measure 2002 BG 17 P PE 017 WWTP BALCHIK.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REGULATION 1164/94) MANAGEMENT OF PROJECTS, FINANCED BY COHESION.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Progress with Priority Environmental Infrastructure Investment Projects in Croatia PEIP Regional Meeting - 26 th November 2007 Brussels MINISTRY OF ENVIRONMENTAL.
Republic of Croatia Ministry of Environmental Protection, Physical Planning and Construction Experience in Implementation of IPA Projects in Croatia Brussels,
JASPERS for CEF Stéphane OUAKI Head Of Unit
1 Maribor Wastewater Treatment Plant Presentation of PPP Model in Maribor - Slovenia Conference Danilo ŠALAMON – Chief of the Infrastructure projects Department.
Experience of Accessing EU Financial Support in Lithuania 4th PG Funding Meeting , Paris.
1 Improvement of the Polish data collection system on water and waste water statistics Project co-financed by the European Commission under the Grant Agreement.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
The Cohesion Fund in Poland and the Selection System for Environmental Investments Andrzej Guła Institute of Environmental Economics – Poland CEE Bankwatch.
7 th Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2001 BG 16 P PE 006 Wastewater Collection and treatment located in Pazardjik, Republic.
ISPA Measure 2002 BG 16 P PE 016 Varna Integrated Water Project Transformationof Transformation of WWTP Asparuhovo Reconstruction of WWTP Varna ReconstructionofWS&
ISPA Measure 2003 BG 16 P PE 019 Kardjali Regional Waste Management Centre in Bulgaria 10 th Cohesion Fund Monitoring Committee CR 1164/94.
Future outlook and next steps for ESPON The ESPON 2013 Programme OPEN DAYS Bruxelles, 10 October 2007.
9 th Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2002 BG 16 P PE 018 Shoumen Water Cycle Improvements.
CONFERENCE IMPLEMENTATION OF MARKETS IN FINANCIAL INSTRUMENTS DIRECTIVE -MiFID- Split, June 2007 OPENING SPEECH Ante Samodol President of the Board.
CFCU PROGRESS AND MONITORING REPORTS (PMRs)
Ing. Alena Bujnová, Head of Water Policy Department Ministry of Environment of the Slovak Republic.
ERANETMED Joint Activities, particularly the 1st Joint Call ERANETMED is funded by the European Commission’s 7th Framework Programme ERANETMED multi-tasks.
TAIEX – REGIO Multi Country Workshop on management practices for environmental investments 8-9 December 2015, Vilnius Presentation by BULGARIA Ministry.
Ministry of Finance Compliance assessment of the management and control systems of the managing authorities under the Operational programmes. Conclusions.
Ministry of Finance Financial management and control of the Operational Programmes, co- financed under the Structural funds and the Cohesion fund of EU.
Financial Implementation of the Assistance from the Structural Funds and the Cohesion Fund of the EU Sylvia Indjova Head of Certifying Authority Director.
WASTEWATER TREATMENT IN BULGARIA STATUS AND CHALANGES ORLIN DIKOV – INFRASTRUCTURE CONSULTANT.
Works Contract Commencement Date: 20th May 2005
Transnational training seminar for potential Lead Partners and Partners to INTEREGG IIIB-CADSES procedures for 3° call for proposal CADSES implementation.
Ministry of Finance Contribution of the Operational Programmes to the implementation of the NSRF objectives Boriana Pencheva Director Management.
Structural Funds Financial management and Control, Romania
Integrated Water Project for the town of Sliven
Key Moments and Forthcoming Activities in 2009
Water projects under The Cohesion Fund.
Lower Rio Grande Valley Development Council
Programme Board Meeting
PRIIA Section 209 States Working Group/Amtrak Update
Measure N Update Board Items for June 07, 2017
ISPA Measure 2002 BG 16 P PE 015 WWTP Popovo and main collectors
ISPA Measure 2002 BG 16 P PE 014 WWTP SEVLIEVO
SOCIAL DIALOGUE WITHIN EUPAN
ISPA Measure 2002 BG 16 P PE 009 WWTP Bourgas – Meden Rudnik
ISPA Measure 2002 BG 16 P PE 010 Targovishte Wastewater Collection and Treatment, Republic of Bulgaria.
WG Environmental Accounts
ISPA Measure 2002 BG 16 P PE 011 WWTP LOVECH
Transition from ISPA to Cohesion Fund
Review plan of the nature reporting – update 6
Shoumen Water Cycle Improvements
WP 1 Management and Coordination
for the Revision of the Constitutions
2015 January February March April May June July August September
Presentation transcript:

PROJECT OVERVIEW FM Budget € Total contracted € –EU Grant € –National Co-financing –Total contracted / FM budget % Total certified € Financial Implementation certified / contract : 80,22 % 9 th Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2002 BG 17 P PE 017

9 th Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2002 BG 17 P PE 017 WWTP BALCHIK AND МАRINE OUTFALL

Works Contract WWTP Balchik Commencement Date:28 th June 2006 Completion Date: 10 th March 2010 Physical Execution:99.6 % Financial Execution:80 % WWTP is operational as from 10 th March year DNP commenced on 10 th March th Cohesion Fund Monitoring Committee CR 1164/94

WWTP Balchik Taking – over of the Works and Sections 9 th Cohesion Fund Monitoring Committee CR 1164/94

WWTP BALCHIK Aeration tank Sludge tank 9 th Cohesion Fund Monitoring Committee CR 1164/94

WWTP BALCHIK Main Tanks 9 th Cohesion Fund Monitoring Committee CR 1164/94

WWTP BALCHIK Sludge Storage Tank 9 th Cohesion Fund Monitoring Committee CR 1164/94

Works Contract Balchik Water Supply& Sewerage Network Connections ISPA Measure 2002 BG 17 P PE 017 Date of works contract signature: 18 th of Dec Commencement Date: 21 st of April 2008 Completion Date:5 th of January 2010 Physical Execution:99.8% Financial Execution:75% 9 th Cohesion Fund Monitoring Committee CR 1164/94

Balchik Water Supply& Sewerage Network Connections Information boards 9 th Cohesion Fund Monitoring Committee CR 1164/94

Balchik Water Supply & Sewerage Network Connections Varnenska str.part No1 fully competed Varnenska str.part No2 fully competed 9 th Cohesion Fund Monitoring Committee CR 1164/94

Balchik Water Supply & Sewerage Network Connections Edelvays str.part 1 – fully completed Edelvays str.part 2 – fully completed 9 th Cohesion Fund Monitoring Committee CR 1164/94

Balchik Water Supply & Sewerage Network Connections Sr.Gora str. part 1- fully completed Sr.Gora str. part 2 -– gravelling works 9 th Cohesion Fund Monitoring Committee CR 1164/94

Balchik Water Supply & Sewerage Network Connections Volga str. part No1 – fully completed Volga str. part No2 – fully completed 9 th Cohesion Fund Monitoring Committee CR 1164/94

Service Contract Preparation of Design and Works Supervision for ISPA Measure Balchik Commencement Date:15 th December 2005 Completion Date:30 th December 2011 Time elapsed:100 % Financial Execution:85 % 9 th Cohesion Fund Monitoring Committee CR 1164/94

Service Contract Technical Assistance for Implementation of four ISPA Measures for Integrated Water Management in Smolian, Varna, Balchik and Shoumen (Lot 3) Commencement Date: 14 th July 2007 Completion Date: 17 th September 2010 Time elapsed: 100 % Financial Execution: 99 % 9 th Cohesion Fund Monitoring Committee CR 1164/94

Supply Contract Delivery of diagnostic and modeling equipment for the water and waste water network Commencement Date: 28 th of January 2008 Completion Date: 28 th September 2008 Time elapsed: 100 % Financial Execution: 100 % 9 th Cohesion Fund Monitoring Committee CR 1164/94

Compliance with Article 8 of the Financing Memorandum 8.4.b )The presentation of a final programme for the treatment, reuse and disposal of the sludge under terms acceptable to the Commission. The sludge programme was reviewed for its compliance with the requirements of the EC. The revised draft version of it had been re–submitted to the EC’s services for their review and approval. All other conditions in compliance with article 8 of the FM are to be considered as fulfilled. 9 th Cohesion Fund Monitoring Committee CR 1164/94

Thank you for your attention!