Transforming an Oil Field Waste Disposal Facility into 300 Residential Units and an Ecological Preserve- Integration of Endangered Species Impacts with Remedial Processes and Deal Structure to Align Interests Presented by Charles E. Robinson, P.E. of LFR Inc. GROWING COMMUNITIES ON KARST 2007 September 12, 2007
Presentation Outline Background Background Brief History Brief History Development Challenges Development Challenges –Previously Extinct- Ventura Marsh Milk Vetch EIR and Settlement Constraints EIR and Settlement Constraints –Development Structure Complimentary Challenges and Solutions Complimentary Challenges and Solutions
Background Located in the City of Oxnard, CA Located in the City of Oxnard, CA Near Ocean- infill property Near Ocean- infill property 90-acre landfill used for oil field waste disposal (mostly drilling muds) 90-acre landfill used for oil field waste disposal (mostly drilling muds) Operated and Land-farmed from 1954 – 1982 Operated and Land-farmed from 1954 – 1982
North Shore Site Location
Site Location
North Shore
North Shore – Pre-remediation
History Operational Disposal Facility Operational Disposal Facility “Closed” in 1981 “Closed” in 1981 Sold by original land holder in early 1990’s Sold by original land holder in early 1990’s Early investigations found TPH, Ba, VOCs, PCBs- TPH dominated approach Early investigations found TPH, Ba, VOCs, PCBs- TPH dominated approach
History RWQCB approved RAP RWQCB approved RAP –On-site treatment and disposal of waste material –Clean-up levels to be finalized EIR Performed EIR Performed –Remediation approved –Discovery of Ventura Marsh Milk Vetch –Complex Litigation and Negotiation Califonia Coastal Commission- Coastal Development Plan Califonia Coastal Commission- Coastal Development Plan –Development permitted to fund groundwater remediation
Ventura Marsh Milk-Vetch Last seen in 1983 Last seen in 1983 Listed as possibly extinct in 1993 Listed as possibly extinct in 1993 Found on the North Shore site in 1997 Found on the North Shore site in 1997 Listed as an endangered species in 2001 Listed as an endangered species in 2001 Scientific name: Astragalus pycnostachyus var. lanosissimus Scientific name: Astragalus pycnostachyus var. lanosissimus
Ventura Marsh Milk-Vetch
Ventura Marsh Milk Vetch Endangered Status required consideration through State Agencies and Courts through EIR Negotiated mitigation: – –UCSB funded to establish seed bank – –Off-site locations for Milk-Vetch Establishment – –Mitigation property – –Milk Vetch Preservation Area – –Resource Protection Area
Residential and Preserve Areas
Ventura Marsh Milk Vetch USFWS found at fault for Failure to Designate Critical Habitat – –Lack of knowledge forced “assumed” habitat designation – –USFWS designated entire Site as critical habitat to satisfy legal requirement
History Continued Project transferred to DTSC in 2004 Project transferred to DTSC in 2004 –Risk orientation –Residential land use –RWQCB rejection of ‘96 RAP RI/FS/RAP completed in late 2005 RI/FS/RAP completed in late 2005 –Consistent with RWQCB RAP Almost all affected material left on-site Almost all affected material left on-site Remedial objectives defined Remedial objectives defined Shift away from TPH focus to other chemicals- PCBs, VOCs, Dioxins, and Barium Shift away from TPH focus to other chemicals- PCBs, VOCs, Dioxins, and Barium
Site Characterization/Remediation
Remedial Action Soil Consolidation- low transport potential for PCB, Dioxin, TPH, and metals- Title 27 (Landfill) exclusion for 5’ to groundwater Soil Consolidation- low transport potential for PCB, Dioxin, TPH, and metals- Title 27 (Landfill) exclusion for 5’ to groundwater VOC Area VOC Area –High soils treated ex-situ SVE –Low soils used as SCA cap –Groundwater treatment –NAPL excavation Resource Protection Area- restricted use- Similar Demands as Soil Consolidation Area Resource Protection Area- restricted use- Similar Demands as Soil Consolidation Area
Post Remediation Cross Section
History Continued EPA- Toxic Substance Control Act EPA- Toxic Substance Control Act –PCB responsibility –Initial approach to use pre-1978 exclusion rejected because of minor soil movement –Risk based approach favored –Review of DTSC/LFR RAP –Change in approach from self-implemented to EPA discressionary review mandated ESA Section 7 Consultation
History Continued EPA/US Fish and Wildlife Service- Endangered Species Act EPA/US Fish and Wildlife Service- Endangered Species Act –Only wild Ventura Marsh Milk Vetch population –Prior designation of Critical Habitat named Primary Constituent Elements –VM Milk-vetch requires 30” to water table and Site water table is 30’ deep –“impermeable” sludge saved Milk Vetch from extinction –Evaluation of PCEs demonstrated no degradation of critical habitat Unique consideration of ESA and Remediation Unique consideration of ESA and Remediation
Development Issues- Legal and Financial Tools Employed Need to Provide Development Investors Certainty Need to Provide Development Investors Certainty –Remedial Uncertainty –Geotechnical Considerations Liquefaction Liquefaction Differential Settlement Differential Settlement Marketability Marketability Time for Completion Time for Completion Mitigation Complications Mitigation Complications
Guaranteed Site Solution Contract Aligns Interests of LFR and Development Goals Tiers of Incentives by Contract Time Consideration Downside and Upside Incentives Linkage with Insurance Forces Proactive/Thinking Project Management
Legal and Financial Tools Stop Loss Insurance on Remediation – –Based Upon Preliminary Agency Discussions and Original RWQCB RAP – –Based Upon Early Engineer’s Estimate with Contractor Input- agreed to evaluate post- RAP adoption – –Sub-limit for Mitigation Property
Changes From Inception Agency Change- RWQCB vs. DTSC Contaminant Emphasis Change – –Dioxins – –PCB- TSCA – –VOCs- DNAPL and high concentrations – –Higher volumes Vapor Concern of Agencies
Geotechnical Concerns
Remedial Action
Remediation
Status- Remediation nearly completed- October Geotechnical and Soil Treatment Costs Diminished Groundwater Costs Increased Contingency used 50%- in line with budgets Substantially below SIR Time increased for both entitlement and remedial issues
Current Site Status
Conceptual Site with Homes
Solution?
Questions?